Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
SuperB Accelerator Organization •Nearest tasks •WP matrix •Organization •Time schedule 4 August 2017 Nearest tasks Project move from Conceptual Design Phase to technical design phase Fixing of the footprint to start infrastructure construction Organization: strong local team/collaboration (WP matrix structure) MAC endorsement 4 August 2017 SuperB @ Tor Vergata (S. Tomassini) Beamlines Injection complex 8/4/2017 From CD phase to TD phase Thanks to everybody who explained in the talks a status and “to do” list for the accelerator systems. Most important accelerator issues to complete CDR: Low energy option with relevant parameters SR option acceptable for HEP program and SL users New injection scheme for the Tor Vergata site Minor issues (optics cosmetic, beam dynamics, polarization, etc.) 8/4/2017 Work Package Approach The WP matrix was proposed by Pantaleo Raimondi at the Elba’11 meeting and it based on two arguments: The project can not be built by a single institution. We need to split it in more or less separate parts (deliverables, WPs). One group is responsible for one or more WPs In the end, a strong and efficient accelerator laboratory (Cabibbo Lab accelerator division?) will be established to provide operation and maintenance of the machine. Hence, this lab should (a) specify parameters of WPs, (b) inspect WPs during the project realization, (c) integrate activity of different WP groups 8/4/2017 Work Package Matrix Area services/ groups of Cabibbo Lab Work Packages/ Collaborators WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 WP9 WP10 WP11 WP12 WP13 WP14 WP15 WP16 WP17 WP18 WP19 WP20 8/4/2017 Accel. Physics Magnets Vacuum Diagnostics Feedbacks RF Power supplies Cooling Pulsed magnets Civil Engeneering Local accelerator structure based on LNF and other INFN labs and sections International and Italian collaborators Cryogenics Controls Work Package Matrix Staff Local accelerator structure. Leading role of LNF/INFN accelerator division!!! Today afternoon we’ll meet LNF acc personel who expressed their willing to participate in SuperB. More than 50% of the red line in the matrix (as it seems) can be filled in nearest future. On 14-15.12.2011 first interviewing of new candidates (~20 persons) was arranged WP collaborators. Not so many: INFN, JAI+, LAL+, BINP, SLAC, … 8/4/2017 Organization Three pillars (three legs – stable!) structure: INFN – staff + WPs BINP – integration and coordination of the project + WPs (under some conditions – support of c-tau factory from Cabibbo Lab) SLAC – PEPII equipment 8/4/2017 SuperB Accelerator Management and Coordination Structure more or less clear but personally is under discussion: - Cabibbo Lab Director General - Accelerator Director - Director Board: Technical Manager, Division Leaders (collider, injector, SR, MDI, engineering, ???), +LNF Acc Div Director - Group Leaders (red line) Very preliminary! 8/4/2017 Time schedule for 2012 Depends on a readiness of Cabibbo Lab!!! - Proto-management (acc) meeting and discussion first meeting around middle of January, Frascati Till that moment a report on the accelerator status (physics, techniques, organization, plans, etc.) based on this meeting results should be prepared (Levichev/Biagini) - Fixing of the last accelerator problems (injection, polarization, etc.), which is needed to freeze the footprint (January – March) Results will be discussed at the March collaboration meeting in Frascati - First discussion and specification for civil engineering – April/May -Accelerator groups (at least, leaders) shaping completion till March (LNF leading role!!!) - First MoU for TDR (damping rind, arc magnets and vacuum chambers, positron/electron sources, etc.) may start in or even earlier March - MAC meeting and report - Autumn 8/4/2017 Conclusions - Accelerator is basically in a good shape (main problems: low energy, polarization, SR option, injection at Tor Vergata) -Formation of accelerator structure has started -Negotiation with possible WP groups is under way -Management structure is under discussion 8/4/2017