Download COUNTY OF FAIRFAX, VIRGINIA DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts
no text concepts found
Transcript
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
GENERAL CONDITIONS
Field Offices and Temp Facilities
General Supervision
Job Sign
Mobilization
See Note below*
NOTE:
As a % of total for Surety Value Estimate (SVE):
* Minimum of $12,600.00 for estimates up to $252K (Item 8 on SVE Form) plus 5% of amount over $252K
(Item will automatically calculate under Section 9 on SVE Spreadsheet)
CLEAR & GRUB
Heavy
Light
Moderate
Very Heavy
$
$
$
$
LIGHT: Grading less than 2 feet in depth. Remove vegetation, grass areas and small shrubs, small trees
less than 12 inches in diameter, small out buildings less than 200 square feet, remove small utilities,
e.g., water feeder lines, sanitary laterals, small gas and electrical feeds.
MODERATE: In addition to all under the Light category, grading of 2 feet to 4 feet depth, remove trees
12 inches to 24 inches in diameter, remove large shrubs up 48 inches in diameter.
Remove all utility feeds, sanitary sewer pipe up to 8 inches, water lines up to 6 inches, storm
sewer up to 15 inches, and gravel drive ways. Remove fencing and clear light industrial areas with small
light poles.
HEAVY: In addition to all included in Light and Moderate categories: Remove trees 24 inches to 36 inches,
grading not exceeding 5 feet in depth. Remove heavy brush and undergrowth in wooded areas. Remove
sanitary sewer larger than larger than 8 inches, and storm sewer from 15 inches to 27 inches. Remove
utility poles, underground utility lines, and boxes/vaults of same. Remove water service lines up to 8 inches.
VERY HEAVY: In addition to the first three category descriptions: Grading exceeding 5 feet of cut.
Clear/remove heavily wooded areas with trees exceeding 36 inches diameter. Remove parking lot asphalt
parking lot asphalt and curb and gutter. Remove pools and inground spas and all associated footings
and foundations. Remove large fencing built with iron/steel pickets, razor wire, brick or concrete
piers/foundations greater than 36 inches in diameter/on a side. Remove sanitary sewer pipes
larger than 24 inches and septic systems/fields. Remove storm sewer pipe larger than 27 inches,
remove large underground detention structures/vaults. Remove large/main water lines greater
than 8 inches. Remove underground storage tanks.
Page 1 of 44
14,418.53
7,522.72
11,284.07
16,299.21
AC
AC
AC
AC
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
DEMOLITION
Abandon pipes
$
188.07
EA
Bituminous Pavement
Up to 4" and dispose
$
7.52
SY
$
$
$
0.83
0.69
31.35
CF
CF
CY
$
$
12.54
15.05
SY
SY
$
$
$
$
37.61
161.74
15.05
450.11
LF
EA
LF
EA
$
$
43.89
56.43
LF
LF
$
$
$
94,033.92
31,344.64
62,689.29
EA
EA
EA
$
$
$
1,082.02
144.19
288.37
LF
LF
LF
$
$
$
$
25.08
21.94
34.48
31.35
CY
CY
CY
CY
Rock, Blast
Rock, Rip
Rock, Hoe ram
Used as fill on site regular bulk less than 5000 CY
Used as fill on site regular bulk greater than 5000 CY
$
$
$
$
$
75.23
31.35
75.23
31.35
25.08
CY
CY
CY
CY
CY
Site Grading - After cut/fill - rough grading
Site Grading - Fine grading - dressed slopes
Site Grading - Fine grading - relatively flat
Unsuitable Material
Dump Charge-unsuitable material
Load and haul, 20 mile round trip average
$
$
$
0.83
0.96
0.62
SY
SY
SY
$
$
43.89
25.08
CY
CY
Building Demo includes demolition, load, haul and dump fee
Building, Small, Masonry
Building, Small, Wood
Haul, Rubbish, 10 mi. R/T
Concrete Pavement and Sidewalk WWF Reinforced and Disposal
Non-reinforced
WWF reinforced
Guardrail:
Remove and reset
Remove traffic barricade
Reset
Manholes/structures (Sanitary & Storm)
Pipe
6" - 12"
15" - 24"
Relocate exist utility pole with wires - urban setting: (See NOTE: below)
Multiple circuits, with devices
One Phase, with secondary
Three Phase, with secondary
NOTE: A written quote from the appropriate utility company defining/detailing the full scope of work to
accomplish relocation work may be submitted for review in lieu of these assigned prices.
Relocate underground power
Encased duct bank, includes cable
Single phase, includes trenching
Three phase, includes trenching
EARTHWORK
Borrow Material
Borrow (Buy/Load) non-structural fill less than 5000 CY
Borrow (Buy/Load) non-structural fill greater than 5000 CY
Borrow (Buy/Load) select structural fill less than 5000 CY
Borrow (Buy/Load) select structural fill great than 5000 CY
Excavation
Grading
Page 2 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
ENGINEERING AND SURVEY
As-Built Drawing
Plan Processing As-Built Drawing
Survey As-Built (minimum)
Dry Pond
Wet Pond
Geotech Testing:
Geotech Professional Engineer certification
Soils/concrete/rebar inspector
R.O.W. Monuments Surveyed In Place
RM-1
RM-2
Steel Pipe Property Corner Marker (includes survey)
Storm and Sanitary As-Built
Test Pits (not allowing for rock excavation):
Each location 10' deep but not exceeding 15' deep
Each location not exceeding 10' deep
Video inspection:
Storm sewer
Utility pipes
LANDSCAPING
Shrubs
12" 2 gallon
18" 3 gallon
24" 5 gallon
Trees
Deciduous
1.0 to 1.5" caliper
1.5 to 2.0" caliper
2.0 to 2.5" caliper
2.5 to 3.0 caliper
3.0 to 3.5 caliper
Evergreen
5 to 6' in height
6 to 8' in height
8 to 10' in height
10 to 12' in height
Tree Well
Tree Well, Stone (D=10', H=3')
MISCELLANEOUS SITE IMPROVEMENTS
Ball Fields
Backstop (PA-10)
Baseball infield (PA-6)
Bleacher pad (PA-9)
Little League infield (PA-5)
Outfield fence (PA-13)
6'H with 10 foot warning track
Player area: 6'H (PA-12)
8'H with 10 foot warning track
Sideline fence (PA-13)
4'H with 10 foot warning track
6'H with 10 foot warning track
Softball infield (PA-7)
Page 3 of 44
UNIT
$
$
$
$
788
4,795
1,504.55
2,194.13
LS
LS
AC
AC
$
$
100.30
31.35
HR
HR
$
$
$
$
940.34
626.89
313.45
3.13
EA
EA
EA
LF
$
$
1,880.68
940.34
EA
EA
$
$
8.28
8.27
LF
LF
$
$
$
47.64
60.18
81.50
EA
EA
EA
$
$
$
$
$
300.91
426.29
564.20
852.57
1,128.40
EA
EA
EA
EA
EA
$
$
$
$
263.29
476.44
840.03
1,128.40
EA
EA
EA
EA
$
4,388.25
EA
$
$
$
$
9,403.40
17,553.00
16,573.80
6,268.92
EA
EA
EA
EA
$
$
$
47.64
5,802.52
50.15
LF
EA
LF
$
$
$
37.61
46.40
12,537.86
LF
LF
EA
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
Bike Racks
Bike racks(4 bikes)
$
313.45
EA
Bus shelter
$
25,075.71
EA
Multi-Use Court & Equipment, PA 25 and 26
Tennis Courts (2), PA-15 Thru 18
Tennis Practice Court and Wall, PA-19 to 23
$
$
$
31,344.64
56,420.35
25,075.71
EA
EA
EA
Board fence (H=6')
Chain-link fence (H=6') FR-2B
Farm fence (H=5') FR-3A
Remove and reset existing chain link fence
Snow fence
Standard fence (H=5') FR-5
$
$
$
$
$
$
50.15
50.15
31.35
12.54
6.27
25.08
LF
LF
LF
LF
LF
LF
$
752.27
EA
Picnic Table, (PA-2)
$
714.65
EA
Retaining Walls
Concrete gravity RW-2 (H < 6 FT.)
Concrete gravity RW-3 (H < 6 FT.)
Dry rubble RW-1 (H< 6 FT.)
Mortared rubble RW-1A (H < 6 FT.)
$
$
$
$
401.21
451.36
526.59
651.97
LF
LF
LF
LF
Soccer Field (includes grading)
Seeded field
Sodded field
$
$
43,882.49
188,067.86
EA
EA
Swimming Pool
Community
School (Olympic)
$
$
75.23
106.58
SF
SF
Tot Lot Equipment, PA 3-4
Revolving device300/150
Sliding device550/150
Stationary device300/100
Swinging device450/200
Tot Lot - Mulch Surface
Tot Lot - Synthetic Surface
$
$
$
$
$
$
6,895.83
6,268.92
7,522.72
6,268.92
10.03
20.06
EA
EA
EA
EA
SF
SF
Trash Enclosures/Receptacles
Trash enclosures-brick/CMU 6' high
Trash receptacles-Victor Stanley Model S-45
Trash enclosures-wood 6' high
$
$
$
376.13
1,253.78
37.61
LF
EA
LF
Trash Pads
Trash pads 6" thick concrete
$
12.54
SF
Bus Shelters
Courts
Fencing
Metal Bollards
Painted metal bollards with concrete base
Recreational
Page 4 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
ROCK EXCAVATION IN TRENCHES, DE-WATERING, and SELECT BACKFILL
- THESE PRICES ARE UNIFORM FOR ALL PIPE TYPES STORM SEWER, SANITARY SEWER, AND WATER SERVICE
STORM SEWER
ARCH PIPE - CMP
PLAIN, 12 GA
6'-9" x 4'-11" Pipe Arch (72" Equivalent)
0'-14' Cut
14'-20' Cut
7'-11" x 5'-7" Pipe Arch (84" Equivalent)
0'-14' Cut
14'-20' Cut
9'-4" x 6'-3" Pipe Arch (96" Equivalent)
0'-14' Cut
14'-20' Cut
10'-8" x 6'-11" Pipe Arch (108" Equivalent)
0'-14' Cut
14'-20' Cut
11'-10" x 7'-7" Pipe Arch (120" Equivalent)
0'-14' Cut
14'-20' Cut
42" x 29" Pipe Arch (36" Equivalent)
0'-12' Cut
0'-12' Cut; Coated, Paved Invert
12'-18' Cut
12'-18' Cut; Coated, Paved Invert
49" x 33" Pipe Arch (42" Equivalent)
0'-12' Cut
0'-12' Cut; Coated, Paved Invert
12'-18' Cut
12'-18' Cut; Coated, Paved Invert
57" x 38" Pipe Arch (48" Equivalent)
0'-12' Cut
0'-12' Cut; Coated, Paved Invert
12'-18' Cut
12'-18' Cut; Coated, Paved Invert
64" x 43" Pipe Arch (54" Equivalent)
0'-12' Cut
0'-12' Cut; Coated, Paved Invert
12'-18' Cut
12'-18' Cut; Coated Paved Invert
71" x 47" Pipe Arch (60" Equivalent)
0'-12' Cut
0'-12' Cut; Coated, Paved Invert
12'-18' Cut
12'-18' Cut; Coated Paved Invert
Page 5 of 44
$
$
283.35
378.64
LF
LF
$
$
317.21
421.27
LF
LF
$
$
358.58
476.44
LF
LF
$
$
416.26
552.92
LF
LF
$
$
445.10
591.78
LF
LF
$
$
$
$
115.35
130.39
164.25
179.30
LF
LF
LF
LF
$
$
$
$
131.65
149.20
181.80
199.35
LF
LF
LF
LF
$
$
$
$
144.19
163.18
198.10
217.10
LF
LF
LF
LF
$
$
$
$
161.74
184.32
241.99
264.56
LF
LF
LF
LF
$
$
$
$
195.59
220.66
293.38
318.46
LF
LF
LF
LF
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
PLAIN, 14 GA
24" x 18" Pipe Arch (21" Equivalent)
0'-10' Cut
0'-10' Cut; Coated, Paved Invert
10'-16' Cut
10'-16' Cut, Coated, Paved Invert
28" x 20" Pipe Arch (24" Equivalent)
0'-10' Cut
0'-10' Cut; Coated, Paved Invert
10'-16' Cut
10'-16' Cut, Coated, Paved Invert
35" x 24" Pipe Arch (30" Equivalent)
0'-10' Cut
0'-10' Cut; Coated, Paved Invert
10'-16' Cut
10'-16' Cut, Coated, Paved Invert
PLAIN, 16 GA
17" x 13" Pipe Arch (15" Equivalent)
0'-10' Cut
0'-10' Cut; Coated, Paved Invert
10'-16' Cut
10'-16' Cut, Coated, Paved Invert
21" x 15" Pipe Arch (18" Equivalent)
0'-10' Cut
0-10' Cut; Coated, Paved Invert
10'-16' Cut
10-16' Cut; Coated, Paved Invert
$
$
$
$
58.93
67.71
95.29
104.07
LF
LF
LF
LF
$
$
$
$
71.47
80.87
109.08
118.49
LF
LF
LF
LF
$
$
$
$
84.01
95.61
99.05
110.65
LF
LF
LF
LF
$
$
$
$
51.41
58.01
92.78
99.06
LF
LF
LF
LF
$
$
$
$
56.43
63.95
95.29
102.81
LF
LF
LF
LF
$
26.26
LF
$
$
$
$
$
657.48
821.86
989.11
1,312.09
1,643.71
LF
LF
LF
LF
LF
CULVERTS
Box Culverts on Piles (BC-P)
Timber Piles - Treated (No mobilization)
Double Box Culvert
(BC-2B) Fills to 25'
Size
4' x 4'
5' x 5'
6' x 6'
8' x 8'
10' x10'
Page 6 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
Gravity Wing for Box Culvert (1 Side Only)
Height of Box
4'
5'
6'
8'
10'
Oversized Single Box Culvert
(BBC-1) Fills to 25'
Size
12' x 6'
12' x 8'
12' x 10'
12' x 12'
Quadruple Box Culvert
(BC-4B) Fills to 25'
Size
4' x 4'
5' x 5'
6' x 6'
8' x 8'
10' x 10'
Single Box Culvert
(BC-1A) Fills to 25'
Size
4' x 4'
5' x 5'
6' x 6'
8 'x 8'
10' x10'
Standard Wing for Box Culvert (1 Side Only)
Height of Box
4'
5'
6'
8'
10'
Standard Wing for Oversized Box Culvert (BBC-W)
Height of Box
6'
8'
10'
12'
Triple Box Culvert
(BC-3B) Fills to 25'
Size
4' x 4'
5' x 5'
6' x 6'
8' x 8'
10' x10'
Page 7 of 44
UNIT
$
$
$
$
$
996.32
1,529.80
2,037.34
3,467.66
4,137.50
EA
EA
EA
EA
EA
$
$
$
$
1,203.95
1,329.39
1,456.27
1,583.16
LF
LF
LF
LF
$
$
$
$
$
1,157.81
1,436.08
1,799.43
1,763.38
3,350.87
LF
LF
LF
LF
LF
$
$
$
$
$
393.63
488.79
586.84
816.09
994.88
LF
LF
LF
LF
LF
$
$
$
$
$
795.91
1,188.08
1,583.16
2,941.38
3,923.29
EA
EA
EA
EA
EA
$
$
$
$
1,568.73
2,588.13
3,861.28
5,639.08
EA
EA
EA
EA
$
$
$
$
$
904.04
1,128.97
1,413.02
1,930.64
2,932.73
LF
LF
LF
LF
LF
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
CURB DROP INLETS - PRECAST
Curb Drop Inlet (DI-3A)
12"-30" Pipe
(Invert depth (H)=0'-8')
Inlet length 2'-6"
Curb Drop Inlet (DI-3AA)
12"-30" Pipe
(Invert depth (H)=8'-20')
Inlet length 2'-6"
Curb Drop Inlet (DI-3B & DI-12)
12"-30" Pipe
(Invert depth (H)=0'-8')
Inlet length
4'
6'
8'
10'
12'
16'
20'
Curb Drop Inlet (DI-3BB)
12"-30" Pipe
(Invert depth (H)=8'-20')
Inlet length
4'
6'
8'
10
12'
16'
20'
Curb Drop Inlet (DI-3C)
12"-30" Pipe
(Invert depth (H)=0'-8')
Inlet length
6'
8'
10
12'
16'
20'
Curb Drop Inlet (DI-3CC)
12"-30" Pipe
(Invert depth (H)=8'-20')
Inlet length
6'
8'
10
12'
16'
20'
Page 8 of 44
$
4,781.57
EA
$
6,258.64
EA
$
$
$
$
$
$
$
5,038.09
5,380.12
5,759.39
5,951.09
6,142.80
6,517.93
6,897.20
EA
EA
EA
EA
EA
EA
EA
$
$
$
$
$
$
$
5,007.75
5,698.71
6,389.67
6,735.15
7,080.63
7,433.69
7,786.76
EA
EA
EA
EA
EA
EA
EA
$
$
$
$
$
$
4,712.60
5,403.57
5,749.04
6,094.53
6,785.49
7,476.45
EA
EA
EA
EA
EA
EA
$
$
$
$
$
$
5,582.85
6,232.45
6,641.37
7,050.28
7,989.50
8,792.18
EA
EA
EA
EA
EA
EA
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
Curb Drop Inlet (DI-3D)
12"-30" Pipe
(Invert depth (H)=0'-8')
Inlet length
2'-6"
Curb Drop Inlet (DI-3DD)
12"-30" Pipe
(Invert depth (H)=8'-20')
Inlet length
2'-6"
Curb Drop Inlet (DI-3E)
12"-30" Pipe
(Invert depth (H)=0'-8')
Inlet length
4'
8'
10
12'
16'
20'
Curb Drop Inlet (DI-3EE)
12"-30" Pipe
(Invert depth (H)=8'-20')
Inlet length
6'
8'
10'
12'
16'
20'
Curb Drop Inlet (DI-3F)
12"-30" Pipe
(Invert depth (H)=0'-8')
Inlet length
6'
8'
10
12'
16'
20'
Curb Drop Inlet (DI-3FF)
12"-30" Pipe
(Invert depth (H)=8'-20')
Inlet length
6'
8'
10'
12'
16'
20'
Page 9 of 44
UNIT
$
4,258.86
EA
$
5,110.64
EA
$
$
$
$
$
$
4,820.18
5,591.13
6,755.14
6,368.98
7,141.32
7,920.54
EA
EA
EA
EA
EA
EA
$
$
$
$
$
$
8,908.02
9,276.26
9,456.93
9,637.60
9,998.94
10,357.52
EA
EA
EA
EA
EA
EA
$
$
$
$
$
$
4,431.26
5,200.83
5,591.13
5,981.44
6,751.01
7,531.61
EA
EA
EA
EA
EA
EA
$
$
$
$
$
$
9,530.02
9,776.90
10,005.14
10,233.40
10,673.35
11,147.79
EA
EA
EA
EA
EA
EA
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
Curb Drop Inlet (DI-4A)
36"-48" Pipe
(Invert depth (H)=0'-8')
Inlet length
4'
Curb Drop Inlet (DI-4AA)
36"-48" Pipe
(Invert depth (H)=8'-20')
Inlet length
4'
Curb Drop Inlet (DI-4B)
36"-48" Pipe
(Invert depth (H)=0'-8')
Inlet length
6'
8'
10'
12'
16'
20'
Curb Drop Inlet (DI-4BB)
36"-48" Pipe
(Invert depth (H)=8'-20')
Inlet length
6'
8'
10'
12'
16'
20'
Curb Drop Inlet (DI-4C)
36"-48" Pipe
(Invert depth (H)=0'-8')
Inlet length
8'
10'
12'
16'
20'
Curb Drop Inlet (DI-4CC)
36"-48" Pipe
(Invert depth (H)=8'-20')
Inlet length
8'
10'
12'
16'
20'
Page 10 of 44
UNIT
$
5,709.74
EA
$
8,033.63
EA
$
$
$
$
$
$
6,080.73
6,491.72
6,697.91
6,904.10
7,316.46
7,730.22
EA
EA
EA
EA
EA
EA
$
$
$
$
$
$
12,153.19
12,558.67
12,760.02
12,961.39
13,368.24
13,772.33
EA
EA
EA
EA
EA
EA
$
$
$
$
$
6,610.34
6,817.33
7,024.09
7,433.69
7,847.44
EA
EA
EA
EA
EA
$
$
$
$
$
15,805.22
16,198.98
16,592.72
17,377.48
18,167.73
EA
EA
EA
EA
EA
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
Curb Drop Inlet (DI-4D)
36"-48" Pipe
(Invert depth (H)=0'-8')
Inlet length
4'
Curb Drop Inlet (DI-4DD)
36"-48" Pipe
(Invert depth (H)=8'-16')
Inlet length
4'
Curb Drop Inlet (DI-4E)
36"-48" Pipe
(Invert depth (H)=0'-8')
Inlet length
6'
8'
10'
12'
16'
20'
Curb Drop Inlet (DI-4EE)
36"-48" Pipe
(Invert depth (H)=8'-16')
Inlet length
6'
8'
10'
12'
16'
20'
Curb Drop Inlet (DI-4F)
36"-48" Pipe
(Invert depth (H)=0'-8')
Inlet length
8'
10'
12'
16'
20'
Curb Drop Inlet (DI-4FF)
36"-48" Pipe
(Invert depth (H)=8'-16')
Inlet length
8'
10'
12'
16'
20'
Page 11 of 44
UNIT
$
5,780.07
EA
$
11,145.03
EA
$
$
$
$
$
$
6,192.45
6,603.44
6,976.50
7,349.57
8,254.30
9,077.66
EA
EA
EA
EA
EA
EA
$
$
$
$
$
$
10,831.96
11,225.02
11,618.77
12,012.52
12,784.85
13,586.15
EA
EA
EA
EA
EA
EA
$
$
$
$
$
6,924.78
7,337.16
7,749.52
8,574.27
9,397.62
EA
EA
EA
EA
EA
$
$
$
$
$
10,467.85
10,807.13
11,146.40
11,826.34
12,504.89
EA
EA
EA
EA
EA
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
DROP INLETS
Cast in Place - 48"
Drop Inlet (DI-1) 12"-24" Pipe
0-10 Vertical feet (VF)
Drop Inlet (DI-1A) 12"-24" Pipe
10-20 VF
Drop Inlet (DI-2) 12"-24" Pipe
0-10 VF, 10' throat
Drop Inlet (DI-2A) 12"-24" Pipe
10-20 VF, 10' throat
Precast - 48"
Drop Inlet (DI-1APC) 12"-24" Pipe
10-20 VF
Drop Inlet (DI-1PC) 12"-24" Pipe
0-10 VF
Drop Inlet (DI-2APC) 12"-24" Pipe
10-20 VF, 10' throat
Drop Inlet (DI-2PC) 12"-24" Pipe
0-10 VF, 10' throat
ELLIPTICAL PIPE - CMP
$
4,356.90
EA
$
6,577.35
EA
$
8,133.31
EA
$
10,396.39
EA
$
7,065.08
EA
$
4,356.90
EA
$
9,962.58
EA
$
7,797.29
EA
$
$
$
$
95.29
109.09
142.93
156.73
LF
LF
LF
LF
$
$
$
$
121.62
137.60
183.05
199.04
LF
LF
LF
LF
$
$
$
$
135.41
153.46
203.11
221.16
LF
LF
LF
LF
$
$
$
$
70.21
79.12
107.83
116.73
LF
LF
LF
LF
$
$
$
$
81.50
92.79
122.87
134.16
LF
LF
LF
LF
$
$
$
$
51.41
57.99
86.52
93.10
LF
LF
LF
LF
PLAIN, 12 GA
45" X 29" Elliptical Pipe (36" equivalent)
0'-10' Cut
0'-10' Cut; Coated, Paved Invert
10'-16' Cut
10'-16' Cut; Coated, Paved Invert
53" X 34" Elliptical Pipe (42" equivalent)
0'-12' Cut
0'-12' Cut; Coated, Paved Invert
10'-18' Cut
10'-18' Cut; Coated, Paved Invert
60" X 38" Elliptical Pipe (48" equivalent)
0'-12' Cut
0'-12' Cut; Coated, Paved Invert
10'-18' Cut
10'-18' Cut; Coated, Paved Invert
PLAIN, 14 GA
30" X 19" Elliptical Pipe (24" equivalent)
0'-10' Cut
0'-10' Cut; Coated, Paved Invert
10'-16' Cut
10'-16' Cut; Coated, Paved Invert
38" X 24" Elliptical Pipe (30" equivalent)
0'-10' Cut
0'-10' Cut; Coated, Paved Invert
10'-16' Cut
10'-16' Cut; Coated, Paved Invert
PLAIN, 16 GA
23" X 14" Elliptical Pipe (18" equivalent)
0'-10' Cut
0'-10' Cut; Coated, Paved Invert
10'-16' Cut
10'-16' Cut; Coated, Paved Invert
Page 12 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
ELLIPTICAL PIPE - RCP CLASS III
23" X 14" Elliptical Pipe (18" Equivalent)
0'-10' Cut
0'-10' Cut; "O" Ring Upgrade
0'-10' Cut; Class HE/IV Upgrade
10'-16' Cut
10'-16' Cut; "O" Ring Upgrade
10'-16' Cut; Class HE/IV Upgrade
30" X 19" Elliptical Pipe (24" equivalent)
0'-10' Cut
0'-10' Cut; "O" Ring Upgrade
0'-10' Cut; Class HE/IV Upgrade
10'-16' Cut
10'-16' Cut; "O" Ring Upgrade
10'-16' Cut; Class HE/IV Upgrade
38" X 24" Elliptical Pipe (30" equivalent)
0'-10' Cut
0'-10' Cut; "O" Ring Upgrade
0'-10' Cut; Class HE/IV Upgrade
10'-16' Cut
10'-16' Cut; "O" Ring Upgrade
10'-16' Cut; Class HE/IV Upgrade
45" X 29" Elliptical Pipe (36" equivalent)
0'-10' Cut
0'-10' Cut; "O" Ring Upgrade
0'-10' Cut; Class HE/IV Upgrade
10'-16' Cut
10'-16' Cut; "O" Ring Upgrade
10'-16' Cut; Class HE/IV Upgrade
53" X 34" Elliptical Pipe (42" equivalent)
0'-12' Cut
0'-12' Cut; "O" Ring Upgrade
0'-12' Cut; Class HE/IV Upgrade
10'-18' Cut
10'-18' Cut; "O" Ring Upgrade
10'-18' Cut; Class HE/IV Upgrade
60" X 38" Elliptical Pipe (48" equivalent)
0'-12' Cut
0'-12' Cut; "O" Ring Upgrade
0'-12' Cut; Class HE/IV Upgrade
10'-18' Cut
10'-18' Cut; "O" Ring Upgrade
10'-18' Cut; Class HE/IV Upgrade
76" X 48" Elliptical Pipe (60" equivalent)
0'-12' Cut
0'-12' Cut; "O" Ring Upgrade
0'-12' Cut; Class HE/IV Upgrade
10'-18' Cut
10'-18' Cut; "O" Ring Upgrade
10'-18' Cut; Class HE/IV Upgrade
Page 13 of 44
$
$
$
$
$
$
85.26
135.41
104.07
127.88
178.04
146.70
LF
LF
LF
LF
LF
LF
$
$
$
$
$
$
106.58
156.73
113.22
160.49
210.63
167.14
LF
LF
LF
LF
LF
LF
$
$
$
$
$
$
136.67
196.84
146.27
204.27
264.56
213.97
LF
LF
LF
LF
LF
LF
$
$
$
$
$
$
191.83
254.53
204.69
287.12
349.81
299.98
LF
LF
LF
LF
LF
LF
$
$
$
$
$
$
245.74
314.71
263.30
368.61
437.57
386.17
LF
LF
LF
LF
LF
LF
$
$
$
$
$
$
304.67
387.42
326.00
457.64
540.39
478.96
LF
LF
LF
LF
LF
LF
$
$
$
$
$
$
455.13
549.17
487.73
682.06
776.10
714.66
LF
LF
LF
LF
LF
LF
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
STORM STRUCTURES
END SECTIONS
End Section (ES-1), Concrete
Pipe Size
12"
15"
18"
21"
24"
27"
30"
36"
42"
48"
54"
60"
$
$
$
$
$
$
$
$
$
$
$
$
535.37
595.55
733.47
873.89
921.53
1,226.20
1,351.59
2,023.61
2,057.46
2,471.21
3,294.95
4,035.94
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
End Section (ES-2), CMP
Pipe Size
12"
15"
18"
21"
24"
30"
36"
42"
48"
54"
60"
$
$
$
$
$
$
$
$
$
$
$
196.85
213.14
235.71
289.63
344.80
541.63
1,016.82
1,291.39
1,604.85
2,143.98
2,994.04
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
End Section (ES-3), Arch Pipe - CMP
Pipe Size
17" x 13" (15"0)
21" x 15" (18"0)
24" x 18" (21"0)
28" x 20" (24"0)
35" x 24" (30"0)
42" x 24" (36"0)
49" x 33" (42"0)
57" x 38" (48"0)
64" x 43" (54"0)
71" x 47" (60"0)
$
$
$
$
$
$
$
$
$
$
218.16
224.43
285.86
341.03
450.11
734.72
975.44
1,145.96
1,687.60
2,121.41
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
Page 14 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
ENDWALLS
Endwall (EW-1) Cast In Place
[Round pipe (12"-36")]
Pipe Size
12"
15"
18"
24"
30"
36"
$
$
$
$
$
$
752.27
1,003.02
1,191.09
1,504.55
2,507.57
2,758.33
EA
EA
EA
EA
EA
EA
Endwalls (EW-1) Precast
[Round pipe (12"-36")]
Pipe Size
12"
15"
18"
24"
30"
36"
$
$
$
$
$
$
940.34
1,003.02
1,567.24
2,382.19
2,507.57
2,758.33
EA
EA
EA
EA
EA
EA
Endwall (EW-1A) Cast In Place
[Elliptical Pipe (18"-42" equivalent)]
Pipe Size
23" x 14" (18")
30" x 19" (24")
38" x 24" (30")
45" x 29" (36")
53" x 34" (42")
$
$
$
$
$
734.72
1,058.19
1,441.86
1,883.19
2,449.90
EA
EA
EA
EA
EA
Endwall (EW-1A) Precast
[Elliptical Pipe (18"-42" equivalent)]
Pipe Size
23" x 14" (18")
30" x 19" (24")
38" x 24" (30")
45" x 29" (36")
53" x 34" (42")
$
$
$
$
$
796.16
1,122.14
1,297.67
1,629.93
2,068.75
EA
EA
EA
EA
EA
Endwall (EW-2) Cast In Place
[Pipe (42"-84")]
Pipe Size
42"
48"
54"
60"
72"
84"
$
$
$
$
$
$
5,581.85
7,101.45
8,224.83
9,662.92
12,665.75
14,531.37
EA
EA
EA
EA
EA
EA
Page 15 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
Endwall (EW-2) Precast
[Round pipe (42"-84")]
Pipe Size
42"
48"
54"
60"
72"
84"
$
$
$
$
$
$
6,376.75
6,706.50
7,804.81
8,350.21
9,385.85
11,188.78
EA
EA
EA
EA
EA
EA
Endwall (EW-2A) Cast In Place
[Elliptical Pipe 60"x38" (48")]
Pipe Size
60" x 38" (48")
$
7,101.45
EA
Endwall (EW-2PC) Precast
[Pipe (42"- 48")]
Pipe Size
42"
48"
$
$
6,376.75
6,705.25
EA
EA
Endwall (EW-2APC) Precast
[Elliptical Pipe 60"x38" (48")]
Pipe Size
60" x 38" (48")
$
6,771.70
EA
Endwall (EW-6PC) Precast
[Double Pipe (12"-36")]
Pipe Size
2-12"
2-15"
2-18"
2-24"
2-30"
2-36"
$
$
$
$
$
$
984.22
1,157.24
1,355.34
1,739.00
2,507.57
3,081.80
EA
EA
EA
EA
EA
EA
Endwall (EW-8) Cast in Place:
[Right-angle pipe (12"-48")]
Pipe Size
12"
15"
18"
24"
30"
36"
42"
48"
$
$
$
$
$
$
$
$
748.51
950.37
1,103.33
1,537.15
1,992.26
2,558.97
3,118.17
3,740.04
EA
EA
EA
EA
EA
EA
EA
EA
Page 16 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
Endwall (EW-8PC) Precast:
[Right-angle pipe (12"-48")]
Pipe Size
12"
15"
18"
24"
30"
36"
42"
48"
Endwall (EW-9PC) Precast:
[Arch Pipe (15"-48" equivalent)]
Pipe Size
17" x 13" (15")
21" x 15" (18")
24" x 18" (21")
28" x 20" (24")
35" x 24" (30")
42" x 29" (36")
49" x 33" (42")
57" x 38" (48")
UNIT
$
$
$
$
$
$
$
$
1,449.38
1,567.24
1,790.41
1,982.23
2,398.49
2,813.49
3,178.35
3,580.81
EA
EA
EA
EA
EA
EA
EA
EA
$
$
$
$
$
$
$
$
942.84
1,150.97
1,334.03
1,504.55
1,649.99
2,017.34
2,916.30
3,099.36
EA
EA
EA
EA
EA
EA
EA
EA
$
$
$
$
$
$
1,542.16
1,816.73
2,063.73
2,324.52
3,121.92
3,761.35
EA
EA
EA
EA
EA
EA
Endwall (EW-10PC) Precast
[Arch Pipe (15"-36" equivalent)]
Pipe Size
17" x 13" (15")
21" x 15" (18")
24" x 18" (21")
28" x 20" (24")
35" x 24" (30")
42" x 29" (36")
Page 17 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
HDPE PIPE
6" Pipe
0'-8' Cut
8'-14' Cut
$
$
29.78
44.68
LF
LF
0'-8' Cut
8'-14' Cut
$
$
33.36
50.05
LF
LF
0'-8' Cut
8'-14' Cut
$
$
40.12
60.18
LF
LF
0'-8' Cut
8'-14' Cut
$
$
45.14
67.70
LF
LF
0'-10' Cut
10'-16' Cut
$
$
58.93
88.39
LF
LF
0'-10' Cut
10'-16' Cut
$
$
77.73
116.61
LF
LF
0'-10' Cut
10'-16' Cut
$
$
90.77
136.36
LF
LF
0'-10' Cut
10'-16' Cut
$
$
107.83
161.74
LF
LF
0'-10' Cut
10'-16' Cut
$
$
119.67
179.48
LF
LF
0'-10' Cut
10'-16' Cut
$
$
134.53
201.74
LF
LF
0'-10' Cut
10'-16' Cut
$
$
152.96
230.70
LF
LF
0'-10' Cut
10'-16' Cut
$
$
211.26
316.89
LF
LF
8" Pipe
10" Pipe
12" Pipe
15" Pipe
18" Pipe
24" Pipe
30" Pipe
36" Pipe
42" Pipe
48" Pipe
60" Pipe
Page 18 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
MANHOLES
NOTE: As appropriate, additional costs - amount to add to unit costs below. ADD:
Standard Brick Manhole - (MH-1)
6' depth
6' depth with Heavy Duty Frame and Cover
6' depth with Watertight Frame and Cover
Depth below 6'
$
$
$
$
4,513.63
5,215.74
5,190.68
188.07
EA
EA
EA
VF
Manhole Covers
Heavy Duty Frame/Cover
Watertight Frame/Cover
$
$
702.12
677.04
EA
EA
Standard Frame and Cover (MH-2) 4 FT ID
6' depth
6' depth with Heavy Duty Frame and Cover
6' depth with Watertight Frame and Cover
Depth below 6'
$
$
$
$
3,761.35
4,463.47
4,438.40
200.60
EA
EA
EA
VF
Median Drop Inlet (DI-6A)
12"-24" Pipe
Inlet (H=8')
$
4,958.09
EA
Median Drop Inlet (DI-6B)
12"-24" Pipe
Inlet (H=8')
$
5,029.82
EA
Median Drop Inlet (DI-6C)
30"-48" Pipe
Inlet (H=10')
$
6,607.58
EA
Median Drop Inlet (DI-6D)
30"-48" Pipe
Inlet (H=10')
$
6,716.53
EA
Median Drop Inlet (DI-7) Type III Top
12"-42" Pipe
Inlet (H=10')
$
6,793.76
EA
Median Drop Inlet (DI-7A) Type III Top
12"-42" Pipe
Inlet (H=10')
$
7,476.45
EA
Median Drop Inlet (DI-7B) Type III Top
12"-42" Pipe
Inlet (H=10')
$
8,030.88
EA
MEDIAN DROP INLETS - CIP
Page 19 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
MISCELLANEOUS INLETS
Ditch Drop Inlet, (DI-5) Type III Top
12"-42" Pipe
Inlet (H=8')
$
6,167.62
EA
Standard Yard Inlet (YI-1)
12"-48" Pipe
(Invert depth (H)=0'-8')
Add Yard Inlet With Apron
Inlet length 4' (No Aprons)
Add Yard Inlet Apron
$
$
$
5,876.62
5,584.24
292.39
EA
EA
THROAT
Standard Yard Inlet (YI-2)
12"-48" Pipe
(Invert depth (H)=0'-8')
Add Yard Inlet With Apron
Inlet length 4' (No Aprons)
Add Yard Inlet Apron
$
$
$
6,035.22
5,742.84
292.39
EA
EA
THROAT
Standard Yard Inlet (YI-3)
12"-48" Pipe
(Invert depth (H)=0'-8')
Add Yard Inlet With Apron
Inlet Length 4' (No Aprons)
Add Yard Inlet Apron
$
$
$
6,159.34
5,866.97
292.39
EA
EA
THROAT
$
$
$
485.90
532.05
671.90
LF
LF
LF
$
$
$
400.84
865.11
1,326.50
EA
EA
EA
$
$
$
4.08
3.53
2.68
SY
SY
SY
$
$
$
152.96
194.34
250.76
CY
CY
CY
$
$
74.48
32.60
SY
SY
$
$
$
158.60
360.46
576.74
EA
EA
EA
MISCELLANEOUS STORM
Casing Pipe, Bore and Jack (3/8" wall)
22" ID (6"-8" carrier pipe)
24" ID (10" carrier pipe)
30" ID (12" carrier pipe)
Connection to Existing Structure
6"-12" Pipe
15"-36" Pipe
42"-60" Pipe
Filter Fabric
Class I
Class II
Class III
Gabions (No excavation)
Mattress
Revetment
Wall
Paved Ditch - 4" Thick
Concrete (Non-reinforced)
Bituminous concrete
Plug Pipe
6"-12" pipe
15"-36" Pipe
42"-60" pipe
Page 20 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
Remove Old Pipe, New Pipe in Same Trench,
Restore Trench (0'-10')
6"-12" pipe (RCP)
15"-36" Pipe (RCP)
42"-60" pipe (RCP)
$
$
$
55.17
140.42
250.76
LF
LF
LF
Remove Pipe and Restore Trench (0'-10')
6"-12" pipe
15"-36" Pipe
42"-60" pipe
$
$
$
43.89
55.17
100.30
LF
LF
LF
Remove Pipe, Relay Existing Pipe in Another Trench,
Restore Both Trenches (0'-10')
6"-12" pipe
15"-36" Pipe
42"-60" pipe
$
$
$
96.55
140.42
250.76
LF
LF
LF
$
$
$
$
56.27
60.18
67.53
82.75
SY
SY
SY
SY
Pre-stressed Conc (12")
Remove piles:
Steel H Piles
Timber
Sheet
Steel (10") (H Section)
Treated Timber (12")
Untreated Timber (12")
$
30.09
LF
$
$
$
$
$
$
19.11
12.54
45.14
41.38
21.32
17.55
LF
LF
SF
LF
LF
LF
Sodded Ditch Including Fine Grading
$
11.29
SY
Rip rap
Dry, Class I, 18"
Dry, Class II, 18"
Dry, Class III, 18"
Grouted, Class I, 18"
Shoring and piles (No mobilization)
Sodded Ditch
Page 21 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
RCP, CLASS III ROUND T&G with MASTIC
12" Pipe
0'-8' Cut without "O" Ring
0'-8' Cut with "O" Ring
0'-8' Cut; Class IV without O Ring
0'-8' Cut; Class IV with O Ring
0'-8' Cut; Class V without O Ring
0'-8' Cut; Class V with O Ring
8'-14' Cut; without "O" Ring
8'-14' Cut with "O" Ring
8'-14' Cut; Class IV without O Ring
8'-14' Cut; Class IV with O Ring
8'-14' Cut; Class V without O Ring
8'-14' Cut; Class V with O Ring
$
$
$
$
$
$
$
$
$
$
$
$
43.87
50.15
44.50
50.78
45.13
51.41
65.20
71.47
65.82
72.10
66.45
72.73
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
0'-10' Cut without "O" Ring
0'-10' Cut with "O" Ring
0'-10' Cut; Class IV without O Ring
0'-10' Cut; Class IV with O Ring
0'-10' Cut; Class V without O Ring
0'-10' Cut; Class V with O Ring
10'-16' Cut; Class IV without O Ring
10'-16' Cut; Class IV with O Ring
$
$
$
$
$
$
$
$
$
$
50.15
56.42
51.02
57.30
51.41
57.68
82.75
89.03
83.62
89.90
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
10'-16' Cut; Class V without O Ring
$
84.01
LF
10'-16' Cut; Class V with O Ring
$
90.29
LF
0'-10' Cut without "O" Ring
10'-16' Cut; Class IV without O Ring
10'-16' Cut; Class IV with O Ring
$
$
$
$
$
$
$
$
$
$
60.18
68.08
62.50
70.40
65.07
72.97
96.55
104.45
98.86
106.76
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
10'-16' Cut; Class V without O Ring
$
101.43
LF
10'-16' Cut; Class V with O Ring
$
109.33
LF
15" Pipe
10'-16' Cut without "O" Ring
10'-16' Cut with "O" Ring
18" Pipe
0'-10' Cut with "O" Ring
0'-10' Cut; Class IV without O Ring
0'-10' Cut; Class IV with O Ring
0'-10' Cut; Class V without O Ring
0'-10' Cut; Class V with O Ring
10'-16' Cut without "O" Ring
10'-16' Cut with "O" Ring
Page 22 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
21" Pipe
0'-10' Cut without "O" Ring
$
70.21
LF
0'-10' Cut with "O" Ring
0'-10' Cut; Class IV without O Ring
0'-10' Cut; Class IV with O Ring
0'-10' Cut; Class V without O Ring
0'-10' Cut; Class V with O Ring
10'-16' Cut without "O" Ring
10'-16' Cut with "O" Ring
10'-16' Cut; Class IV without O Ring
10'-16' Cut; Class IV with O Ring
10'-16' Cut; Class V without O Ring
10'-16' Cut; Class V with O Ring
$
$
$
$
$
$
$
$
$
$
$
85.26
73.53
88.57
75.54
90.58
107.83
122.87
111.13
126.18
113.14
128.19
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
0'-10' Cut without "O" Ring
0'-10' Cut with "O" Ring
0'-10' Cut; Class IV without O Ring
0'-10' Cut; Class IV with O Ring
0'-10' Cut; Class V without O Ring
0'-10' Cut; Class V with O Ring
10'-16' Cut without "O" Ring
10'-16' Cut with "O" Ring
10'-16' Cut; Class IV without O Ring
10'-16' Cut; Class IV with O Ring
10'-16' Cut; Class V without O Ring
10'-16' Cut; Class V with O Ring
$
$
$
$
$
$
$
$
$
$
$
$
81.49
97.80
85.35
101.65
89.32
105.62
115.34
131.65
119.21
135.51
123.18
139.48
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
0'-10' Cut without "O" Ring
0'-10' Cut with "O" Ring
0'-10' Cut; Class IV without O Ring
0'-10' Cut; Class IV with O Ring
0'-10' Cut; Class V without O Ring
0'-10' Cut; Class V with O Ring
10'-16' Cut without "O" Ring
10'-16' Cut with "O" Ring
10'-16' Cut; Class IV without O Ring
10'-16' Cut; Class IV with O Ring
10'-16' Cut; Class V without O Ring
10'-16' Cut; Class V with O Ring
$
$
$
$
$
$
$
$
$
$
$
$
71.47
89.03
76.23
93.79
91.14
108.69
106.58
124.13
111.34
128.90
126.24
143.79
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
0'-10' Cut without "O" Ring
0'-10' Cut with "O" Ring
0'-10' Cut; Class IV without O Ring
0'-10' Cut; Class IV with O Ring
0'-10' Cut; Class V without O Ring
0'-10' Cut; Class V with O Ring
10'-16' Cut without "O" Ring
10'-16' Cut with "O" Ring
10'-16' Cut; Class IV without O Ring
10'-16' Cut; Class IV with O Ring
10'-16' Cut; Class V without O Ring
10'-16' Cut; Class V with O Ring
$
$
$
$
$
$
$
$
$
$
$
$
97.80
117.85
105.02
125.08
115.65
135.72
146.70
166.76
153.80
173.97
165.56
184.61
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
24" Pipe
27" Pipe
30" Pipe
Page 23 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
33" Pipe
0'-12' Cut; without "O" Ring
0'-12' Cut; with "O" Ring
0'-12' Cut; Class IV without O Ring
0'-12' Cut; Class IV with O Ring
0'-12' Cut; Class V without O Ring
0'-12' Cut; Class V with O Ring
12'-18' Cut; without "O" Ring
12'-18' Cut with "O" Ring
12'-18' Cut; Class IV without O Ring
12'-18' Cut; Class IV with O Ring
12'-18' Cut; Class V without O Ring
12'-18' Cut; Class V with O Ring
$
$
$
$
$
$
$
$
$
$
$
$
129.14
154.22
136.47
161.53
149.60
174.68
193.08
218.16
200.40
225.48
213.54
238.62
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
0'-12' Cut; without "O" Ring
0'-12' Cut; with "O" Ring
0'-12' Cut; Class IV without O Ring
0'-12' Cut; Class IV with O Ring
0'-12' Cut; Class V without O Ring
0'-12' Cut; Class V with O Ring
12'-18' Cut; without "O" Ring
12'-18' Cut with "O" Ring
12'-18' Cut; Class IV without O Ring
12'-18' Cut; Class IV with O Ring
12'-18' Cut; Class V without O Ring
12'-18' Cut; Class V with O Ring
$
$
$
$
$
$
$
$
$
$
$
$
137.91
164.25
147.35
173.68
162.52
188.85
206.87
233.20
216.30
242.63
231.47
257.80
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
0'-12' Cut; without "O" Ring
0'-12' Cut; with "O" Ring
0'-12' Cut; Class IV without O Ring
0'-12' Cut; Class IV with O Ring
0'-12' Cut; Class V without O Ring
0'-12' Cut; Class V with O Ring
12'-18' Cut; without "O" Ring
12'-18' Cut with "O" Ring
12'-18' Cut; Class IV without O Ring
12'-18' Cut; Class IV with O Ring
12'-18' Cut; Class V without O Ring
12'-18' Cut; Class V with O Ring
$
$
$
$
$
$
$
$
$
$
$
$
162.99
204.37
177.79
219.17
196.65
238.02
245.74
287.12
260.54
301.91
279.40
320.77
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
0'-12' Cut; without "O" Ring
0'-12' Cut; with "O" Ring
0'-12' Cut; Class IV without O Ring
0'-12' Cut; Class IV with O Ring
0'-12' Cut; Class V without O Ring
0'-12' Cut; Class V with O Ring
12'-18' Cut; without "O" Ring
12'-18' Cut with "O" Ring
12'-18' Cut; Class IV without O Ring
12'-18' Cut; Class IV with O Ring
12'-18' Cut; Class V without O Ring
12'-18' Cut; Class V with O Ring
$
$
$
$
$
$
$
$
$
$
$
$
184.32
235.10
198.71
249.51
220.48
271.28
263.31
314.10
277.71
328.51
299.47
350.26
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
36" Pipe
42" Pipe
48" Pipe
Page 24 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
54" Pipe
0'-12' Cut; without "O" Ring
0'-12' Cut; with "O" Ring
0'-12' Cut; Class IV without O Ring
0'-12' Cut; Class IV with O Ring
0'-12' Cut; Class V without O Ring
0'-12' Cut; Class V with O Ring
12'-18' Cut; without "O" Ring
12'-18' Cut with "O" Ring
12'-18' Cut; Class IV without O Ring
12'-18' Cut; Class IV with O Ring
12'-18' Cut; Class V without O Ring
12'-18' Cut; Class V with O Ring
$
$
$
$
$
$
$
$
$
$
$
$
225.68
277.09
248.95
300.37
278.29
329.71
332.25
383.66
355.52
406.92
384.86
436.27
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
0'-12' Cut; without "O" Ring
0'-12' Cut; with "O" Ring
0'-12' Cut; Class IV without O Ring
0'-12' Cut; Class IV with O Ring
0'-12' Cut; Class V without O Ring
0'-12' Cut; Class V with O Ring
12'-18' Cut; without "O" Ring
12'-18' Cut with "O" Ring
12'-18' Cut; Class IV without O Ring
12'-18' Cut; Class IV with O Ring
12'-18' Cut; Class V without O Ring
12'-18' Cut; Class V with O Ring
$
$
$
$
$
$
$
$
$
$
$
$
270.81
327.25
296.64
353.07
332.00
388.42
406.23
462.65
432.05
488.47
467.40
523.84
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
0'-12' Cut; without "O" Ring
0'-12' Cut; with "O" Ring
0'-12' Cut; Class IV without O Ring
0'-12' Cut; Class IV with O Ring
0'-12' Cut; Class V without O Ring
0'-12' Cut; Class V with O Ring
12'-18' Cut; without "O" Ring
12'-18' Cut with "O" Ring
12'-18' Cut; Class IV without O Ring
12'-18' Cut; Class IV with O Ring
12'-18' Cut; Class V without O Ring
12'-18' Cut; Class V with O Ring
$
$
$
$
$
$
$
$
$
$
$
$
303.41
361.09
339.32
397.00
381.05
438.72
455.13
512.80
491.03
548.72
532.76
590.43
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
0'-14' Cut; without "O" Ring
0'-14' Cut with "O" Ring
0'-14' Cut Class IV without "O" Ring
0'-14' Cut; Class IV with O Ring
0'-14' Cut; Class V without "O" Ring
0 '-14' Cut; Class V with O Ring
14'-20' Cut; Without "O" Ring
14'-20' Cut with "O" Ring
14'-20' Cut; Class IV without "O" Ring
14'-20' Cut; Class IV with O Ring
14'-20' Cut; Class V without "O" Ring
14'-20' Cut; Class V with O Ring
$
$
$
$
$
$
$
$
$
$
$
$
339.77
403.72
386.96
450.91
429.64
493.60
509.03
572.98
556.23
620.18
598.91
662.85
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
60" Pipe
66" Pipe
72" Pipe
Page 25 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
84" Pipe
0'-14' Cut; without "O" Ring
0'-14' Cut with "O" Ring
0'-14' Cut Class IV without "O" Ring
0'-14' Cut; Class IV with O Ring
0'-14' Cut; Class V without "O" Ring
0 '-14' Cut; Class V with O Ring
14'-20' Cut; Without "O" Ring
14'-20' Cut with "O" Ring
14'-20' Cut; Class IV without "O" Ring
14'-20' Cut; Class IV with O Ring
14'-20' Cut; Class V without "O" Ring
14'-20' Cut; Class V with O Ring
$
$
$
$
$
$
$
$
$
$
$
$
450.11
550.42
512.63
612.94
561.71
662.00
674.53
774.84
737.05
837.36
786.13
886.42
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
0'-14' Cut; without "O" Ring
0'-14' Cut with "O" Ring
0'-14' Cut Class IV without "O" Ring
0'-14' Cut; Class IV with O Ring
0'-14' Cut; Class V without "O" Ring
0 '-14' Cut; Class V with O Ring
14'-20' Cut; Without "O" Ring
14'-20' Cut with "O" Ring
14'-20' Cut; Class IV without "O" Ring
14'-20' Cut; Class IV with O Ring
14'-20' Cut; Class V without "O" Ring
14'-20' Cut; Class V with O Ring
$
$
$
$
$
$
$
$
$
$
$
$
532.86
668.27
608.09
743.49
673.28
808.69
752.27
887.67
827.49
962.90
892.69
1,028.09
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
0'-14' Cut; without "O" Ring
0'-14' Cut with "O" Ring
0'-14' Cut Class IV without "O" Ring
0'-14' Cut; Class IV with O Ring
0'-14' Cut; Class V without "O" Ring
0 '-14' Cut; Class V with O Ring
14'-20' Cut; Without "O" Ring
14'-20' Cut with "O" Ring
14'-20' Cut; Class IV without "O" Ring
14'-20' Cut; Class IV with O Ring
14'-20' Cut; Class V without "O" Ring
14'-20' Cut; Class V with O Ring
Extra Strength Concrete 8" Pipe
0'-8' Cut
8'-14' Cut
Extra Strength Concrete 10" Pipe
0'-8' Cut
8'-14' Cut
$
$
$
$
$
$
$
$
$
$
$
$
651.96
807.43
748.51
903.98
818.72
974.19
866.37
1,021.84
962.91
1,118.38
1,033.12
1,188.59
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
$
$
36.37
53.91
LF
LF
$
$
41.39
61.44
LF
LF
96" Pipe
108" Pipe
Page 26 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
ROUND PIPE - CMP
CMP Plain 12 GA.
36" Pipe
0'-12' Cut
0'-12' Cut; Coated Paved Invert
12'-18' Cut
12'-18' Cut; Coated Paved Invert
$
$
$
$
104.07
119.11
155.47
170.52
LF
LF
LF
LF
0'-12' Cut
0'-12' Cut; Coated Paved Invert
12'-18' Cut
12'-18' Cut; Coated Paved Invert
$
$
$
$
111.59
129.14
166.76
184.32
LF
LF
LF
LF
0'-12' Cut
0'-12' Cut; Coated Paved Invert
12'-18' Cut
12'-18' Cut; Coated Paved Invert
$
$
$
$
120.36
140.42
180.55
200.60
LF
LF
LF
LF
0'-12' Cut
0'-12' Cut; Coated Paved Invert
12'-18' Cut
12'-18' Cut; Coated Paved Invert
$
$
$
$
132.90
152.96
199.35
219.42
LF
LF
LF
LF
0'-12' Cut
0'-12' Cut; Coated Paved Invert
12'-18' Cut
12'-18' Cut; Coated Paved Invert
$
$
$
$
150.45
175.53
225.68
250.76
LF
LF
LF
LF
0'-14' Cut
0'-14' Cut; Coated Paved Invert
14'-20' Cut
14'-20' Cut; Coated Paved Invert
$
$
$
$
342.29
373.64
433.80
465.16
LF
LF
LF
LF
0'-14' Cut
0'-14' Cut; Coated Paved Invert
14'-20' Cut
14'-20' Cut; Coated Paved Invert
$
$
$
$
411.24
448.85
601.81
639.43
LF
LF
LF
LF
0'-14' Cut
0'-14' Cut; Coated Paved Invert
14'-20' Cut
14'-20' Cut; Coated Paved Invert
$
$
$
$
448.85
492.75
537.88
581.76
LF
LF
LF
LF
0'-14' Cut
0'-14' Cut; Coated Paved Invert
14'-20' Cut
14'-20' Cut; Coated Paved Invert
$
$
$
$
526.59
576.73
626.89
677.04
LF
LF
LF
LF
42" Pipe
48" Pipe
54" Pipe
60" Pipe
72" Pipe
84" Pipe
96" Pipe
108" Pipe
Page 27 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
CMP Plain 14 GA.
24" Pipe
0'-10' Cut
0'-10' Cut; Coated Paved Invert
10'-16' Cut
10'-16' Cut; Coated Paved Invert
$
$
$
$
56.42
67.71
91.53
102.82
LF
LF
LF
LF
0'-10' Cut
0'-10' Cut; Coated Paved Invert
10'-16' Cut
10'-16' Cut; Coated Paved Invert
$
$
$
$
66.45
78.99
101.57
114.11
LF
LF
LF
LF
0'-8' Cut
8'-14' Cut
$
$
24.95
50.62
LF
LF
0'-8' Cut
0'-8' Cut; Coated Invert
8'-14' Cut
8'-14' Cut; Coated Invert
$
$
$
$
28.08
31.85
53.78
57.55
LF
LF
LF
LF
0'-8' Cut
0'-8' Cut; Coated Invert
8'-14' Cut
8'-14' Cut; Coated Invert
$
$
$
$
33.60
39.87
60.01
66.29
LF
LF
LF
LF
0'-10' Cut
0'-10' Cut; Coated Paved Invert
10'-16' Cut
10'-16' Cut; Coated Paved Invert
$
$
$
$
36.10
43.63
77.73
85.26
LF
LF
LF
LF
0'-10' Cut
0'-10' Cut; Coated Paved Invert
10'-16' Cut
10'-16' Cut; Coated Paved Invert
$
$
$
$
46.40
55.17
82.75
91.53
LF
LF
LF
LF
0'-10' Cut
0'-10' Cut; Coated Paved Invert
10'-16' Cut
10'-16' Cut; Coated Paved Invert
$
$
$
$
50.15
60.18
87.76
97.80
LF
LF
LF
LF
$
$
125.38
100.30
CY
CY
$
$
156.73
125.38
CY
CY
$
$
$
17.55
30.09
3.13
LF
LF
LF
30" Pipe
CMP Plain 16 GA.
6" Pipe
8" Pipe
12" Pipe
15" Pipe
18" Pipe
21" Pipe
Storm Sewer
Rock Excavation - in trenches:
Blast - All Pipes
less than 1,500 CY
greater than 1,500cy
Hoe ram - All Pipes
less than 1,500cy
greater than 1,500cy
Select Backfill
0'-5' Deep (3"-12" pipe)
0'-6' Deep (12"-24" pipe)
Trench De-watering
Page 28 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
Utilities
MISCELLANEOUS SEWER
Air Relief Valve (No manhole)
1-1/4" Valve
1-1/2" Valve
2" Valve
2-1/2" Valve
3" Valve
4" Valve
6" Valve
Casing Pipe, Bore and Jack (3/8" wall thickness)
22" ID (8" carrier pipe)
24" ID (10" carrier pipe)
30" ID (12" carrier pipe)
Class B concrete for unsuitable foundation material
Foundation material A3
Foundation material A4
Concrete Pier for Storm Drainage Crossing Sanitary Sewer
6" Pipe
15" Pipe
27" Pipe
Connection to Existing Manhole
8" core bore
Force Main
Pipe Size
4"
6"
8"
10"
12"
14"
16"
Internal Drop Connection to Manhole
8" Pipe PVC
Lateral Spur, with clean out and connection to new main
4" diameter, greater than 10' deep
Connect to existing main with clean out
Page 29 of 44
$
$
$
$
$
$
$
315.95
406.22
586.77
881.41
1,115.86
1,499.53
3,303.73
EA
EA
EA
EA
EA
EA
EA
$
$
$
501.51
584.26
702.12
LF
LF
LF
$
$
940.34
626.89
CY
CY
$
$
$
137.92
191.71
321.34
EA
EA
EA
$
1,253.78
EA
$
$
$
$
$
$
$
27.33
34.11
41.22
45.37
54.29
73.98
88.51
LF
LF
LF
LF
LF
LF
LF
$
752.27
EA
$
$
55.17
1,880.68
VF
EA
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
Standard Concrete Encasement
8" Pipe
10" Pipe
12" Pipe
15" Pipe
18" Pipe
21" Pipe
Standard External Drop Connection To Manhole, CI; Inc. Bend - 2 Ea Wye - 1 Ea Extra Core
8" Pipe
10" Pipe
12" Pipe
15" Pipe
Temporary Pump Around
8" Line Each Location
Tunnel: Liner Plate (8 Gauge)
48" OD (15"-18" carrier pipe)
54" OD (21"-24" carrier pipe)
60" OD (27"-30" carrier pipe)
66" OD (33"-36" carrier pipe)
72" OD (42" carrier pipe)
78" OD (48" carrier pipe)
84" OD (54" carrier pipe)
UNIT
$
$
$
$
$
$
53.92
61.44
66.46
76.49
85.26
95.29
LF
LF
LF
LF
LF
LF
$
$
$
$
702.12
952.87
1,115.86
1,755.30
EA
EA
EA
EA
$
12,537.86
Months
$
$
$
$
$
$
$
1,020.58
1,189.84
1,517.09
1,765.33
2,013.58
2,268.09
2,530.14
LF
LF
LF
LF
LF
LF
LF
Drywell Type, 8' ID with standby generator and 8 foot diameter wetwell
Concrete
Fiberglass
Steel
$
$
$
608,086.07
608,086.07
608,086.07
LS
LS
LS
Wetwell Type with stand by generator
Duplex Grinder Pump in 4 foot diameter wetwell
Simplex Grinder Pump in 4 foot diameter wetwell
Submersible Pumps in 6 foot diameter wetwell
$
$
$
36,986.68
31,344.64
290,878.28
LS
LS
LS
PUMPING STATION SEWER
Page 30 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
RCP, CLASS III ROUND
(WITH MODS FOR OTHER CLASSES)
12" Pipe
0'-8' Cut including O Ring
0'-8' Cut; Class IV W/O Ring
0'-8' Cut: Class V W/O Ring
8'-14' Cut including O Ring
8'-14' Cut; Class IV W/O Ring
8'-14' Cut; Class V W/O Ring
$
$
$
$
$
$
56.43
57.05
57.68
77.73
78.35
78.99
LF
LF
lf
LF
LF
LF
0'-10' Cut including O Ring
0'-10' Cut; Class IV W/O Ring
0'-10' Cut; Class V W/O Ring
10'-16' Cut; including O Ring
10'-16' Cut; Class IV W/O Ring
10'-16' Cut; Class V W/O Ring
$
$
$
$
$
$
60.18
61.05
61.44
87.77
88.64
89.03
LF
LF
l
LF
LF
LF
0'-10' Cut including O Ring
0'-10' Cut; Class IV W/O Ring
0'-10' Cut; Class V W/O Ring
10'-16' Cut; including O Ring
10'-16' Cut; Class IV W/O Ring
10'-16' Cut; Class V W/O Ring
$
$
$
$
$
$
68.08
70.40
72.97
108.19
110.51
113.09
LF
LF
LF
LF
LF
LF
0'-10' Cut including O Ring
0'-10' Cut; Class IV W/O Ring
0'-10' Cut; Class V W/O Ring
10'-16' Cut; including O Ring
10'-16' Cut; Class IV W/O Ring
10'-16' Cut; Class V W/O Ring
$
$
$
$
$
$
87.76
91.08
93.09
135.41
138.72
140.73
LF
LF
LF
LF
LF
LF
0'-10' Cut including O Ring
0'-10' Cut; Class IV W/O Ring
0'-10' Cut; Class V W/O Ring
10'-16' Cut; including O Ring
10'-16' Cut; Class IV W/O Ring
10'-16' Cut; Class V W/O Ring
$
$
$
$
$
$
95.29
99.15
103.11
144.19
148.04
152.02
LF
LF
LF
LF
LF
LF
0'-10' Cut including O Ring
0'-10' Cut; Class IV W/O Ring
0'-10' Cut; Class V W/O Ring
10'-16' Cut; including O Ring
10'-16' Cut; Class IV W/O Ring
10'-16' Cut; Class V W/O Ring
$
$
$
$
$
$
101.56
106.33
121.22
156.73
161.49
176.39
LF
LF
LF
LF
LF
LF
0'-10' Cut including O Ring
0'-10' Cut; Class IV W/O Ring
0'-10' Cut; Class V W/O Ring
10'-16' Cut; including O Ring
10'-16' Cut; Class IV W/O Ring
10'-16' Cut; Class V W/O Ring
$
$
$
$
$
$
130.39
137.60
148.25
195.59
202.81
213.45
LF
LF
LF
LF
LF
LF
15" Pipe
18" Pipe
21" Pipe
24" Pipe
27" Pipe
30" Pipe
Page 31 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
33" Pipe
0'-12' Cut including O Ring
0'-12' Cut; Class IV W/O Ring
0'-12' Cut; Class V W/O Ring
12'-18' Cut including O Ring
12'-18' Cut; Class IV W/O Ring
12'-18' Cut; Class V W/O Ring
$
$
$
$
$
$
179.30
186.61
199.75
255.78
263.09
276.23
LF
LF
LF
LF
LF
LF
0'-12' Cut including O Ring
0'-12' Cut; Class IV W/O Ring
0'-12' Cut; Class V W/O Ring
12'-18' Cut including O Ring
12'-18' Cut; Class IV W/O Ring
12'-18' Cut; Class V W/O Ring
$
$
$
$
$
$
205.62
215.05
230.22
264.56
273.98
289.15
LF
LF
LF
LF
LF
LF
0'-12' Cut including O Ring
0'-12' Cut; Class IV W/O Ring
0'-12' Cut; Class V W/O Ring
12'-18' Cut including O Ring
12'-18' Cut; Class IV W/O Ring
12'-18' Cut; Class V W/O Ring
$
$
$
$
$
$
229.45
244.24
263.10
310.94
325.73
344.59
LF
LF
LF
LF
LF
LF
0'-12' Cut including O Ring
0'-12' Cut; Class IV W/O Ring
0'-12' Cut; Class V W/O Ring
12'-18' Cut including O Ring
12'-18' Cut; Class IV W/O Ring
12'-18' Cut; Class V W/O Ring
$
$
$
$
$
$
285.26
299.66
321.42
320.36
334.77
356.52
LF
LF
LF
LF
LF
LF
0'-12' Cut including O Ring
0'-12' Cut; Class IV W/O Ring
0'-12' Cut; Class V W/O Ring
12'-18' Cut including O Ring
12'-18' Cut; Class IV W/O Ring
12'-18' Cut; Class V W/O Ring
$
$
$
$
$
$
302.17
325.43
354.78
383.88
406.92
436.27
LF
LF
LF
LF
LF
LF
0'-12' Cut including O Ring
0'-12' Cut; Class IV W/O Ring
0'-12' Cut; Class V W/O Ring
12'-18' Cut including O Ring
12'-18' Cut; Class IV W/O Ring
12'-18' Cut; Class V W/O Ring
$
$
$
$
$
$
327.24
353.07
388.42
462.65
488.47
523.84
LF
LF
LF
LF
LF
LF
0'-12' Cut including O Ring
0'-12' Cut; Class IV W/O Ring
0'-12' Cut; Class V W/O Ring
12'-18' Cut including O Ring
12'-18' Cut; Class IV W/O Ring
12'-18' Cut; Class V W/O Ring
$
$
$
$
$
$
361.09
397.56
438.72
512.80
548.72
590.43
LF
LF
LF
LF
LF
LF
0'-14' Cut including O Ring
0'-14' Cut; Class IV Upgrade W/O Ring
0'-14' Cut; Class V Upgrade W/O Ring
14'-20' Cut; including O Ring
14'-20' Cut; Class IV Upgrade W/O Ring
14'-20' Cut; Class V Upgrade WO Ring
$
$
$
$
$
$
403.72
450.91
493.60
572.98
620.18
662.85
LF
LF
LF
LF
LF
LF
36" Pipe
42" Pipe
48" Pipe
54" Pipe
60" Pipe
66" Pipe
72" Pipe
Page 32 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
84" Pipe
0'-14' Cut including O Ring
0'-14' Cut; Class IV Upgrade W/O Ring
0'-14' Cut; Class V Upgrade W/O Ring
14'-20' Cut; including O Ring
14'-20' Cut; Class IV Upgrade W/O Ring
14'-20' Cut; Class V Upgrade WO Ring
$
$
$
$
$
$
550.42
612.94
662.00
774.84
837.36
886.42
LF
LF
LF
LF
LF
LF
0'-14' Cut including O Ring
0'-14' Cut; Class IV Upgrade W/O Ring
0'-14' Cut; Class V Upgrade W/O Ring
14'-20' Cut; including O Ring
14'-20' Cut; Class IV Upgrade W/O Ring
14'-20' Cut; Class V Upgrade WO Ring
$
$
$
$
$
$
668.27
743.49
808.69
887.67
962.90
1,028.09
LF
LF
LF
LF
LF
LF
0'-14' Cut including O Ring
0'-14' Cut; Class IV Upgrade W/O Ring
0'-14' Cut; Class V Upgrade W/O Ring
14'-20' Cut; including O Ring
14'-20' Cut; Class IV Upgrade W/O Ring
14'-20' Cut; Class V Upgrade WO Ring
$
$
$
$
$
$
807.43
903.98
974.19
1,021.84
1,118.38
1,188.59
LF
LF
LF
LF
LF
LF
96" Pipe
108" Pipe
Page 33 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
SANITARY SEWER
Note: All pipe unit prices include trench excavation, bedding, pipe, and backfill
DIP (CLASS 50)
30" Pipe
0'-10' Cut
0'-10' Cut; Class 51 Upgrade
0'-10' Cut; Class 52 Upgrade
0'-10' Cut; Class 53 Upgrade
10'-16' Cut
10'-16' Cut; Class 51 Upgrade
10'-16' Cut; Class 52 Upgrade
10'-16' Cut; Class 53 Upgrade
$
$
$
$
$
$
$
$
177.04
189.41
201.86
214.20
211.41
223.77
236.23
248.56
LF
LF
LF
LF
LF
LF
LF
LF
0'-10' Cut
0'-10' Cut; Class 51 Upgrade
0'-10' Cut; Class 52 Upgrade
0'-10' Cut; Class 53 Upgrade
10'-16' Cut
10'-16' Cut; Class 51 Upgrade
10'-16' Cut; Class 52 Upgrade
10'-16' Cut; Class 53 Upgrade
$
$
$
$
$
$
$
$
233.20
250.22
267.81
288.81
266.30
283.32
300.91
321.91
LF
LF
LF
LF
LF
LF
LF
LF
0'-10' Cut
0'-10' Cut; Class 51 Upgrade
0'-10' Cut; Class 52 Upgrade
0'-10' Cut; Class 53 Upgrade
10'-16' Cut
10'-16' Cut; Class 51 Upgrade
10'-16' Cut; Class 52 Upgrade
10'-16' Cut; Class 53 Upgrade
$
$
$
$
$
$
$
$
279.74
303.33
326.91
350.73
321.82
345.41
369.00
392.82
LF
lf
LF
LF
LF
LF
LF
LF
0'-10' Cut
0'-10' Cut; Class 51 Upgrade
0'-10' Cut; Class 52 Upgrade
0'-10' Cut; Class 53 Upgrade
10'-16' Cut
10'-16' Cut; Class 51 Upgrade
10'-16' Cut; Class 52 Upgrade
10'-16' Cut; Class 53 Upgrade
$
$
$
$
$
$
$
$
341.53
377.22
412.69
446.37
383.66
419.34
454.82
488.49
LF
LF
LF
LF
LF
LF
LF
LF
0'-10' Cut
0'-10' Cut; Class 51 Upgrade
0'-10' Cut; Class 52 Upgrade
0'-10' Cut; Class 53 Upgrade
10'-16' Cut
10'-16' Cut; Class 51 Upgrade
10'-16' Cut; Class 52 Upgrade
10'-16' Cut; Class 53 Upgrade
$
$
$
$
$
$
$
$
421.27
473.07
510.49
524.47
460.39
511.62
549.61
563.59
LF
LF
LF
LF
LF
LF
LF
LF
36" Pipe
42" Pipe
48" Pipe
54" Pipe
Page 34 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
PVC PIPE
6" Pipe PVC with gravel
0'-8' Cut
0'-8' Cut With Dip Class 50
8'-14' Cut
8'-14' Cut With Dip Class 50
$
$
$
$
24.80
46.60
56.95
78.74
LF
LF
LF
LF
0'-8' Cut
0'-8' Cut With Dip Class 50
8'-14' Cut
8'-14' Cut With Dip Class 50
$
$
$
$
43.89
73.56
86.52
116.18
LF
LF
LF
LF
0'-8' Cut
0'-8' Cut With Dip Class 50
8'-14' Cut
8'-14' Cut With Dip Class 50
$
$
$
$
47.64
71.46
87.76
111.59
LF
LF
LF
LF
0'-8' Cut
0'-8' Cut With Dip Class 50
8'-14' Cut
8'-14' Cut With Dip Class 50
$
$
$
$
56.43
189.25
119.11
251.95
LF
LF
LF
LF
0'-10' Cut
0'-10' Cut With Dip Class 50
10'-16' Cut
10'-16' Cut With Dip Class 50
$
$
$
$
78.99
130.41
119.11
170.54
LF
LF
LF
LF
0'-10' Cut
0'-10' Cut With Dip Class 50
10'-16' Cut
10'-16' Cut With Dip Class 50
$
$
$
$
82.75
143.66
131.65
192.56
LF
LF
LF
LF
0'-10' Cut
0'-10' Cut With Dip Class 50
10'-16' Cut
10'-16' Cut With Dip Class 50
$
$
$
$
112.84
167.53
155.47
210.16
LF
LF
LF
LF
0'-10' Cut
0'-10' Cut With Dip Class 50
10'-16' Cut
10'-16' Cut With Dip Class 50
$
$
$
$
122.87
195.51
165.50
238.14
LF
LF
LF
LF
0'-10' Cut
0'-10' Cut With Dip Class 50
10'-16' Cut
10'-16' Cut With Dip Class 50
$
$
$
$
132.90
208.12
188.07
263.30
LF
LF
LF
LF
8" Pipe PVC
10" Pipe PVC
12" Pipe PVC
15" Pipe PVC
18" Pipe PVC
21" Pipe PVC
24" Pipe PVC
27" Pipe PVC
Page 35 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
Rock Excavation - in trenches:
Blast - All Pipes
less than 1,500 CY
greater than 1,500cy
Hoe ram - All Pipes
less than 1,500cy
greater than 1,500cy
Select Backfill
0'-5' Deep (3"-12" pipe)
0'-6' Deep (12"-24" pipe)
Trench De-watering
SANITARY SEWER STRUCTURES
Heavy duty frame and cover
Manhole vent: 4" diameter, 6' high
Standard Precast Manhole Frame and Cover
03 FT ID
Dept (Vertical Separation of Top and Bottom)
Standard Manhole (Base, Top)
With Heavy Duty Frame and Cover
With Watertight Frame and Cover
04 FT ID
Dept (Vertical Separation of Top and Bottom)
Standard Manhole (Base, Top)
With Heavy Duty Frame and Cover
With Watertight Frame and Cover
05 FT ID
Dept (Vertical Separation of Top and Bottom)
Standard Manhole (Base, Top)
With Heavy Duty Frame and Cover
With Watertight Frame and Cover
06 FT ID
Dept (Vertical Separation of Top and Bottom)
Standard Manhole (Base, Top)
With Heavy Duty Frame and Cover
With Watertight Frame and Cover
07 FT ID
Dept (Vertical Separation of Top and Bottom)
Standard Manhole (Base, Top)
With Heavy Duty Frame and Cover
With Watertight Frame and Cover
08 FT ID
Dept (Vertical Separation of Top and Bottom)
Standard Manhole (Base, Top)
With Heavy Duty Frame and Cover
With Watertight Frame and Cover
09 FT ID
Dept (Vertical Separation of Top and Bottom)
Standard Manhole (Base, Top)
With Heavy Duty Frame and Cover
With Watertight Frame and Cover
10 FT ID
Dept (Vertical Separation of Top and Bottom)
Standard Manhole (Base, Top)
With Heavy Duty Frame and Cover
With Watertight Frame and Cover
Watertight frame and cover
Page 36 of 44
UNIT
$
$
125.38
100.30
CY
CY
$
$
156.73
125.38
CY
CY
$
$
$
17.55
30.09
3.13
LF
LF
LF
$
$
677.04
739.73
EA
EA
$
$
$
$
178.04
877.65
1,554.69
1,454.39
VF
EA
EA
EA
$
$
$
$
206.88
1,128.40
1,805.44
1,705.15
VF
EA
EA
EA
$
$
$
$
349.81
1,379.16
2,056.20
1,955.89
VF
EA
EA
EA
$
$
$
$
478.95
1,692.61
2,369.65
2,269.34
VF
EA
EA
EA
$
$
$
$
725.94
2,432.33
3,109.37
3,009.07
VF
EA
EA
EA
$
$
$
$
1,038.13
3,836.60
4,513.64
4,413.33
VF
EA
EA
EA
$
$
$
$
1,100.82
4,262.88
4,939.92
4,839.61
VF
EA
EA
EA
$
$
$
$
$
1,278.85
5,328.59
6,005.63
5,905.32
576.74
VF
EA
EA
EA
EA
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
WATER SYSTEM
NOTE: All unit prices include trenching, pipe, bedding, and backfill
Ductile Iron Pipe
Select Backfill
0'-5' Deep (3"-12" pipe)
0'-6' Deep (12"-24" pipe)
$
$
17.55
30.09
LF
LF
$
$
125.38
100.30
CY
CY
$
$
156.73
125.38
CY
CY
$
3.13
LF
$
$
$
$
$
$
$
$
$
$
$
60.56
65.75
90.27
101.56
115.35
137.92
164.25
183.05
219.42
288.37
374.89
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
LF
01" Service Connection (Incl Corp. Stop, Tubing, Meter)
$
672.03
EA
Casing pipe
Casing pipe, bore and jack (3/8" wall T)
16" ID
20" ID
22" ID
24" ID
30" ID
Fire Hydrant
Fire Hydrant Assembly (4) :with 20 LF 6" Dip
$
$
$
$
$
313.45
364.86
378.64
451.36
564.20
LF
LF
LF
LF
LF
$
4,463.48
EA
$
4,388.25
EA
Rock Excavation - in trenches:
Blast - All Pipes
less than 1,500 CY
greater than 1,500cy
Hoe ram - All Pipes
less than 1,500cy
greater than 1,500cy
Trench De-watering
Water Lines (1)
3" DIP, Class 52
4" DIP, Class 52
6" DIP, Class 52
8" DIP, Class 52
10" DIP, Class 52
12" DIP, Class 52
14" DIP, Class 51
16" DIP, Class 51
18" DIP, Class 51
20" DIP, Class 51
24" DIP, Class 51
Water System
MISCELLANEOUS
Jack Pit
Jack Pit
Page 37 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
Valve Assembly with valve box:
3" Ball
4" Gate
6" Gate
8" Gate
10" Gate
12" Gate
14" Butterfly
16" Butterfly
18" Butterfly
20" Butterfly
24" Butterfly
Wet Tap of "Live" Line - Grass Area
6" Tap
6" Tap In Street Patch
8" Tap
8: Tap In Street Patch
10" Tap
10" Tap In Street Patch
12" Tap
12" Tap in Street Patch
Page 38 of 44
UNIT
$
$
$
$
$
$
$
$
$
$
$
379.27
679.92
896.46
1,172.29
1,517.09
1,930.83
4,137.50
5,378.74
6,344.15
8,688.73
10,895.40
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
$
$
$
$
$
$
$
$
3,199.66
3,871.68
3,499.32
4,171.34
3,891.75
4,563.77
5,102.91
5,774.93
EA
EA
EA
EA
EA
EA
EA
EA
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
Street Construction
Roads and Parking
Bituminous Concrete, Base Course
BM-25.0A 10 Inch Thick
BM-25.0A 3 Inch Thick Per Square Yard and Less
BM-25.0A 3.5 Inch Thick
BM-25.0A 4 Inch Thick
BM-25.0A 4.5 Inch Thick
BM-25.0A 5 Inch Thick
BM-25.0A 5.5 Inch Thick
BM-25.0A 6 Inch Thick
BM-25.0A 6.5 Inch Thick
BM-25.0A 7 Inch Thick
BM-25.0A 7.5 Inch Thick
BM-25.0A 8 Inch Thick
BM-25.0A 8.5 Inch Thick
BM-25.0A 9 Inch Thick
BM-25.0A 9.5 Inch Thick
Bituminous Concrete Top Course
IM-19.0A, 2 Inch Thick Per Sq Yd and Less
IM-19.0A, 2.5 Inch Thick
IM-19.0A, 3 Inch Thick
IM-19.0A, 3.5 Inch Thick
IM-19.0A, 4 Inch Thick
IM-19.0A, 4.5 Inch Thick
IM-19.0A, 5 Inch Thick
IM-19.0A, 5.5 Inch Thick
IM-19.0A, 6 Inch Thick
SM (9.0A 9.5A 9.5D), 2 Inch Thick and Less
SM (9.0A 9.5A 9.5D), 2.5 Inch Thick
SM (9.0A 9.5A 9.5D), 3 Inch Thick
SM (9.0A 9.5A 9.5D), 3.5 Inch Thick
SM (9.0A 9.5A 9.5D), 4 Inch Thick
SM (9.0A 9.5A 9.5D), 4.5 Inch Thick
SM (9.0A 9.5A 9.5D), 5 Inch Thick
SM (9.0A 9.5A 9.5D), 5.5 Inch Thick
SM (9.0A 9.5A 9.5D), 6 Inch Thick
Coat
Prime Coat
Tack Coat
Concrete Curbing
Concrete Curb & Gutter CG6&7
Concrete Curbs CG2&CG3
Curb Cut, CG-12 with exposed aggregate
Street Intersection CG-10A
Concrete Pavement
Portland Cement, reinforced, 6" Gravel (Rebar #4, 12" OC/EW)
8"
9"
Portland Cement, WWF, 6" Gravel
7"
8"
9"
Page 39 of 44
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
56.80
22.57
25.01
27.45
29.91
32.35
34.79
37.24
39.68
42.13
44.58
47.02
49.46
51.92
54.36
SY
SY
SY
SY
SY
SY
SY
SY
SY
SY
SY
SY
SY
SY
SY
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
12.54
15.32
18.11
20.89
23.68
26.46
29.26
32.04
34.82
12.54
15.32
18.11
20.89
23.68
26.46
29.26
32.04
34.82
SY
SY
SY
SY
SY
SY
SY
SY
SY
SY
SY
SY
SY
SY
SY
SY
SY
SY
$
$
1.26
1.26
SY
SY
$
$
$
$
26.34
25.08
626.89
94.04
LF
LF
EA
SY
$
$
165.50
175.53
SY
SY
$
$
$
112.84
124.13
132.90
SY
SY
SY
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
Cover Material
No. 8
No. 68
No. 78
Driveway Restoration
2" S-5 6" Gravel
4" concrete over 4" gravel
Entrances/Driveways
Commercial, CG-11
Commercial, CG-13
Entrance, CG-9
Standard driveway, C&G/Sidewalk 4 transition DE-1
Standard driveway, no curb, D-5 (DE-5)
Guardrails
Median Barrier, MB-3 (L=6'-3")
Median Barrier, MB-3 (L=12'-6")
Standard blocked-out W beam strong post, GR2
Standard W beam, Weak Post GR8
Terminal, GR-6 (L=12'-6")
Terminal, GR-7 (L=6'-3")
Terminal, MB-4 (L=37'-6')
Type I, GR-8 Terminal (L=25')
Type I, MB-5 Terminal (L=27'-1")
Type II, GR-8 Terminal (L=13'-6")
Type II, MB-5 Terminal (L=13'-6")
$
$
$
3.26
3.11
2.96
SY
SY
SY
$
$
37.61
94.97
SY
SY
$
$
$
$
$
62.29
76.28
61.06
1,629.93
61.06
SY
SY
SY
EA
SY
$
$
$
$
$
$
$
$
$
$
$
329.75
545.40
50.15
32.60
3,447.91
3,134.46
4,137.50
1,629.93
3,447.91
787.37
1,880.68
EA
EA
LF
LF
EA
EA
EA
EA
EA
EA
EA
Miscellaneous
6" Pipe at Edge of Pavement
Complete CE-7 package
Final Street Acceptance Package
Initial Street Acceptance Package
Pipe stem from C&G, PS-1
Pipe stem from ditch, PS-1
Sign island
Slope erosion, Control MC-3A Straight
Street lighting, including pole, bracket and light
Street name signs
TB-1 Barricade
Traffic control signs
$
$
$
$
$
$
$
$
$
$
$
$
20.91
3,874.19
2,432.84
4,388.25
43.88
43.88
940.34
5.64
5,015.14
501.51
50.15
438.82
LF
LS
LS
LS
SY
SY
EA
LF
EA
EA
LF
EA
Shoulder Type I
Aggregate Base, 4"
$
12.54
SY
Soil Stabilization
Cement (6" depth) 6%
Lime (6" depth) 6%
$
$
18.81
12.54
SY
SY
$
$
11.29
13.80
SY
SY
$
3.77
SY
Subbase, Aggregate Material
Base, Type I, 6"
Base, Type I, 8"
Surface Treatment
Double Seal
Page 40 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
SIDEWALKS AND TRAILS
Sidewalk
4" Concrete, No Reinforcement and no Base
Concrete 4" - no reinforcement and no base
Bituminous concrete -2" with 4" base
Bituminous concrete -2" with 4" base
Concrete 4" - no reinforcement and no base
Concrete 4" with WWF and no base
Handrail 3 Rail 1-1/4" Finish
Handrail 3 rail 1-1/4" finish
Underdrains, Sidewalk (UD-3)
Underdrains, Sidewalk (UD-3)
Concrete yard steps with railings
4' wide, 3 steps
4' wide, 5 steps
Pedestrian bridge, prefabricated
Bridge abutments
4' wide
8' wide
Fair weather crossing
Steel frame with wood deck (PA-1)
4' wide
8' wide
Trails - INCLUDES excavation and grading
Bituminous concrete - Type I, TX-2
Up to 10' wide
Concrete trail with gravel base
Type IV, 4' - 6' Wide
Earth trail, Type VI, 6' Wide
Seal coat with 4" soil cement base
Type III, TX-2, 6' Wide
Stone dust with blue stone chip base
Type II, TX-2, 6' wide
Wood chip, 4' wide
Woodchip trail with gravel base
Type VII, 6'- 8' Wide
Page 41 of 44
$
48.47
SY
$
35.11
SY
$
52.66
SY
$
112.84
LF
$
19.11
LF
$
$
1,504.55
2,194.13
EA
EA
$
$
$
3,134.46
5,642.03
1,765.33
EA
EA
LF
$
$
752.27
1,128.40
LF
LF
$
57.67
SY
$
$
67.70
15.05
SY
SY
$
18.81
SY
$
$
15.67
20.56
SY
SY
$
18.81
SY
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
CRITICAL SLOPE STABILIZATION
EROSION CONTROL
Concrete slopes
Concrete slopes
$
$
8.78
112.84
SY
SY
Gabions
Grid pavers
Log cribbing
$
$
$
208.13
112.84
87.76
CY
SY
LF
Outlet Protection
Concrete 4"
Grouted rip rap , 18"
Non-grouted rip rap , 18"
$
$
$
56.43
75.23
60.18
SY
SY
SY
Paved Flume
Paved flume
$
78.99
SY
$
$
5.02
57.67
SY
SY
Stormwater channel excavation
Stormwater Channel Excav Grass Lined-Seeded
Stormwater Channel Grass Line Seeded Rip Rap 12", non grouted
Stormwater Channel Grass Line Seeded Rip Rap 18", non grouted
Stormwater Channel Grass Line Sodded
Stormwater Channel Grass Line Sodded Rip Rap 12", non grouted
Stormwater Channel Grass Line Sodded Rip Rap 18:, non grouted
Stormwater Channel Excav Rip Rap 12" non grouted
Stormwater Channel Excav Rip Rap 18" non grouted
$
$
$
$
$
$
$
$
$
8.78
15.06
65.23
75.24
21.32
71.47
81.50
58.93
68.96
SY
SY
SY
SY
SY
SY
SY
SY
SY
Structural Streambank Protection
Biologs with live stakes
Gabions
Grouted rip rap 18"
Non-grouted rip rap 18"
$
$
$
$
18.81
175.53
87.76
66.46
LF
CY
SY
SY
Vegetative Erosion Control
Jute mesh
Paper and nylon mesh
Plastic netting, 20 mil., 1" x 2" grid
Seeding includes fertilizing
Seeding with soil treatment and watering
Sodding includes fertilizing - banks
Sodding includes fertilizing - flat
Sodding with soil treatment and watering
Straw mulch with tack
$
$
$
$
$
$
$
$
$
2.01
1.88
1.32
2.51
3.77
8.78
6.27
7.52
1.57
SY
SY
SY
SY
SY
SY
SY
SY
SY
Deflectors
Rip Rap
Level Spreader
Rip rap 18", not grouted
Page 42 of 44
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
Temporary Erosion Control
Check Dam
Check dam - gravel
Gravel Construction Entrance
Gravel construction entrance, including wash rack
Sediment Basin Cut
Sediment basin cut
Sediment Basin Remove and Fill Upon Completion
Sediment basin remove and fill upon completion
Sediment Trap Basin
Sediment trap basin
Silt Fence
Silt fence
Storm Drain Inlet Control
Storm drain inlet control
Super Silt Fence
Super silt fence
Slope Retention Structures- NO mobilization included
Concrete encasement of H sect., 3000psi
Granular backfill
Pre-auger, 24" diameter to 30 feet, normal soil
Retaining Walls, concrete gravity, up to 6' HT, RW-2
Retaing Walls, concrete gravity, up to 6' HT, RW-3
Sheet piling
Soil stabilization fabric
Steel H section, 12 x 53
Whaler, 12"x12" prestressed concrete
Whaler, 12"x12" treated timber
Stream diversion
Cut and haul
Fill diversion and restore stream bank upon completion
Rip rap base/sides with filter cloth
Sand bag diversion in water
Slope sides
Temporary Riser Structure <10'HT: Install/Remove
Temporary Diversion Dike
Temporary diversion dike
Temporary Sediment Trap
Temporary sediment trap
Temporary Sediment Trap Gravel Outlet
Temporary sediment trap gravel outlet
Tree Protection Fencing
Tree Protection fencing
Temporary Riser
Temporary riser structure up to 10' tall - install and remove
Page 43 of 44
$
250.76
EA
$
3,134.46
EA
$
25.08
CY
$
31.35
CY
$
10.03
CY
$
5.02
LF
$
200.60
EA
$
12.54
LF
$
$
$
$
$
$
$
$
$
$
25.08
32.60
30.09
401.21
451.36
41.38
2.77
32.60
31.35
22.57
VLF
CY
VLF
LF
LF
SF
SY
VLF
LF
LF
$
$
$
$
$
31.35
25.08
25.08
150.45
3.77
CY
CY
SF
CY
SF
$
10.03
LF
$
9.41
CY
$
31.35
LF
$
10.03
LF
$
4,513.63
EA
COUNTY OF FAIRFAX, VIRGINIA
DEPARTMENT OF PUBLIC WORKS ENVIRONMENTAL SERVICES
LAND DEVELOPMENT SERVICES
2016 COMPREHENSIVE UNIT PRICE SCHEDULE
EFFECTIVE FEBRUARY 1, 2016
ENGLISH UNIT
PRICE
CATEGORY
UNIT
LOW IMPACT DEVELOPMENT (LID)
Bioretention
Bio retention basins - volume
Bio retention filters - volume
Constructed Wetlands
Includes trees, shrubs, grass (Not rebuild streams/wetlands)
Landscaping at bioretention filters/basins - See Landscape Section
Extended Detention Basin
Extended detention basin pipe inlet
Extended detention basin - interior volume (includes forebay volume)
Extended detention basin pipe outlet with rip rap
Extended detention basin rip rap channel
Extended detention basin riser structure
Manufactured BMP Systems
Manufactured BMP systems - hydrodynamics
Manufactured BMP systems - filtering
Overflow Spillway
Stabilized overflow spillway
Porous Pavement System
Asphalt with gravel base and perforated drains
Brick pavers with gravel base
Grass pavers with gravel base
Reforestation
Reforestation
Retention Basin
Basin pipe inlet
Interior volume (includes forebay volume)
Outlet with rip rap
Riser structure
Tree Box Filter
Tree box filter - with grate and frame 6'x6', without tree
Tree box filter - with grate and frame 8'X8', without tree
Tree in tree box filter
Tree Box Outfall
Tree box outfall 4" schedule 40 PVC with gravel backfill
Vegetated roofs with granular drainage and plantings
Aluminum Curbing for 6 inch depth
Aluminum Curbing for 12 inch depth
Extensive
Filter fabric
Gravel/concrete pavers forming vegetation-free strip
Intensive - 18 inches maximum
Irrigation to vegetated roof
Leak detection system
Thermal insulation
Vegetated swales
Check dams with filter fabric for vegetated swale
Complete swale includes: piping/underdrain, fill, filter fabric and media
Outlet protection with filter fabric for vegetated swale
Page 44 of 44
$
$
95.29
95.29
CY
CY
$
27.58
SY
$
$
$
$
$
1,880.68
32.60
4,012.12
45.14
438.82
EA
CY
EA
SY
VLF
$
$
75.23
110.33
CY
CY
$
313.45
SY
$
$
$
42.63
127.89
50.15
SY
SY
SY
$
56,420.35
AC
$
$
$
$
1,880.68
32.60
4,012.12
313.45
EA
CY
EA
VLF
$
$
$
2,194.13
3,259.84
814.96
EA
EA
EA
$
40.12
LF
$
$
$
$
$
$
$
$
$
10.03
12.54
225.68
1.57
15.05
338.52
3.77
2.51
3.77
LF
LF
SY
SF
SF
SY
SF
SF
SF
$
$
$
62.69
95.29
62.69
CY
CY
CY
Related documents