Download Lighting - Church of the Holy Family

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Sound reinforcement system wikipedia , lookup

Public address system wikipedia , lookup

Transcript
Church of the
Holy Family
Parish Town
Hall Meeting
November 10, 2016
Opening Prayer
Church Worship Space and Chapel (30 Min)
• Sound & Video
• Lighting
• Heating and Air
• “The Flood”
Family Room (15 Min)
• Sound & Video
• Lighting
• Windows
• Family Room
• Other Locations
• Paint
• Carpet
• Partitions
Kitchen (5 Min)
• Equipment & Shelving
• Hood (Ceiling & Access)
Cooling Tower (5 Min)
Signs (5 Min)
Questions & Closing Prayer
Presenters
Fr. Gaudy
• Prayer
• Opening remarks
Building Committee
• Bob Magoon
• Glenn Rodriguez
• John Weirsch
Onyx
•Chris Lawson
PACE Collaborative
• Eddie Abrams
• Gintaras Gelzinis “G”
Worship Space Sound & Video
SOUND
• Modeled to determine present sound distribution
• Looked at several ways to get wider distribution
• Central Speaker Cluster doesn’t work well
• Opted for two main locations
• Reduce feedback & improve gain (sound louder)
• Speakers will disburse better to circular shape
• Finished to minimize presence
• Auxiliary speakers to choir area and left of presider
• CHOIR PLATFORM
• Multiple monitor speakers & microphones
• Possible ceiling treatment (reflect sound & accommodate lights)
• Hearing Loop system for those with hearing aids
• Integrate organ components as required
ONYX AUDIOVISUAL
SOUND SYSTEM DESIGN
FOR
CHURCH OF THE HOLY FAMILY
S
Ambo
Ambo
Projected coverage of New Sound
System
Location of Current Sound System
`
`
S
Ambo
Coverage of Current Sound System
Worship Space Sound & Video
VIDEO
• Focus was to provide better image and sound in remote locations
• Replace Camera with one that can pan, zoom, and tilt
• Ruled out multiple camera options
• Video Sound comes from sound system rather than camera
• Using sound from sound system enables us to control feedback
• Feeds will go to Family Room, Nursery, etc.
• Use ceiling mounted monitor in commons for extra seating
• Extendable to additional monitors in Family Room
• Continue to use portable screens for Vacation Bible School
Worship Space Lighting
•
•
•
•
•
•
•
•
Present lighting about 50% of suggested design standards
Present system not efficient
Proposed lights all dimmable LED, “Warm” level
Choir has additional lighting from above & behind
Stained glass will be lit separately to show at night from outside
High Bay Area lit with LED low level tape lights when desired
Remainder lit from 4 primary fixtures + 3 smaller corner fixtures
Eliminate fluorescent indirect lighting we have now
(Picture of Lights)
•
•
•
•
Elegant, but not extravagant design
Brushed brass finish blends well
Light disburses all directions, including up to reflect
The Color Temperature will be warm
Lighting
Locations
Chapel Lighting to Replace Chandelier
Worship Space Heating and Air
Goal
• Eliminate below floor return air plenums
• Solve water infiltration
• Control outside noise and fresh air intake
Solution will
• Provide wall returns near doors
• Replace 4 heat pump units
• Minimize noise
• Block off wood louvers
• Allow for fresh air to meet code standards
• Program sysyem for better temperature response
“The Flood”
• Picture shows Worship space on Sunday morning after Hurricane Matthew
• Water 1” at center, 2” at edge
• Poorly lit because power was out
“The Flood”
•
•
•
•
Louvers Open to Outside all year long
Hurricane driven rain hits screen and falls, then drips from wood
Happened before, not this bad, & cleaned as it fell
Working with foundation team, but unlikely water came from below
Family Room
Sound
• Ceiling Mounted speakers
• Floor jack access points
• Rooms independently controlled
Video
• Dedicated Audiovisual Carts
• Portable Screens
• Monitors on Mobile carts
Family Room
Lighting
• Will provide appropriate
levels of lighting similar to the
rest of the room
• Color of light will match
color of fluorescents
Family Room
Windows
• Three Family Room, double wood windows removed
• Replaced with aluminum windows, bottom vents only
• Removing High Bay monitor windows to reflash the base portion
• Replacing other windows in building that lost seal
• Replace Skylights in commons
Paint
• Repaint and replace seams at joints
• Fix windows first, but paint before carpet
Carpet
• See samples on table
• Dance floor area thickness matches to eliminate rubber strip
Partitions
• Outward appearance similar, but better track system
• Last job in Family Room, likely a year from now
Family Room Carpeting
Kitchen
Existing Equipment Replacements
• Replace Convection Oven
• Replace Stove with 6 burner unit and griddle
• Replace Deep Fat Fryer
• Replace Dishwasher
• Replace and add shelving in Kitchen and Pantry areas
Hood
• Required to meet code when equipment replaced
• Improved air flow and temperature control
• Will have to install new ceiling and lighting
• Will also require roof access in chair storage room
Cooling Tower
• Replace “BAC” tower which is inoperative
• Work done during off season
• Connect drainage to sanitary system
Signs
•
•
•
•
•
Refurbish Corner sign and include “Catholic Church”
Size of letters in message area will be smaller
Change Bronze Columbarium: replace “2010” with “Columbarium”
Replace sign portion of low sign at main entrance
Add “Office” to side of mailbox brickwork
Living Our Mission
Parish Share: $816,120
As Approved by Diocese
• Element 1: $500,000 for Heating,
Air Conditioning, Sound and
Lighting In the Worship Space
• Element 2: $50,000 to Replace
Kitchen Equipment
• Element 3: $100,000 Social
Ministry Endowment
• Element 4: $166,120 Living
Our Mission Building Fund
LIVING OUR
MISSION
CHURCH OF THE HOLY FAMILY BUILDING PROJECTS
Estimated construction schedule (Aug 2016 update)
2016-2017
Kitchen
2016
Jul
Sep
Nov
2017
Cooling Tower
Exterior Signs
10 weeks
8 weeks
Family Room Lighting & Shades
CAPITAL RESERVE
Mar
6 weeks
4 months
May
Jul
Family Room Flooring
Kitchen,
$50,000
Nov
2017
6 weeks
4 weeks
Family Room Windows
Denotes change
from last schedule
4 weeks
CAPITAL RESERVE FUNDS
Total - $240,500
Exterior Signs,
$20,000
Sanctuar
y,
$500,00
0
Sep
Family Room Partitions
4 weeks
Family Room Painting
LIVING OUR MISSION FUNDS
Total = $816,120
Addition
al
Building
Fund,
$166,12
Social 0
Ministry
Endowme…
Completion
Sanctuary
4 weeks
Family
Room
Partitions,
$55,000
Family Room
Flooring,…
Family Room Windows,…
Cooling
Tower,
$64,000
Family
Room
Lighting
and
Shades,
$21,500
Family Room
Painting,…
Questions
Closing Prayer