Survey
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
SOLID-STATE PROSTHETIC ARM A M U LT I D I S C I P L I N A RY C A P STO N E S E N I O R D E S IG N PRO J E C T W IT H T HE C O O PE R AT IO N OF MECHANICAL (MAE) AND ELECTRICAL (ECE) ENGINEERING DEPARTMENTS M A E 4 3 5 : M IDT E R M PR E S E N TAT IO N 2014 - 2015 Team: Michael DiGiacomo Peter Dinga Joseph Flores Taylor Jones Shelby Nedrick (Team Leader) Denzel Stewart (ECE) Advisor: Onur Bilgen PROJECT BREAKDOWN Structural Component Artificial Muscle Bundle Electronic Circuit Board 2 STRUCTURAL: DESIGN First Simple Joint Design First Prototype Second Iteration Test Swatches 3 STRUCTURAL: JOINT TESTING FAT IG U E T E ST S DEFLECTION TESTS PLA ST IC D E FO R M AT IO N 4 ARTIFICIAL MUSCLE: MUSCLE BUNDLE Muscle Mold Muscle Bundle Wire Configuration End Cap Layout Epoxy Silicone 5 ARTIFICIAL MUSCLE: CURRENT BUNDLE DATA Heating and Cooling Data Comparison 6 ELECTRONICS: CIRCUIT PROTOTYPE Current prototype • Permanent, smaller configuration • Utilizes pushbutton control • Optimizing layout to avoid shorting Power/ Ground SMA Wire Attachment N-Type MOSFET Switch Prototype Circuit 7 CONTROLS: PROPOSED INTEGRATION Controls and Artificial Muscle Incorporate C-DAQ with circuit Compact Data Acquisition System Allowing for PC control Operating circuit and collecting data Battery Circuit SMA Structure Integration and Manual Control PC Battery USB CDAQ Circuit SMA Structure Integration and Digital Control 8 9 GANTT BUDGET BREAKDOWN Subgroup Item Structural Design Rapid Prototyping Artificial Muscle Item Cost Shipping Purchase d Anticipated Order Total - - - Drill Bits 109.7 11.46 Yes 121.16 MOSFET 28.14 - Yes 28.14 Electronics & Controls Mini Pushbutton Switch 3.20 9 Yes 12.20 Team Supplies Presentation Board 7.99 - Yes 7.99 Total Spent 169.49 Budget Remaining 1830.51 10 SUMMARY • Items completed • Joint Swatch Testing • Muscle Molding Procedure • C-DAQ Integration • Currently in the process of • 3rd iteration of joint design • C-DAQ Integration Testing • Milestone Met • First Component Prototypes- End of the February • Budget Analysis • Under budget 11 QUESTIONS 12