The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Grid Construction
(20110808-20110812)
Project Name: Changchun, the park opened a new 66kV power transmission project ........... 2
Project Name: Hongshan 110kV substation expansion project............................................. 3
Project Name: Longyang 110kV power transmission project Error! Bookmark not defined.
Project Name: Boquan supporting substation 220kV line project ......... Error! Bookmark not
defined.
Project Name: Shizui 110kV substation expansion project .... Error! Bookmark not defined.
Project Name: happy 110kV power transmission project ...... Error! Bookmark not defined.
Project Name: Dongfeng Village 110kV power transmission project ..... Error! Bookmark not
defined.
Project Name: 500kV substation expansion project Hezhou -updated .................................. 8
Project Name: Ningxia Meijie Paper 35KV power transmission project ................................. 9
Project Name: Beijing Zhongmen Temple 110KV substation project .... Error! Bookmark not
defined.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
[email protected], [email protected]
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Changchun, the park opened a new 66kV power transmission project
Stages of progress: the record approved
Construction period: 2011 2012
Major equipment: transformers, reactors, capacitors, circuit breakers, towers, tower, insulators, reactive
power compensation equipment, high voltage inverter, wire and cable, switchgear, power supply, power
distribution fault indicator integrated monitor live indicator, cable Bridge shelf, harmonic control, PRTV
insulation coating, flow meters, transmitters, etc. -reference
Project:
Project is located in Changchun, Jilin Province, the new park opened in Changchun 66kV power
transmission project planning 2 new 40MVA transformer, the current installation 2. Park opened in
Changchun 66kV substation T connected to the 66kV line Jia Yue North North Ha line power difference,
choose double-wire LGJ-240/30; line length 0.1km; while transforming the differences Jia 1 ~ 13 line
segments, After the erection of extension wire model 2 × LGJ-240/30, interactive extension line is about
1.5km. The park opened the program to meet the new 66kV substation power requirements, use the
reserved transmission capacity of the existing line for the nearest substation to provide power. And the new
line length is short, the path right and wrong. The substation will be replaced by long-term co-Long 220kV
substation power supply, which will help adjust the grid to ease the pressure on northern suburb of 220kV
power substation.
The total investment is about 38 million.
Construction Unit:*******
Postal Address:*******
Tel 0431 -7873813
Fax 0431 -7877718
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
[email protected], [email protected]
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project Name: Hongshan 110kV substation expansion project
Stages of progress: environmental impact assessment
Construction period: 2011 2012
Major equipment: transformers, reactors, capacitors, circuit breakers, insulators, reactive power
compensation equipment, high voltage inverter, wire and cable, switchgear, power supply, power
distribution fault indicator integrated monitor live indicator, cable bridge shelf, harmonic wave treatment,
PRTV insulation coating, flow meters, transmitters. -Reference
Project:
Project is located in Wuhan Hongshan District, Hongshan 110kV current expansion of 1 × 50MVA
substation main transformer, the current expansion westward expansion of venues will be 22.5m, a new
land 1764m, purple sun substation south qualifying interval flood and flood drying line qualifying interval
swap , the new cable lines 0.12km.
The total investment is unknown.
Construction unit:*******
Postal Address:*******
Tel :*******
Fax :*******
Design:*******
Postal address:*******
Post Code:*******
Contact :027 -67,818,236
Tel :*******
Stages of progress: environmental impact assessment
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
[email protected], [email protected]
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Construction period: 2011 2012
Major equipment: transformers, reactors, capacitors, circuit breakers, insulators, reactive power
compensation equipment, high voltage inverter, wire and cable, switchgear, power supply, power
distribution fault indicator integrated monitor live indicator, cable bridge shelf, harmonic wave treatment,
PRTV insulation coating, flow meters, transmitters. -Reference
Project:
Project is located in Wuhan Hanyang District, -1 New Longyang 110kV substation: construction of 2 ×
50MVA main current transformers, each transformer 10kV side configuration 2 × 6MVar shunt capacitor,
110kV outlet 2 back. -2 new 110kV π pot back into the British Ⅰ Longyang substation cable lines: current
new cable lines long 2 × 0.5km, double back to the cable laying method.
The total investment is unknown.
Construction unit:*******
Postal Address:*******
Tel :*******
Fax :*******
Design:*******
Postal address:*******
Post Code:*******
Contact :027 -67,818,236
Tel :*******
Stages of progress: environmental impact assessment
Construction period: 2011 2012
Major equipment: transformers, reactors, capacitors, circuit breakers, insulators, reactive power
compensation equipment, high voltage inverter, wire and cable, switchgear, power supply, power
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
[email protected], [email protected]
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
distribution fault indicator integrated monitor live indicator, cable bridge shelf, harmonic wave treatment,
PRTV insulation coating, flow meters, transmitters. -Reference
Project:
Project is located in Wuhan East Lake -1 Boquan substation - Pioneer substation transmission line
project: new overhead lines 19.4km. Buck 220kV 500kV lines which run 19km, double-line with the tower
set up; 220kV line 0.4km, double-line with the tower set up. -2 Boquan - Taiwan I, II, III back to the
220kV line project: Current New transmission lines 18.2km, including single-circuit lines 0.3km, with
double-circuit tower 1.4km, with the tower four back line 14km, double- cable lines 2.5km. -3 Boquan Tuoluokou I, II back Boquan - Lijiadun I, II back Boquan - Jinghe I, II back, pot top mountain - Lijiadun
divert Tuoluokou substation 220kV line engineering: Current New Line
30.7km, one with double-circuit tower 8.4km, with the tower four back line 22.3km. -4 supporting interval
projects: Taiwan 220kV substation expansion of two qualifying interval period, Duoluokou 220kV
substation expansion of a qualifying interval period, Boquan 500kV substation expansion of four qualifying
interval period.
The total investment is unknown.
Construction unit:*******
Postal Address:*******
Tel :*******
Fax :*******
Design:*******
Postal address:*******
Post Code:*******
Contact :027 -67,818,236
Tel :*******
Stages of progress: environmental impact assessment
Construction period: 2011 2012
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
[email protected], [email protected]
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Major equipment: transformers, reactors, capacitors, circuit breakers, insulators, reactive power
compensation equipment, high voltage inverter, wire and cable, switchgear, power supply, power
distribution fault indicator integrated monitor live indicator, cable bridge shelf, harmonic wave treatment,
PRTV insulation coating, flow meters, transmitters. -Reference
Project:
Project is located in Wuhan Hongshan District, -1 Shizui transformer 110kV substation expansion
project: expansion of 1 × 31.5MVA main current transformers. -2 new patrol Shizui 110kV substation T
then Cao line project: the line length of 7.9km, of which two new single-back qualifying 0.4km, new
double-circuit overhead line 2 × 2.3km -waterline of the pump with the South stone tower the use of
Qingling Industrial Park Qiangai four back line with the tower -including 2 back to 220kV, 2 back to 110
kV 5.2km.
The total investment is unknown.
Construction unit:*******
Postal Address:*******
Tel :*******
Fax :*******
Design:*******
Postal address:*******
Post Code:*******
Contact :027 -67,818,236
Tel :*******
Stages of progress: environmental impact assessment
Construction period: 2011 2012
Major equipment: transformers, reactors, capacitors, circuit breakers, insulators, reactive power
compensation equipment, high voltage inverter, wire and cable, switchgear, power supply, power
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
[email protected], [email protected]
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
distribution fault indicator integrated monitor live indicator, cable bridge shelf, harmonic wave treatment,
PRTV insulation coating, flow meters, transmitters. -Reference
Project:
Project is located in Wuhan Hannan, -1 happy new 110kV substation: the main issue of building 2 ×
50MVA transformer, 110kV outlet 2 back, 2 × -3000 +5000 kvar capacitor. -2 supporting the 110kV line
project: happy new substation to substation 110kV line 2-way Jiashan back, the line length 3.9km, twoback set with the tower. -3 supporting interval Project: 220kV substation expansion of two-way Mountain
110kV qualifying interval.
The total investment is unknown.
Construction unit:*******
Postal Address:*******
Tel :*******
Fax :*******
Design:*******
Postal address:*******
Post Code:*******
Contact :027 -67,818,236
Tel :*******
Stages of progress: environmental impact assessment
Construction period: 2011 2012
Major equipment: transformers, reactors, capacitors, circuit breakers, insulators, reactive power
compensation equipment, high voltage inverter, wire and cable, switchgear, power supply, power
distribution fault indicator integrated monitor live indicator, cable bridge shelf, harmonic wave treatment,
PRTV insulation coating, flow meters, transmitters. -Reference
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
[email protected], [email protected]
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project is located in Hankou District, Wuhan Qiaokou the western region, -1 new 110kV substation east
village: the main issue of building 2 × 50MVA transformer, 110kV outlet 2 back, 2 × -3000 +5000 kvar
reactive power compensation devices. -2 new 110kV line rudder back to the wind Ⅰ: 110kV rudder in the
water-Ci yellow line T junction will Tuoluokou east side branch off access to the village after the
substation, the new double-circuit overhead line current 0.33km, a single cable line back to 0.6 km. -3 new
110kV line rudder back to the wind II: New Tuoluokou Substation to the east village substation lines, line
length of 3.46km, double-issue of the new tower with overhead lines 2.3km -Lee pot line with a total of
220kV tower, single back to the overhead lines 0.35km, single circuit cable lines 0.81km.
The total investment is unknown.
Construction unit:*******
Postal Address:*******
Tel :*******
Fax :*******
Design:*******
Postal address:*******
Post Code:*******
Contact :027 -67,818,236
Tel :*******
Project Name: 500kV substation expansion project Hezhou -updated
Stages of progress: survey design
Construction period: 2011 2012
Major equipment: transformers, reactors, capacitors, circuit breakers, insulators, reactive power
compensation equipment, high voltage inverter, wire and cable, switchgear, power supply, power
distribution fault indicator integrated monitor live indicator, cable bridge shelf, harmonic wave treatment,
PRTV insulation coating, flow meters, transmitters. -Reference
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
[email protected], [email protected]
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Project:
Project is located in Hezhou, the current changes in the expansion of 500kV China Resources Power
Hezhou interval 2, respectively, arranged in the fourth and fifth string string, the current construction side
of circuit breaker, the formation of two incomplete string. New 500kV third period to protect a small room,
arranged in the fourth, fifth string between. While building the corresponding system communication,
protection, SCADA, metering and so on.
The total investment not yet known, its own funds and bank loans.
Construction:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Design:*******
Postal Address:*******
Chief Engineer: Qi Bin
Tel :*******
Fax :*******
Project Name: Ningxia Meijie Paper 35KV power transmission project
Progress stage: construction preparation
Construction period: 2011 2012
Major equipment: transformers, reactors, capacitors, circuit breakers, towers, tower, insulators, reactive
power compensation equipment, high voltage inverter, wire and cable, switchgear, power supply, power
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
[email protected], [email protected]
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
distribution fault indicator integrated monitor live indicator, cable Bridge shelf, harmonic control, PRTV
insulation coating, flow meters, transmitters, etc. -reference
Project:
Project is located in Yinchuan Helan county, construction 35KV power transmission line project, 35KV
high voltage substation projects.
The total investment, corporate self-financing, bank loans.
Construction units:*******
Postal Address:*******
Contact:*******
Tel:*******
Progress stage: construction preparation
Construction period: 2011 2012
Major equipment: transformers, reactors, capacitors, circuit breakers, insulators, reactive power
compensation equipment, high voltage inverter, wire and cable, switchgear, power supply, power
distribution fault indicator integrated monitor live indicator, cable bridge shelf, harmonic wave treatment,
PRTV insulation coating, flow meters, transmitters. -Reference
Project:
Project is located in Longquan town Mentougou, building area 2435m2, building height of 11.4m.
The total investment 88.14 million yuan.
Construction:*******
Postal Address:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
[email protected], [email protected]
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government. If you are interested in the E-journal with contact, please Contact us.
Fax :*******
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
[email protected], [email protected]
http://www.chinabidding.com.cn www.chinabidding.org
Related documents