* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download POCPA2012
Survey
Document related concepts
Wireless power transfer wikipedia , lookup
Audio power wikipedia , lookup
Electric power system wikipedia , lookup
Electrification wikipedia , lookup
Mains electricity wikipedia , lookup
Power over Ethernet wikipedia , lookup
Solar micro-inverter wikipedia , lookup
Opto-isolator wikipedia , lookup
Alternating current wikipedia , lookup
Power engineering wikipedia , lookup
Amtrak's 25 Hz traction power system wikipedia , lookup
Buck converter wikipedia , lookup
Power electronics wikipedia , lookup
Pulse-width modulation wikipedia , lookup
Rectiverter wikipedia , lookup
Transcript
Commissioning & Status of ALBA Power Supplies Roberto Petrocelli POCPA 2012 ALBA overview and commissioning ALBA Power Converters Booster Power Converters Storage Ring Power Converters Tools for the day to day business Maintenance schedule Conclusions POCPA 2012 Synchrotron Light Source in Cerdanyola del Vallès (Barcelona, Spain) POCPA 2012 ALBA accelerators LINAC 100 Mev BOOSTER 100 MeV – 3 GeV STORAGE RING 3 GeV POCPA 2012 COMMISSIONING SCHEDULE Booster commissioning in parallel to SR installation SR commissioning (1st phase) Installation Insertion Devices: SCW and IVUs 2010 March-June 2011 Summer 2011 SR commissioning with all IDs restarted Sept 2011 Beam for beamlines commissioning Oct 2011 First external users May 2012 POCPA 2012 BOOSTER COMMISSIONING POCPA 2012 SR COMMISSIONING 16 March: Beam Accumulated 1.5 mA stored Acummulation Current SR Current Booster POCPA 2012 1st synchrotron light outside the tunnel POCPA 2012 Once the MPS (to protect the machine) was operational… POCPA 2012 LIGHT from APPLE-II UNDULATOR Beam Image at Fluorescent Screen on the FE • Screen @ 9.35m from source (middle of straight section) • Source APPLEII undulator EU62 • Stored current I=0.8mA Minimum gap (15.5mm): Horizontal mode (K=5.2) Circular mode (K=3.0) Vertical mode (K=3.7) POCPA 2012 EMITTANCE Emittance [nm·rad] Coupling Nominal Measured 4.3 4.7 <1% 0.50 % POCPA 2012 ORBIT STABILITY 1week data 1shift (8h) data SLOW ORBIT FEEDBACK RUNNING 0.3 Hz 88 BPMs 88 CORH & 88 CORV FAST ORBIT FEEDBACK UNDER DEVELOPMENT POCPA 2012 2012 In Operation Beam-Line Users since May 24 Hour operation 2 injections. Expected 2000 hours for Beam Lines and 1200 for Machine studies POCPA 2012 Magnet Power supplies at ALBA Distribution of Power Supplies in the Service Area POCPA 2012 Range of Magnet Power Supplies SR-PC-BEND BO-PC-BEND SR-PC-SEXT BO-PC-QUAD 800 LT-PC-CORR 600 (+/-2V-+/-2A) BO-PC-CORR 400 (+/-12V-+/-6A) 200 0 -1000 -200 output current -800 -600 -400 -400 -200 0 200 output voltage -600 400 600 800 1000 -800 POCPA 2012 BOOSTER PCs POCPA 2012 Major Incidences with main BO PS 15 date PS failure action 1 06.11.09 Bend 2 Buck module failure Sent to the factory for repair 2 15.12.09 Bend 2 Buck module failure Sent to the factory for repair 3 23.03.10 Bend 2 Buck module failure Sent to the factory for repair 4 21.06.10 Bend 2 Phase detector Repaired at ALBA 5 25.07.10 Bend 2 Buck and 2Q module failure Sent to the factory for repair A capacitor on PWM that controls the switching frequency could drift and produce a double pulse. It was replaced on all control boards 6 14.09.10 Bend 1 Auxiliary power supply Replaced 7 15.11.10 QV02 PWM board failure Repaired at ALBA 8 24.01.11 QS180 PWM board failure Repaired at ALBA 9 24.01.11 Bend 1 & 2 Auxiliary power supplies Replaced 10 27.04.11 Bend 1 2Q module failure Repaired at ALBA by Bruker 11 29.04.11 Bend 2 2Q module failure Repaired at ALBA by Bruker 3rd to 7th of May - Bruker slowed the start and stop procedures 12 16.05.11 QH02 Snubber resistor failure Repaired at ALBA 13 23.05.11 Bend 1 Buck module failure Sent to the factory for repair 14 20.04.12 Bend 1 2Q module failure failure Replaced by spare module POCPA 2012 Major Incidences with main BO PS Noise in Buck Module of BO_Bend_01 Buck input current POCPA 2012 SR PCs POCPA 2012 7 incidences with SR Quad (200A x15V). POCPA 2012 TOOLS FOR DAY TO DAY BUSINESS PS Logbook PS database TRAINING OF OPERATORS POCPA 2012 PS Logbook POCPA 2012 2012 MAINTENANCE SCHEDULE 5 WEEKS FOR MAINTENANCE ( distributed along the year) MAIN TASKS WE DO Connection Checks Rotate Spare Power Supplies Check calibration in Booster and SR Bendings. Perform annual test required by authorities ( CSN ) POCPA 2012 2012 MAINTENANCE Terminal not Crimped POCPA 2012 2012 MAINTENANCE Fan out of order POCPA 2012 STATISTICS Operation for users POCPA 2012 Next Steps Fast Orbit Feedback. Project of Power supplies for future upgrades. POCPA 2012 Conclusions It is not realistic to expect to find all the problems during FAT, SAT and commissioning. POCPA 2012 Thank You ! Questions ? POCPA 2012