Download What`s an Integrated Strategy?

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts
no text concepts found
Transcript
POST INSPECTION LETTER
REINFORCES THE INSPECTION AND ENCOURAGES COMPLIANCE
September 29, 2005
Maggie Theroux
617-918-1613
EPA
Page 1
New England
[email protected]
What is the Purpose?
• Reach every facility that we inspect
• Provide compliance and “beyond compliance”
info via the Attachment or the Region’s
"Solutions" web site
• Help facilities to improve their environmental
performance at a time when they have an
incentive to listen
• Maximize the environmental impact of our
inspections with .10 FTE
Please note: It is not a “close out” letter.
Page 2
What type of Information is included
in the Attachment?
• Access to web resources for:
– Compliance assistance
– Sector specific information
– Pollution prevention
– Energy efficiency
– Green buildings
– Environmentally-preferable purchasing
– Technology Connection
– Environmental Management Systems
– Recycling
– Enhanced security
Page 3
Page 4
EPA Internal Approval Process
• Text of letter & attachment reviewed
in FY’02 by:
– Region 1 Assistance & P2 manager &
staff
– Region 1 Enforcement management,
attorneys, & inspectors
– Regional Administrator
– OECA
Page 5
What is the Process?
• Enter the facility inspection data &
contact information into ICIS
• Create an ICIS report & eliminate
duplicates
• Review the list of facilities
Page 6
What is the Process?
• Use the report to create the Letters
which are signed by the A&P2 manager
• Send the Letter & Attachment to
recently inspected facilities
• Update the Attachment & web site
every 6 months
Page 7
Results
• Sent 432 letters since November, 2002
• Received 3,221 page requests on the
•
•
•
•
“Solutions” web site
Most popular information: P2, Compliance
Assistance, Sector Specific, & Recycling
Measurement survey – 8/03
Received OECA Best Practice Award – ’04
Now being considered by other Regions
Page 8
Measurement Survey – 8/03
• 7 out of 9 remember receiving the letter &
reviewing the attachment
• Some remembered visiting the web sites for
CA info & regulations, & Sector Specific
• 5 out of 9 knew they needed to make
improvements & 4 of these were already
making the changes
Page 9
Measurement Survey – 8/03
• Overall, the results emphasized the
importance of getting back in touch with
inspected facilities.
Page 10
Enforcement Issues Addressed
• Limiting use of Enforcement
resources
• Avoiding impression that we are
pressuring facilities into making
environmental improvements
• Complicating penalty negotiations
if companies argue that they are
owed reductions due to actions
taken
Page 11
How can it be used by the
States?
• Customize the Letter & Attachment
• Copy the "Solutions" web site
• Make sure your inspection data entry
system includes facility contact
information
• Add topics for specific sectors
– UST example – 1,689 page requests from
12/02-6/04
Page 12