Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Distillation Plant S.N. 1 1.1 2 2.1 2.2 2.3 3 3.1 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 4.11 4.12 5 5.1 6 6.1 6.2 6.3 7 7.1 7.2 8 8.1 9 9.1 10 10.1 Purchaser’s Specifications Distillation Plant Manufacturer Brand Type / Model Country of Origin Description of Function Required for distilled water production for lab. Operational Requirements Double distillation plant with stand not wall mounted and approx. 5 – 10 litres/ hour output. Instant distilled water flow must be there. Easy to operate, durable, safe for routine use. System Configuration Distillation Plant, complete unit. Technical Specifications Quartz distiller, demountable boiler Panel box and stand to accommodate regulator and electrical supply, clamps etc. Quality of distillate – pyrogen free, pH- 6.9- 7.0.high purity, low conductivity. Distilled water must be heavy metal, salts, pyrogon and iron free. Specific conductivity at 25 0C less than 0.4 x 10 S/cm Glass material (or chemical inert material). Equipment must be thermal shock proof. Gas vent must be there to remove volatile impurities leaving the condensate free from gaseous impurities. Automatic low water cut off. Tubing must be made up of good quality rubber (heat resistant). Wiring of the equipment must be enclosed in case. It must have deconcentrator a bleeder device on the evaporation that constantly removes a part of the boiling water from it so that the cumulative concentration of non-volatile impurities in the water is prevented. Accessories, spares and consumables All standard accessories, consumables and parts required to operate the equipment, including all standard tools and cleaning and lubrication materials, to be included in the offer. Bidders must specify the quantity of every item included in their offer (including items not specified above). Operating Environment The system offered shall be designed to operate normally under the conditions of the purchaser's country. The conditions include Power Supply, Climate, Temperature, Humidity, etc. Power supply: 220 – 240 VAC, 50Hz fitted with appropriate plug. The power cable must be at least 3 metre in length. Shall be supplied voltage corrector/stabilizer of appropriate ratings meeting international standards.( Input 160-260 V and output 220-240 V and 50 Hz) Standards and Safety Requirements Must submit ISO 9001/ISO13485:2003/AC:2007 AND CE or USFDA approved product certificate. User Training Must provide user training (including how to use and maintain the equipment). Warranty Comprehensive warranty for 2 years from acceptance. Maintenance Service During Warranty Period During the warranty period supplier must ensure corrective/breakdown maintenance whenever required. S.N. 11 11.1 12 12.1 12.2 12.3 12.4 Purchaser’s Specifications Installation and Commissioning The bidder must arrange for the equipment to be installed and commissioned by certified or qualified personnel; any prerequisites for installation to be communicated to the purchaser in advance, in detail. Documentation User (Operating) manual in English Service (Technical / Maintenance) manual in English List of important spare parts and accessories with their part number and costing. Certificate of calibration and inspection from factory.