* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Download PUB‐NLH‐262 Island Interconnected System Supply Issues and Power Outages Page 1 of 1 Q.
Survey
Document related concepts
Variable-frequency drive wikipedia , lookup
Audio power wikipedia , lookup
Electrification wikipedia , lookup
Utility frequency wikipedia , lookup
Power over Ethernet wikipedia , lookup
Electrical substation wikipedia , lookup
Electric power system wikipedia , lookup
Voltage optimisation wikipedia , lookup
Rectiverter wikipedia , lookup
Alternating current wikipedia , lookup
Power engineering wikipedia , lookup
History of electric power transmission wikipedia , lookup
Power electronics wikipedia , lookup
HVDC converter wikipedia , lookup
Switched-mode power supply wikipedia , lookup
Transcript
PUB‐NLH‐262 Island Interconnected System Supply Issues and Power Outages Page 1 of 1 1 Q. 2 Please explain in detail the impact of outages and trips of the Maritime Link on the security of the power supply on the Island Interconnected System. 3 4 5 A. Outages and trips on the Maritime Link (ML) with exports up to the 500 MW 6 capacity of the link will not have an impact on the security of the power supply to 7 customers on the Island Interconnected System. In the event of a pole or bipole trip 8 or power order runback (rapid reduction in delivered power) of the ML Voltage 9 Source Converter (VSC) due to system protection action, the Labrador‐Island Link 10 (LIL) Line Commutated Converter (LCC) will ramp back its power order (delivered 11 power to the Island) via a frequency controller to maintain frequency on the Island. 12 The ML converter system will utilize VSC technology allowing the Bottom Brook 13 converter station to maintain voltage control of the transmission system west of 14 Bay d’Espoir much like a Static VAR Compensator (SVC) in the event of the loss of 15 the dc circuit to Nova Scotia with the Bottom Brook converter in service. The loss of 16 up to 500 MW of export power through the western portion of the Island 17 Interconnected System due to a trip of the ML converter at Bottom Brook will result 18 in increased voltages in this area. The integration analysis completed for the ML 19 demonstrates acceptable performance for this event. A copy of the analysis is 20 attached to Hydro's response to PUB‐NLH‐264.