Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
INDEX OF STANDARDS FOR BRIDGE CONSTRUCTION THESE STANDARDS MAY BE REFERRED TO ON THE DESIGN DRAWINGS IN LIEU OF SHOWING SPECIFIC DETAILS PROVIDED COORDINATING INFORMATION IS SHOWN ON THE DESIGN DRAWINGS. STD. DWG. NO. TITLE NO.OF SHTS. DATE STD. DWG. NO. TITLE NO.OF SHTS. DATE BC-700M INDEX OF STANDARDS 1 NOV. 21, 2014 BC-751M BRIDGE DRAINAGE 7 NOV. 21, 2014 BC-701M PROTECTIVE FENCE 3 NOV. 21, 2014 BC-752M CONCRETE DECK SLAB DETAILS 2 NOV. 21, 2014 BC-703M THRIE-BEAM TO VERTICAL WALL BRIDGE 2 NOV. 21, 2014 BC-753M STEEL GIRDER DETAILS 2 NOV. 26, 2013 BC-754M STEEL DIAPHRAGMS FOR STEEL BEAM/ 2 OCT. 26, 2010 PA STRUCTURE MOUNTED GUIDE RAIL BARRIER 1 NOV. 21, 2014 PA HT BRIDGE BARRIER 5 BARRIER TRANSITION CONNECTION BC-706M BC-707M BC-708M THRIE-BEAM TO PA TYPE 10M BRIDGE GIRDER STRUCTURES (STRAIGHT GIRDERS ONLY) MAY 18, 2012 2 NOV. 26, 2013 12 NOV. 21, 2014 BC-755M BEARINGS 4 NOV. 26, 2013 BC-756M HIGH LOAD MUTI ROTATIONAL 6 NOV. 26, 2013 POT BEARINGS BARRIER TRANSITION CONNECTION BC-709M PA TYPE 10M BRIDGE BARRIER BC-711M ALUMINUM PROTECTIVE BARRIER 4 NOV. 21, 2014 BC-712M THRIE-BEAM TO PA BRIDGE BARRIER 2 MAY 18, 2012 13 OCT. 26, 2010 BC-757M STEEL PILE TIP REINFORCEMENTS & SPLICES 3 NOV. 26, 2013 BC-762M TOOTH EXPANSION DAM FOR PRESTRESSED 7 NOV. 26, 2013 2 OCT. 26, 2010 6 NOV. 26, 2013 CONCRETE & STEEL BEAM BRIDGES TRANSITION CONNECTION BC-713M PA BRIDGE BARRIER BC-716M ALUMINUM PEDESTRIAN RAILING 2 MAY 18, 2012 BC-718M ALTERNATE RAILING DETAILS 1 OCT. 26, 2010 BC-719M TEMPORARY CONCRETE BARRIER, 8 OCT. 26, 2010 STRUCTURE MOUNTED BC-720M ALUMINUM OR STEEL BRIDGE HAND RAILING 1 MAY 18, 2012 BC-721M ELECTRICAL DETAILS 2 OCT. 26, 2010 BC-722M LIGHTING POLE ANCHORAGE 2 NOV. 21, 2014 BC-723M BRIDGE ANTI-ICING SYSTEM 10 OCT. 26, 2010 BC-731M CEMENT CONCRETE SLOPE WALL 1 MAY 18, 2012 BC-732M PERMANENT METAL DECK FORMS 4 OCT. 26, 2010 BC-734M ANCHOR SYSTEMS 3 OCT. 26, 2010 BC-735M WALL CONSTR. & EXP. JOINT DETAILS 1 OCT. 26, 2010 BC-736M REINFORCEMENT BAR FABRICATION 3 MAY 18, 2012 2 MAY 18, 2012 DETAILS BC-739M BC-741M BRIDGE BARRIER TO GUIDE RAIL TRANSITION OVERHEAD SIGN STRUCTURES-CANTILEVER 6 BC-766M PREFORMED NEOPRENE COMPRESSION SEAL JOINT FOR APPROACH SLABS BC-767M NEOPRENE STRIP SEAL DAM FOR PRESTRESSED CONCRETE & STEEL I-BEAM BRIDGES BC-770M STEEL INTERMEDIATE DIAPHRAGMS FOR PRESTRESSED I-BEAM AND BULB-TEE BEAM BRIDGES 4 NOV. 21, 2014 BC-772M PRESTRESSED CONCRETE BEAM BRACING 5 OCT. 26, 2010 BC-775M MISCELLANEOUS PRESTRESS DETAILS 3 NOV. 26, 2013 BC-776M GROUND MOUNTED SOUND BARRIERS PRECAST CONCRETE PANELS 7 BC-777M GROUND MOUNTED SOUND BARRIERS PRECAST CONCRETE POSTS 12 NOV. 26, 2013 BC-778M GROUND MOUNTED SOUND BARRIERS STEEL POSTS 10 NOV. 26, 2013 BC-779M STRUCTURE MOUNTED SOUND BARRIER WALLS 9 NOV. 26, 2013 BC-780M OFFSET SOUND BARRIER WALLS 8 OCT. 26, 2010 BC-781M RANDOM STONE SLOPE WALL 1 MAY 18, 2012 BC-782M GABION SLOPE WALL DETAILS 1 MAY 18, 2012 BC-783M REINFORCED CONCRETE REPAIR 4 NOV. 26, 2013 BC-788M TYPICAL WATERPROOFING AND 12 NOV. 21, 2014 1 NOV. 26, 2013 OCT. 26, 2010 NOV. 21, 2014 & CENTER-MOUNT STRUCTURES STRUT LENGTHS UP TO 40' BC-742M OVERHEAD SIGN STRUCTURES-TAPERED 6 NOV. 26, 2013 EXPANSION DETAILS TUBE STRUCTURES SPANS FROM 30'TO 80' BC-743M OVERHEAD SIGN STRUCTURES-2 POST 10 NOV. 26, 2013 BC-794M PLANAR TRUSS SPANS FROM 30'TO 100' BC-744M DETAILS, PRESTRESSED BRIDGES OVERHEAD SIGN STRUCTURES-2 POST & 4 POST TRI-CHORD TRUSS SPANS FROM UTILITY ATTACHMENT & SUPPORT 12 NOV. 26, 2013 60' TO 240' BC-798M MECHANICAL CONNECTION DETAILS 3 NOV. 26, 2013 BC-799M MECHANICALLY STABILIZED EARTH 13 NOV. 21, 2014 RETAINING WALLS BC-745M OVERHEAD SIGN STRUCTURES-4 POST 10 NOV. 26, 2013 4 CHORD TRUSS SPANS FROM OCTOBER 2010 EDITION 100' TO 200' BC-747M MONOPIPE SIGN STRUCTURES 6 NOV. 26, 2013 Click on desired Standard to view. Yellow, green and blue highlighting used to indicate Change 1, 2 & 3 revisions, respectively. To obtain a clean printout version, select "Document" in the "Comments and Forms:" dialogue box under the "Print" command. SEE CHANGE #1 FOR MAY 18, 2012 STANDARD REVISIONS. SEE CHANGE #2 FOR NOV.26, 2013 STANDARD REVISIONS. SEE CHANGE #3 FOR NOV.21, 2014 STANDARD REVISIONS. NOTE: THE INFORMATION PREVIOUSLY CONTAINED ON BC-795M HAS BEEN INCORPORATED INTO PUBLICATION 222. BC-700M