734073 Location;
Old King’s Road
734063
N
Old King’s Road Bridge (734073) existing structure
Built in 1962
September 26, 2014 Rainstorm
Fill and compact the voids as much as possible and restore the
concrete flume over the damaged area … Done.
Inject a soil stabilizing chemical grout under the repair to force
water out, fill all the voids that could not be reached and
consolidate and bind the soil together.
Before the rain event
Fabriform Slope
Protection
Native Soil
Lehigh Canal
Erosion after the rain event
Fabriform Slope
Protection
Erosion
behind
slope
protection
Lehigh Canal
Flume removed
to repair erosion
Native Soil
Phase 1 Repair
Fabriform Slope
Protection
Void filled
with road
base
Lehigh Canal
Flume repaired
Native Soil
Phase 2 Repair (Chemical Grout Installed)
Fabriform Slope
Protection
Chemical
Grout
injected
into fill
Lehigh Canal
Native Soil
Uretek Holdings was selected to perform the
work subject to the terms, conditions and pricing
of the FDOT Contract No. BDV76, which is a
statewide contract that was competitively bid.
Uretek Holdings has agreed to perform the work
with a not to exceed cost of $39,600 with 36,000
pounds of material.
2015 Approved Budget
Budgeted
Uretek Contract
Remaining:
$50,000
$39,600
$10,400
Tentative Schedule
As soon as possible
Should be a one day job and as soon as
the contractor can work the project
into their schedule