Download New Dust Burner: Unique System Solution for Special Customer

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Behavior of nuclear fuel during a reactor accident wikipedia , lookup

Fluid catalytic cracking wikipedia , lookup

Oil refinery wikipedia , lookup

Fuel oil wikipedia , lookup

Cosmic dust wikipedia , lookup

Transcript
New Dust Burner: Unique
System Solution for Special
Customer Requirements.
With increasing frequency customers are requesting special solutions, as
did M/s. Loesche in Düsseldorf. For a plant project in Russia they were
looking for a firing system which took particular fuel specifications into
consideration. With a large-scale firing test in the testing facility of Körting
Hannover AG it was possible to test the suitability of the fuel successfully.
The Düsseldorf mill specialist
Loesche was on the look-out for
a dual-fuel burner system to fire
lignite dust and heavy oil for a
dryer plant. The problem thereby
was, however, the characteristics
of the coal dust which
deviated in its chemical
composition from the usual
characteristics. First of all,
a firing test was carried out
at the Körting dust burner
test facility to ensure the
technical feasibility of the
project. “By means of the
Flexible firing system: The particular specifications of the pure lignite dust are taken into consideration.
results we were able to adjust
the firing system specifically to the fuel requirements“,
Hennig GmbH offers the possibility of contributing a
as Dr. Benedikt Roberg, Director of the affiliated
sophisticated special manufacturing in the sectors
Körting company, Hans Hennig GmbH, stated. So
of automation technology and fuel supply systems.
therefore nothing stood in the way of realising this
So the burner and the dust dosing unit were
project. “No other manufacturer of dust burners has
manufactured by Körting Hannover AG, the switching
comparable possibilities“, reported Dr. Benedikt
unit and the heavy oil pump station with heavy oil preRoberg. Indeed, here problematical fuels can be
heater by Hans Hennig GmbH in Ratingen.
tested in the test facility with regard to the suitability for
generating heat. “Only so can we offer our customers
Low Pollutant Emissions
the security of our adherence to the required firing
system characteristics.“
“The strength of the system lies just in its flexibility“,
as Dipl.-Ing. Michael Branzke, Project Manager at
Körting Hannover AG explained. ”The firing system
Successful Mutual Project
is in a position of being able to fire lignite dust and
The project was processed and developed by Hans
heavy or light fuel oil simultaneously as well as in
Hennig GmbH in collaboration with Körting Hannover
solo operation mode. The automatic firing device
AG. Körting Hannover AG supplied the necessary
which we have parameterised permits an automatic
know-how and the required equipment to construct
fuel switch-over between pulverous and liquid fuels.
and test the dust burners. In this combination, Hans
“The decisive factor thereby is however, that with
the Körting-/Hans Hennig technology a solo dust
operating mode with a large control range can be
realised without additional support firing. Of course,
the basic requirements thereby are low pollutant
emissions under all operating conditions. Again,
Körting Hannover AG’s excellence is demonstrated
and reinforced by a strong affiliated company,
Hans Hennig GmbH, in a niche of developing
tailor-made products in accordance with customer
requirements. The Düsseldorf mill specialist Loesche
expressed itself as being extremely satisfied with the
professional processing of the order.
Supply train for heavy oil: Automatic fuel switch-over.
At a glance
Application of a firing system for generating hot gas
System components: Dual-fuel burner, combustion air supply, dust
dosing, heavy oil pump station with oil pre-heater, switching unit with
local controls and output switchboard cabinets
Firing performance
Dust/Heavy oil:
17.000 kW
Control ratio:
1:5 for dust
Dust consumption:
2.800 kg/h
Heavy oil consumption:
1.600 l/h
Air excess:
1.5-2.0
Air supply:
34.000 Nm³/h
Firing manager:
FMS 5 with electronic compound
Plant for lignite dust dosing.
Further information and contact:
Michael Branzke
Dr. Benedikt Roberg
Dust Burner Projecting
Manager Development of Heat Technology Products
Körting Hannover AG
Körting Hannover AG
+49 511 2129-398
and Director of Hans Hennig GmbH
[email protected]
+49 511 2129-372
[email protected]
www.koerting.de
www.hanshennig.de