* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download bolt heating equipment
Ground loop (electricity) wikipedia , lookup
Power inverter wikipedia , lookup
Power engineering wikipedia , lookup
Variable-frequency drive wikipedia , lookup
Electrification wikipedia , lookup
Ground (electricity) wikipedia , lookup
Mercury-arc valve wikipedia , lookup
Opto-isolator wikipedia , lookup
Current source wikipedia , lookup
Power MOSFET wikipedia , lookup
Electrical ballast wikipedia , lookup
Resonant inductive coupling wikipedia , lookup
Electrical substation wikipedia , lookup
Three-phase electric power wikipedia , lookup
Stray voltage wikipedia , lookup
Resistive opto-isolator wikipedia , lookup
Transformer wikipedia , lookup
History of electric power transmission wikipedia , lookup
Surge protector wikipedia , lookup
Distribution management system wikipedia , lookup
Earthing system wikipedia , lookup
Buck converter wikipedia , lookup
Transformer types wikipedia , lookup
Voltage optimisation wikipedia , lookup
Switched-mode power supply wikipedia , lookup
TC 5 1812 PRODUCT STANDARD TURBINES & COMPRESSORS REV 02 HYDERABAD PAGE 1 OF 3 BOLT HEATING EQUIPMENT (ELECTRICAL) APPLICATION : The joint flange bolts of turbines need considerable pretensioning because of the longitudinal expansion which occurs under operating conditions. This pretensioning of the bolts can be achieved by either. The application of suitably high mechanical force to the bolts when cold or heating the bolts and screwing down the nuts while in this hot condition. The joint flange bolt heating unit is used for heating the bolts to allow the subsequent screwing down of the nuts to give the required preloading. The heating effect is generated by passing a high electric current through the bolt to be expanded (RESISTANCE HEATING). FUNCTION OF THE EQUIPMENT : The function of the heating transformer is to convert the available mains current into a current suitable for the heating process. This current is then fed to the ends of the bolts through water-cooled leads and electrode. MODE OF OPERATION AND DESCRIPTION OF THE UNIT : The units is connected to the mains by a power supply cable. Actuating the “ON/OFF” toggle switch on the front panel connects the primary side of the TRANSFORMER to the mains through water-cooled thyristors. The high primary voltage is stepped down to a lower secondary voltage. The THYRISTORS, the HEATING TRANSFORMER and the SECONDARY LEADS are WATER-COOLED and have flow monitors. The current flowing in the secondary-circuit, which depends on the series resistance’s in this circuit (leads, electrodes, bolts), heats the bolts to the required temperature in approximately 2 to 10 minutes. TECHNICAL DATA : Heated power Primary Voltage Secondary Voltage Primary Current Secondary Current Type of Control FORMAT TD-201 REV -00 REF DOC : : : : : : 125/160 KVA at 50 % duty factor 380/415 V DC / 50 Hz 2 phase 8.6 / 11.9 V 330/320 A at 50 % duty factor 10/14 kA at 50 % duty factor SJTAKI TS 311-LA or equivalent indigenous design E 89100 – B 14 76 – S 1 PREPARED BY: S.Mahesh Kumar APPROVED BY: M.Rosi Babu DATE: 10.03.04 COPY RIGHT AND CONFIDENTIAL The information on this document is the property of BHEL. It must not be used directly or indirectly in any way detrimental of company. TC 5 1812 PRODUCT STANDARD TURBINES & COMPRESSORS REV 02 HYDERABAD PAGE 2 OF 3 SCOPE OF SUPPLY : 1.0) List of Equipment : 1.1) 1.2) 1.3) 1.4) 1.5) 1.6) 1.7) 1.8) 1.9) Low voltage fuse isolator with HRC fuses size 2/400 A – 1 No. Heating transformer - 1 No. Phase-angle control comprising : Thyristor box with N-type thyristors : 1 No. Flow monitors in cooling water circuit : 2 Nos. Secondary leads, water-cooled, 2 x 300 mm2 , 3.5 m long – 2 Nos. Cable spacer for clamping the secondary leads together – 3 Nos. Primary supply cable 3 x 150 / 70 / 3 mm2 , 25 m long – 1 No. Water hoses 1 ” - 3.0 m long (water supply and discharge) - 2 Nos. Hexagon bolts M16, Material 21 Cr Mo V 57 or equivalent. Material Code: TC 9751812003 FORMAT TD-202 REV-00 COPY RIGHT AND CONFIDENTIAL The information on this document is the property of BHEL. It must not be used directly or indirectly in any way detrimental of company. TC 5 1812 PRODUCT STANDARD TURBINES & COMPRESSORS REV 02 HYDERABAD PAGE 3 OF 3 RECORD OF REVISIONS RE V.N O00 DATE REVISION DETAILS REVISED APPROVED 20/06/90 NEW K.Ch.P K.Ch.P 01 14/10/03 List of tools Modified. S.M.K. D.S.R. 02 10/03/04 List of tools at S.No.2 removed. S.M.K. M.R.B. FORMAT TD-203 REV-00 COPY RIGHT AND CONFIDENTIAL The information on this document is the property of BHEL. It must not be used directly or indirectly in any way detrimental of company.