2x ____ @ _____" O.C.
EDGE
1/2" PLYWOOD SPACER (AS REQUIRED)
STEEL LINTEL

WHAT IS THE PROCEDURE IN OBTAINING THIS PERMIT?
Either yourself, the owner of the property, your authorized agent or your licensed building
contractor, must complete and submit the building permit application along with
accompanying structural drawings with specific details of the proposed work for review for
code compliance. This review is usually completed within 24 to 48 hours depending on the
complexity of the proposed work. After the initial review of the proposed work is completed,
the property owner or the licensed contractor will be contacted by our permit technician to
schedule an appointment with the plans examiner, if necessary, to go over the details of the
planned construction, to be informed of additional requirements or to be informed of the
permit fees. After all fees has been remitted, your permit will be issued a permit number.
This permit number will be your proof that the permit had been properly issued and
construction work can begin.
1/2" PLYWOOD
SPACERSPACED
(AS REQUIRED)
1/2"
SILL ANCHORS
@ 6' FEET ON CENTER
AND WITHIN 12" OF ALL CORNERS AND BREAKS IN SILL PLATE
2-2X ____ HEADER
MINIMUM
7" CONCRETE EMBEDMENT
STRAPPED
PER SSTD 10-99
SPECIFICATIONS
MAY
BE SUBSTITUTED
WITH
SIMPSON MAS MUDSILL ANCHORS
OR APPROVED EQUAL.
CODE REQUIREMENTS
WEEPHOLES ABOVE
CONTINUOUS
Scaled foundation, floor plan, floor framing, exterior and interior load bearing wall framing FLASHING @ 33" MAX. O.C."
22 GAUGE x 7/8" WIDE CORRUGATED METAL
sections and roof framing plans. An engineering seal is not normally required unless unusual
WALL TIES SPACED 24" VERTCAL AND
33" HORIZONTALLY (STAGGERED)
framing situations warrant one or where code references do not address methods that are
15lb BUILDING PAPER OR SIMILAR TYPE
beyond the scope of written reference documents available to the plan reviewer.
3 1/2"
Electrical, plumbing and mechanical permits are required to be applied for separately from
the main permit application. If the home owner is not the person performing the work, then a
licensed professional installer must obtain the specific permit in order to complete the work.
2x PRESSURE TREATED SILL PLATE
3 1/2"

1/2" SILL ANCHORS SPACED @ 6' FEET ON CENTER
AND WITHIN 12" OF ALL CORNERS AND BREAKS IN SILL PLATE
MINIMUM 7" CONCRETE EMBEDMENT
MAY BE SUBSTITUTED WITH SIMPSON MAS MUDSILL ANCHORS
OR APPROVED EQUAL.
4"
Manufactured component and systems specification data. An example of this would be
engineered truss drawings for floor, roof systems or building kits, etc.. (If applicable)
2x4 or 2x6 STUDS @ 16" O.C.
6 MIL POLY VAPOR BARRIER
WITH MIN. 6" SEALED OVERLAPPING JOINTS
12" MINIMUM

WEEPHOLES ABOVE CONTINUOUS
FLASHING @ 33" MAX. O.C."
16" MINIMUM 12" MINIMUM
Floor plans should identify the location of electrical outlets, fixtures, switches, smoke
detectors and the main and sub-fed service panels.
16" MINIMUM

MAINTAIN 1" AIR SPACE
2x PRESSURE TREATED SILL PLATE
4"
HOUSE WRAP
16"
6 MIL POLY VAPOR BARRIER
WITH MIN. 6" SEALED OVERLAPPING JOINTS
See examples on back panels of this pamphlet
16"
MONOLITHIC SLAB W/BRICK LEDGE
NOW THAT THE PERMIT HAS BEEN ISSUED, WHAT DO I DO NEXT?
OTHER REQUIREMENTS MAY APPLY / NOT TO SCALE
After the permit has been issued, work may begin as soon as possible. Building is normally
done in steps or phases. All work performed within a specific phase must be inspected and
approved before the work of the next phase begins. There are usually four to six individual
phase inspections required. The total number of inspections depends on the type of foundation
system proposed to support the floor and wall systems. The required inspections are listed
below in order of phase:
1. Foundation
2. Floor system
3. Exterior Wall Sheathing And
Anchoring Methods
Check size, placement of required reinforcement steel
within footer trenches, width and depths of footer
trenches and vapor barrier when required.
Wood floor joists checked for proper framing prior to
applying floor sheathing or concrete slab preparation
work prior to concrete placement.
MONOLITHIC SLAB W/BRICK LEDGE
OTHER REQUIREMENTS MAY APPLY / NOT TO SCALE
ASPHALT SHINGLES DESIGNED AND
INSTALLED FOR HIGH WIND ZONES
HURRICANE CLIP
AT EACH RAFTER TO
TOP PLATE CONNECTION
Check wall stud, ceiling joist and roof rafter spacing and
span. Electrical rough wiring, plumbing and mechanical
air duct installation. Check window thermal label values.
5. Final
Complete installation of all structural framing members,
electrical devices and fixtures, plumbing fixtures and
mechanical air system. Installation of ceiling insulation.
Check for proper function of electrical devices if
energized.
It is the responsibility of the permit holder to request all the required inspections.
All inspection requests should be made at least 24 hours prior to the inspection date.
2x
METAL DRIP
EDGE
afte
_R
___
rs @
__"
___
O.C
2x ____ @ _____" O.C.
1/2" PLYWOOD SPACER
2-2X ____ HEADER
2 x ___ Studs
Check nailing patterns and spacing for all exterior
braced wall panels. Check proper spacing, type and
sizes of sill plate anchors. Check installation of
hurricane clips at roof rafter to wall top plate locations.
4. General Framing
HOW MUCH TIME DO I HAVE TO COMPLETE MY
PROJECT ONCE THE PERMIT IS ISSUED?
A permit is valid for one year after it is properly issued.
However, if there is a lapse or delay of construction for a
period longer than 6 months, the construction project will be
assumed to be abandoned and the permit will become null
and void. A new permit will be required before work is
allowed to continue. If a long delay between work phases is
expected, proper notification must be given in writing within
30 days of the work stoppage.
2x4 or 2x6 STUDS @ 16" O.C.
1/2" SILL ANCHORS SPACED @ 6' FEET ON CENTER
AND WITHIN 12" OF ALL CORNERS AND BREAKS IN SILL PLATE
MINIMUM 7" CONCRETE EMBEDMENT
MAY BE SUBSTITUTED WITH SIMPSON MAS MUDSILL ANCHORS
OR APPROVED EQUAL.
@ ____ O.C
BRACED WALL PANELS PER
CODE REQUIREMENTS
2X PRESSURE TREATED SILL PLATE
3 1/2"
It is the sole responsibility of the home owner to ensure that all the necessary permits had
been properly applied for and issued before allowing any work to start. It is highly
recommended that the owner require any hired contractor to provide proof of state and local
licensing requirements to operate a business to build, erect, alter or install building
components and/or systems before signing any contractual agreements. It is also suggested
that the person or persons who will be responsible for the construction work submit the
permit application(s). The home owner is authorized to perform as the general contractor,
project manager or job coordinator provided that the he or she lives in the building where the
work is proposed to occur. Inspection requests will be only accepted from the applicant
to whom the permit was issued to.
2x ____ @ _____" O.C.
A copy of a scaled site survey or plot plan that include the property boundary lines, the
STEEL LINTEL
footprint of existing primary building and any accessory buildings. Well, septic systems and
15lb BUILDING 1/2"
PAPER
SIMILAR
TYPE
OSB OR
(PLYWOOD)
PANELS
easement locations must also be indicated.
HOUSE WRAP
6" MINIMUM
WHO MUST OBTAIN THIS CONSTRUCTION PERMIT?
2
__ R
x __
MAINTAIN 1" AIR SPACE
WALL TIES SPACED 24" VERTCAL AND METAL DRIP
EDGE
33" HORIZONTALLY (STAGGERED)
BRACED WALL PANELS PER

.C
_" O
rs
afte
The following information is required as attachments to the general building permit application: 22 GAUGE x 7/8" WIDE CORRUGATED METAL
BUILDING PERMITS
A building permit is required for any type of room addition and for most alterations and
renovations to pre-existing residential dwellings. You should call the office of the
Department of Inspections and make an inquiry on whether a permit will be required for
the work that you propose to have done to your home or surrounding property before you
start the work. Additional fees may be applied to the permit fee if work is started before the
permit is issued.
2-2X ____ HEADER
___
STRAPPED PER
@ _ SSTD 10-99 SPECIFICATIONS
HURRICANE CLIP
AT EACH RAFTER TO
TOP PLATE CONNECTION
CODE REQUIREMENTS
6 mil Poly
Vapor Barrier
12" MINIMUM
This pamphlet is designed to assist you and/or your state licensed building contractor to
construct a room addition to an existing structure for living, sleeping or eating purposes that
complies with minimum state and local building code and zoning requirements. Local zoning
ordinances and building codes are provided to assure that all buildings within the city limits
are located and built for safe occupancy and use. The City of Hinesville’s Department of
Inspections recognizes your efforts to improve and increase the value of your home and we
appreciate the opportunity assist you with the planned construction. .
WHAT INFORMATION SHOULD I PROVIDE ALONG WITH THE MAIN PERMIT APPLICATION? BRACED WALL PANELS PER
18" MINIMUM
WHAT ARE THE REQUIREMENTS?
ASPHALT
SHINGLES DESIGNED AND INSTALLED FOR HIGH WIND ZONES
1/2" OSB (PLYWOOD)
PANELS
12"
MONOLITHIC SLAB ON GRADE
TYPICAL BUILDING SECTION DETAIL
OTHER REQUIREMENTS MAY APPLY / NOT TO SCALE
OTHER REQUIREMENTS MAY APPLY--NOT TO SCALE
BUILDING A
ROOM ADDITION
NEW ADDITION
BUILDING SETBACK
LINE
AN INFORMATION PAMPHLET PROVIDED BY THE
CITY OF HINESVILLE
DEPARTMENT OF INSPECTIONS
(912) 876-4147
(912) 876-4770 (FAX)
EXAMPLE OF FLOOR PLAN AND ELEVATION VIEWS
EXAMPLE OF A SITE SURVEY OR PLOT PLAN
REVISION DATE: JANUARY 30, 2014 - ALL PRIOR ISSUES ARE OBSOLETE