1999
Expresso Deutschland GmbH, D-Kassel: Developing, constructing
operation multiple remote-controlled vehicles for Hanover Airport.
and
putting
into
01/2000
Molex GmbH, D-Ettlingen: Devising SPC measurements. Preparing the quality assurance
for the ISO9001 audit recertification. Basic measures for entering and storing SPC data.
09/2000
Pretema GmbH (Tyco), D-Niefern:
Construction of handling devices (feeds, sensor scanners, positioning units) for punching
machines, plastic injection machines, bending machines and welding robots.
Developing test apparatus for a truncation device for signal inserts of Bosch. Developing
a rapid gripping device.
01/2001
NUKEM Technologies GmbH - Karlsruhe Scientific Research Centre, Germany:
Constructing accessories for concrete saw machines in the completely contaminated
building sector of the WAK reprocessing plant. Topic: Demolition and renaturation (green
meadow).
05/2001
D. H. Frank Gesellschaft für CAD-Engineering, Konstruktion und Fertigung mbH, DNussloch – DIEFFENBACHER GMBH Maschinen- und Anlagenbau, D-75031 Eppingen:
Constructing a brush scarification unit as a successive unit to a particle board press.
Constructing a pick-and-place unit for a car control unit. Items for inclusion in the unit
were chokes, resistors and conductor paths. Investigating the procedural reliability of
further pick-and-place and conveyor units. Optimising a pick-and-place robot employed
in engine production.
Objective: Shortening the robotic arm routes, and thus speeding up the throughput
rates. Altering and extending exchange components of a pick-and-place robot for a
gluing operation on the rear lamp section of cars. Constructing a handling unit for motor
shafts, complete with sensor-monitored “reject part probing”.
01/2002
Langhammer GmbH, D-Eisenberg: Constructing a new floor panel packaging work stand
with previous pallet feed with elevating platform combination. Utilising drive roller
conveyors and gravitational roller conveyors.
01/2003
WES IBS GmbH, St. Michaelisdonn:
Introduction to the project management with the installation of four wind turbines
(Repower) in Nettetal. Planning, routing, cabling, site management and directing cranes
there.
Thereafter: Southern Germany - searching for and acquiring sites for wind turbines.
Planning the Hammelburg site on my own initiative. Five wind turbine plants of a
capacity of 2 MW each. Project volume approx. € 12 million.
Contracts entered into there with five municipalities, approx. 20 adjacent area contracts.
Planning: Federal Immission Control Act (BImSchG), regional plan, accompanying
landscape gardening plan, land-use plan amendment, project-related development plan.
From 2004
to 10/2008
Karlsruhe Scientific Research Centre, Germany:
Pipeline construction. Carrying out and accompanying the manufacturing and
preparatory steps, site supervision in regard to assembly and final inspection for putting
the equipment into operation. Close co-operation with TÜV Südwest (Technical
Inspection Authority) in regard to component design in accordance with the Pressure
Equipment Directive.
Newly developing, managing the construction of the prototype and putting into operation
activated carbon filters for low-temperature gases in the ultra high vacuum isolation
field.
- Constructing and designing pressure vessels in accordance with the AD2000
regulations, vacuum tanks, nitrogen shields, phase separators and components for
use in the low temperature range.
- Handling the calculation in regard to stainless steel containers and parts
- Static calculation and construction of steel structures
- Expertise in the field of low temperature with liquid helium (-269°C)
- Basic knowledge about temperature sensors in the field of low temperature, optically
and capacitively
- Creating and altering R&I schemes for process engineering (MSR technology)
- Designing pipelines, expertise in pipeline construction in the field of plant construction
- Expertise in the field of arc welding, laser welding and spark eroding
Joerg Brand, Karlstrasse 8, D-68794 Oberhausen-Rheinh. +49(0)(171) 5495300 Status 01/11/2015
-
Software used: AutoCad, Inventor 3D, Catia V5, CorelDraw, Access database
Languages: German and English - full professional proficiency
8/2008 - 10/08
Guth engineering, D-Landau Customer EFES Vitanta, Brewery, Chişinău, Moldova:
Six weeks spent as a supervisor in regard to the installation of electric switch panels for
the extension of new brewing equipment. Site supervision in regard to construction work
concerning cable routes and pipelines.
Project volume in my sphere of responsibility approx. € 1 million.
Project completed in good time
1/2009 - 03/09
Alpha Konstruktion GmbH, Consulting Engineers, Customer: Flexlink GmbH, DOffenbach.
Creating layouts and production drawings of flexible conveyor systems for customers in
the field of solar technology.
Constructing additional and adaptation components, handling systems for material
transported of up to 40 kg in weight and drive units up to a capacity of 500W.
Adjustment of customer applications.
Software used:
- 3D Autodesk Inventor 2011
- AutoCAD Mechanical 2011
- Vault 2009, database
- MS Office
4/2009 - 12/09
KIT, Karlsruher Institut für Technologie:
Pipeline construction. Carrying out and accompanying the manufacturing and
preparatory steps, site supervision in regard to assembly and final inspection for putting
the equipment into operation.
10/2009
Lecturer at the Duale Hochschule Karlsruhe (Baden-Württemberg Cooperative State
University) in the field of the theory and practice of design and construction.
2010
Philippsburg: Planning, developing, constructing, calculating, site supervision and
assembly of a 100 kWp photovoltaic plant in Philippsburg.
Planning, constructing and erecting a 750 m² car port with construction of the
foundation.
Supplier planning, financial planning and implementing the project.
Successfully putting the plant into operation in December 2010.
As from 1/2010
KIT, Karlsruher Institut für Technologie:
Monitoring the construction and handling responsibilities in the quality assurance of the
construction of a superconductive high-energy magnet.
Production monitoring, checking the calculations, monitoring the preliminary tests and
checking the documentation in regard to the preliminary tests, checking calculations of
pressure vessels, thermal transfers and material flows. Preparing the infrastructure for
installation in a hall. Site supervision in regard to the installation.
As from 1/2011
KIT, Karlsruher Institut für Technologie:
Inventions in the field of HTS (high-temperature superconductors). These included
laminated conductors which support the superconductor and the matching devices for
the tests.
The prototypes carry a superconductive band (HTS), the current-carrying capacity of
which is tested:
Constructing various parts for such devices.
Researching new materials for applications in the cryogenic state (-269°C).
Evaluating individual parts and components following laboratory tests.
Percentage participation in the patent rights.
Constructing pressure vessels for cryogenic operation.
Joerg Brand, Karlstrasse 8, D-68794 Oberhausen-Rheinh. +49(0)(171) 5495300 Status 01/11/2015
6/13 - 08/13
Providing technical assistance for a humanitarian project of Engineers Without Borders at
Karlsruhe University (KIT Campus South). Constructing a water cistern in Haiti.
Solar planning of a water cistern in Haiti. Building specification, planning,
implementation on site. Planning the supply of the electric pump with solar energy.
Creating the reinforcement drawings for the base plates.
As from 9/2013
KIT, Karlsruher Institut für Technologie:
Taking over a project from the colleague until completion:
Monitoring the assembly of a pilot plant for power leads in the range of 10,000 A for
operating cryogenically down to 4 °K (-269°C). Monitoring, adapting and changing the
plans of pipelines, valves for liquid helium and nitrogen.
Altering and constructing flange covers for vacuum tanks in accordance with AD2000.
Controlling the positions of the measuring devices, such as a flow meters, bus systems
and sensor systems.
Constructing and adapting positions for water-cooled high-current lines of HOMA for the
testing plant. Constructing stainless steel/glass fibre reinforced plastic/isolated
combinations of cable routes and guides for 1kV and 5kV operation.
Statics and construction for a steel stage extension.
Checking and altering the exhaust pipes for helium and nitrogen. Further alteration and
adaptation of the safety installations, as well as safety valves.
Constructing additional measuring components, introduced into vacuum tanks, taking
into account corresponding impermeability in the range of 10^(-9) mbarl/s.
05/14
Direct involvement in the establishment of the “Sunesty, Corp.” subsidiary in San
Francisco, USA:
Handling tasks as CEO in the field of solar energy, photovoltaics, Net Zero Energy
House. Project planning of rooftop installations, Rental Property Energy Systems.
Joerg Brand, Karlstrasse 8, D-68794 Oberhausen-Rheinh. +49(0)(171) 5495300 Status 01/11/2015