Download bolt heating equipment

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Ground loop (electricity) wikipedia , lookup

Power inverter wikipedia , lookup

Power engineering wikipedia , lookup

Variable-frequency drive wikipedia , lookup

Electrification wikipedia , lookup

Islanding wikipedia , lookup

Ground (electricity) wikipedia , lookup

Mercury-arc valve wikipedia , lookup

Opto-isolator wikipedia , lookup

Current source wikipedia , lookup

Ohm's law wikipedia , lookup

Power MOSFET wikipedia , lookup

Electrical ballast wikipedia , lookup

Resonant inductive coupling wikipedia , lookup

Electrical substation wikipedia , lookup

Three-phase electric power wikipedia , lookup

Stray voltage wikipedia , lookup

Resistive opto-isolator wikipedia , lookup

Transformer wikipedia , lookup

History of electric power transmission wikipedia , lookup

Triode wikipedia , lookup

Surge protector wikipedia , lookup

Distribution management system wikipedia , lookup

Rectifier wikipedia , lookup

Earthing system wikipedia , lookup

Buck converter wikipedia , lookup

Transformer types wikipedia , lookup

Voltage optimisation wikipedia , lookup

Switched-mode power supply wikipedia , lookup

Alternating current wikipedia , lookup

Mains electricity wikipedia , lookup

Transcript
TC 5 1812
PRODUCT STANDARD
TURBINES & COMPRESSORS
REV 02
HYDERABAD
PAGE 1 OF 3
BOLT HEATING EQUIPMENT
(ELECTRICAL)
APPLICATION : The joint flange bolts of turbines need considerable pretensioning
because of the longitudinal expansion which occurs under operating conditions. This
pretensioning of the bolts can be achieved by either.
The application of suitably high mechanical force to the bolts when cold or heating
the bolts and screwing down the nuts while in this hot condition.
The joint flange bolt heating unit is used for heating the bolts to allow the
subsequent screwing down of the nuts to give the required preloading. The heating effect is
generated by passing a high electric current through the bolt to be expanded (RESISTANCE
HEATING).
FUNCTION OF THE EQUIPMENT : The function of the heating transformer is to
convert the available mains current into a current suitable for the heating process. This
current is then fed to the ends of the bolts through water-cooled leads and electrode.
MODE OF OPERATION AND DESCRIPTION OF THE UNIT : The units is
connected to the mains by a power supply cable. Actuating the “ON/OFF” toggle switch on
the front panel connects the primary side of the TRANSFORMER to the mains through
water-cooled thyristors. The high primary voltage is stepped down to a lower secondary
voltage. The THYRISTORS, the HEATING TRANSFORMER and the SECONDARY
LEADS are WATER-COOLED and have flow monitors. The current flowing in the
secondary-circuit, which depends on the series resistance’s in this circuit (leads, electrodes,
bolts), heats the bolts to the required temperature in approximately 2 to 10 minutes.
TECHNICAL DATA :
Heated power
Primary Voltage
Secondary Voltage
Primary Current
Secondary Current
Type of Control
FORMAT
TD-201
REV -00
REF DOC
:
:
:
:
:
:
125/160 KVA at 50 % duty factor
380/415 V DC / 50 Hz 2 phase
8.6 / 11.9 V
330/320 A at 50 % duty factor
10/14 kA at 50 % duty factor
SJTAKI TS 311-LA or equivalent indigenous design
E 89100 – B 14 76 – S 1
PREPARED BY:
S.Mahesh Kumar
APPROVED BY:
M.Rosi Babu
DATE: 10.03.04
COPY RIGHT AND CONFIDENTIAL
The information on this document is the property of BHEL. It must not be used
directly or indirectly in any way detrimental of company.
TC 5 1812
PRODUCT STANDARD
TURBINES & COMPRESSORS
REV 02
HYDERABAD
PAGE 2 OF 3
SCOPE OF SUPPLY :
1.0) List of Equipment :
1.1)
1.2)
1.3)
1.4)
1.5)
1.6)
1.7)
1.8)
1.9)
Low voltage fuse isolator with HRC fuses size 2/400 A – 1 No.
Heating transformer - 1 No.
Phase-angle control comprising : Thyristor box with N-type thyristors : 1 No.
Flow monitors in cooling water circuit : 2 Nos.
Secondary leads, water-cooled, 2 x 300 mm2 , 3.5 m long – 2 Nos.
Cable spacer for clamping the secondary leads together – 3 Nos.
Primary supply cable 3 x 150 / 70 / 3 mm2 , 25 m long – 1 No.
Water hoses 1 ” - 3.0 m long (water supply and discharge) - 2 Nos.
Hexagon bolts M16, Material 21 Cr Mo V 57 or equivalent.
Material Code: TC 9751812003
FORMAT
TD-202
REV-00
COPY RIGHT AND CONFIDENTIAL
The information on this document is the property of BHEL. It must not be used
directly or indirectly in any way detrimental of company.
TC 5 1812
PRODUCT STANDARD
TURBINES & COMPRESSORS
REV 02
HYDERABAD
PAGE 3 OF 3
RECORD OF REVISIONS
RE
V.N
O00
DATE
REVISION DETAILS
REVISED
APPROVED
20/06/90
NEW
K.Ch.P
K.Ch.P
01
14/10/03
List of tools Modified.
S.M.K.
D.S.R.
02
10/03/04
List of tools at S.No.2
removed.
S.M.K.
M.R.B.
FORMAT
TD-203
REV-00
COPY RIGHT AND CONFIDENTIAL
The information on this document is the property of BHEL. It must
not be used directly or indirectly in any way detrimental of company.