Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
TOWN OF BETHLEHEM INSTRUCTION SHEET for SWPPP REVIEW FORMS Instructions: These steps below demonstrate when each of the specific SWPPP Review Forms are to be submitted to the Town for a project that is required to provide post-construction Stormwater Management Practices (SMPs). Those projects required to prepare only an Erosion and Sediment Control (E&SC) Plan must complete the SWPPP Application Review Checklist when a Site Plan or Subdivision Application is submitted to the Town. Required steps for the submission of a Sketch Plan Application to the DPC Form 1: SMP Selection Matrices Form (Contains matrices for the selection of appropriate Stormwater Management Practices) Step 1: Submit completed form to the Development Planning Committee (DPC) Step 2: Engineering Division staff provide direct feedback on proposed SMP(s) Proceed to the next step if continuing with the Town project approval process Required steps for the submission of a Site Plan or Subdivision Application Form 2: SWPPP Application Review Checklist (Contains the minimum required components for a SWPPP based on the type of project) Form 3: SMP Design Review Worksheet (Contains required elements for the specific types of Stormwater Management Practices) Step 3: Submit forms, the SWPPP, and the Site Plans to Economic Development & Planning (ED&P) with the Stormwater Management Certification Form - Part A Step 4: Engineering Staff reviews documents and provides ED&P with comments Step 5: ED&P coordinates Planning Board approval of the SWPPP and Site Plans Last Updated: March 2009 www.townofbethlehem.org/pages/Stormwater/dpwSWStormwater.asp