Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
NORTHSIDE COMMUNITY CIVIC CENTRE North Sydney, Nova Scotia “The hockey players have said it’s the best ice they’ve ever skated on.” Monique Cashin, General Manager Specifications Building Size: 82,000 Sq. Ft. Owner(s): Cape Breton Regional Municipality Number of Kubes: 6 Size of Kube(s): 32 tons Overview Energy Medium: Wells The Northside Community Civic Centre was recently built in the spring of 2011, featuring an NHL-sized 85ft. by 200 ft. ice sheet. Each of the six unisex dressing rooms are approximatley 700 square feet with three showers, two sinks, and two commodes. The team lockers are fully securable and air vented to dry and store equipment between match-ups. Function: Ice Production & Structure Heat Cooling Distribution: Ice slab Heating Distribution: The building Unique Detail(s): Home to the Cape Breton Screaming Eagles of the Quebec Major Junior Hockey League Project Completion: 2011 Constructed by DORA Construction, the Kubes produce ice while concurrently taking heat out of the ice that is sent throughout the building. It is possbile, and currently scheduled for the arena to operate 365 days a year because the steady temperature of the earth (geothermal) provides the energy source for the rink. The arena features radiant heating throughout the bleacher seats, rink apron, front lobby and walking track for spectator comfort. The arena area can be air conditioned with the Kubes for concerts and shows.