Survey
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW ESA Dr. Chuck Carlson University of California - Berkeley THEMIS FM2/3 PSR and FM4/5 PER ESA-1 UCB, November 10, 2005 Outline • Summary of ESA Status at FM2/3 PSR and FM4/5 PER • Final Test and Cal Results vs. Requirement Fulfillment • PFRs • Open Items THEMIS FM2/3 PSR and FM4/5 PER ESA-2 UCB, November 10, 2005 ESA Status • Requirements and Design: – – • Procurement: – • No major changes to Requirements or Design since M-CDR No RFAs from previous reviews outstanding All procurement is complete. Assembly and Test: – – – – – – – – – 5 ESA mechanical assemblies complete 6 sets of High Voltage power supplies complete and tested 6 HV mother boards assembled and tested with HV supplies 12 anodes (6 sets) assembled and tested with MCPs 5 Preamp boards complete; 3 tested in complete units 5 HV Interface boards complete; 3 tested in complete units FM1-FM5 assembled FM1-FM2 calibrated 6 LVPS built and tested THEMIS FM2/3 PSR and FM4/5 PER ESA-3 UCB, November 10, 2005 ESA Requirements ESA Mission Requirements Fulfillment: • MRD fulfillment noted in THEMIS Verification Matrix (see MSE Presentation) • Integrated ESA and component parts compliant with mission requirements THEMIS FM2/3 PSR and FM4/5 PER ESA-4 UCB, November 10, 2005 Results of FM2 ESA Calibration • • • • • Energy/Angle response confirmed MCP Gain characteristics tested and successful MCP Noise – working on fixing low level noise issue Anode response tested and confirmed End-to-end performance has been verified THEMIS FM2/3 PSR and FM4/5 PER ESA-5 UCB, November 10, 2005 PFR Status • ESA PFR List: Description PFR013 ESA sweep board PFR063 FM2 ESA SMA Connector wiring problem PFR071 ESA Housekeeping Voltage Output Levels PFR075 ESA HV tripping on PCB during hot TV PFR084 ESA cover release mechanism nut plate design flaw PFR092 ESA Screw caused mechanical damage to LVPS PFR106 FM1 ESA Recal showed noisy channel PFR116 ESA not correctly initialized Assembly ESA ESA ESA IDPU ESA IDPU ESA ESA SubAssy Component Engineer SWP I/F Layout Carlson SMA Wiring Ludlam ESA INT HK Resistors Ludlam PCB 28V CL Chen Rel Plate Assy Micro-switch nut Carlson plate LVPS Resistor Taylor McFadden FSW Ludlam 1 2 - - X - X X X X - X O O X X 3 4 - - - X X X X - O O X X 5 6 - - - O X X X X - O O X X • All ESA PFRs have been Closed except PFR 071 (spare) and PFR 106 • PFR 106 – currently testing modified grounding scheme to eliminate noise pick-up THEMIS FM2/3 PSR and FM4/5 PER ESA-6 UCB, November 10, 2005 Open Items • ESA Calibration check still to be done • ESA calibration confirmation after Environmental Testing THEMIS FM2/3 PSR and FM4/5 PER ESA-7 UCB, November 10, 2005 ESA Back-Up THEMIS FM2/3 PSR and FM4/5 PER ESA-8 UCB, November 10, 2005 Back-up: EIDP Electrical THEMIS ESA (BINDER #25): • Includes THEMIS Coat and Stake Log, Mixing Records, Assembly Instructions, Schematics, Board Layouts, Repair/Rework Instructions, Inspection Reports, Bill of Materials and Magnetics Test Procedures (LVPS and HVPS only) for: •Mother Board •Sweep I/F Board •Pre-Amp Board •HVPS and HVNS Boards •LVPS Board (assembled and tested at SWRI) •Anodes THAN and TLAN THEMIS FM2/3 PSR and FM4/5 PER ESA-9 UCB, November 10, 2005 Back-up: EIDP Mechanical THEMIS ESA (BINDER #26): • List of Mechanical Assembly Procedures • Assembly Records • Assembly Report Sheet • Vibration Test Procedure and Report • Mechanical Drawing Tree • Master As-Built Mechanical Drawings THEMIS FM2/3 PSR and FM4/5 PER ESA-10 UCB, November 10, 2005