* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download China`s Ship Recycling Industry – Practices and Views
Low-carbon economy wikipedia , lookup
Climate governance wikipedia , lookup
Economics of global warming wikipedia , lookup
Climate change and agriculture wikipedia , lookup
Attribution of recent climate change wikipedia , lookup
Climate engineering wikipedia , lookup
Citizens' Climate Lobby wikipedia , lookup
Climate change in Tuvalu wikipedia , lookup
Climate change adaptation wikipedia , lookup
Media coverage of global warming wikipedia , lookup
Ministry of Environment (South Korea) wikipedia , lookup
Climate change in Canada wikipedia , lookup
Climate change in the United States wikipedia , lookup
Scientific opinion on climate change wikipedia , lookup
German Climate Action Plan 2050 wikipedia , lookup
IPCC Fourth Assessment Report wikipedia , lookup
Climate change, industry and society wikipedia , lookup
Solar radiation management wikipedia , lookup
Public opinion on global warming wikipedia , lookup
Surveys of scientists' views on climate change wikipedia , lookup
Effects of global warming on humans wikipedia , lookup
How Bangkok Port tackle with Climate Change 5/24/2017 1 Outlines Policy Statement Port Traffic management Activities concerned Green Area Cargo Handling National Policy 5/24/2017 2 National Policy Ministry of Natural Resources and Environment National Climate Change Policy Committee Thailand Greenhouse Gas Management Org. (Public ) Climate Change Management National Strategy Plan 2009-2012 5/24/2017 National Environmental Management Committee Office of Natural Resources and Environmental Policy and Planning Sustainable Management of Green Space in Urban Area 2007 3 Sustainable Management of Green Space in Urban Area, 2007 Public Awareness Local Government Capacity Building Economic Motivation Encourage Private Sector Revise concerned law and regulation Green Area for Government Sector 4 Climate Change Management National Strategy Plan 2009-2012 • Strategy 1 Increasing the capacity for adaptation and risk reduction • Strategy 2 Reduction of GHG emission/ increasing of absorption mechanism • Strategy 3 promoting research and development on consequence of climate change • Strategy 4 Public relation and supporting role on climate change problem solving • Strategy 5 Capacity building for institute and personnel concerned • Strategy 6 International cooperation 5/24/2017 5 Source of Emission from Port Activities • • • • Emission from vessel Emission from harbor ship Emission from cargo handling equipment Emission from cargo truck 5/24/2017 6 Measures undertaken • Cargo handling equipment standard EURO III • Increasing green area • Activities concerned promotion of environmental awareness • Port Traffic Management Plan • Review the Port Safety, Health and Environmental Policy Statement Cargo Handling Equipment Standard - EURO III Emission of CO2 from 2.72 g/kg to 0.64 g/kg PM from 0.14 g/kg to 0.05 g/kg Electric Folk lift Gantry Crane 5/24/2017 10 Increasing green area (Internal) • The Thai Government introduce a new policy concerned the environment. • Green space up to 30% of it’s total area. • Bangkok Port, as a state enterprise has adopted this policy by launching a 5 year project for increasing green space. พื้นที่ (1) พ • พื้นที่ (1) พื้นที่ (2) พื้นที่ (2) พื้นที่ (3) Increasing green area (External) • Mangrove Forest Bird Observation Tower Activities concerned Environmental Awareness • An exhibition “Love our World, Help tackle Climate Change” • Campaign to reduce car uses “Cycling to Protect our World” “Love our World, Help tackle Climate Change” “Cycling to Protect our World” Port Traffic Management Plan • Project under the project “Sustainable Port Development in the ASEAN Region” • Aims to assess the existing traffic situation • Prepare a streamlined emission inventory – Emission Reduction Plan • Work program for Port Traffic management Plan Activities covered by this project • Collection and analysis of existing information • Critical assessment of existing traffic management system • Identification and description of operation efficiency and performance problem • Preparation of streamlined emission inventory • Recommendations Recommendations • Short term – low cost measure • Medium term – significant change • Long term – major change Review the PSHE Policy Statement • Added a statement indicated that Bangkok Port is willing to improve the quality of air and best use of energy.