Download Slide 1

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Document related concepts
no text concepts found
Transcript
Olympic Delivery Authority
Biodiversity Action Plan
Introduction
Biodiversity
•
Minimise effects of
construction on the
environment
•
Provide suitable habitat
mitigation
•
Deliver new habitat and
species enhancements
•
Management and
maintenance of habitat
Managing ecology in construction
Detailed site surveys
Removal of invasive species
Translocation of species
Creation of off site habitats
Survey results 2010
Highlights
•
Black redstart in the vicinity
of the Main Press Centre (MPC)
•
Other sightings include a rare species of
pipistrelle bat (Nathusius pipistrelle) at
East Marsh.
•
Rare Biodiversity Action Plan invertebrate
species using the newly created habitat
(i.e. the grassland around the Main
Stadium and the log wall in Old Ford).
•
Significant progress with planting
of BAP habitat areas
Results
Bird species recorded
-First sightings include:
Black redstart (MPC)
Short eared owl (Basketball)
Kestrel (IBC)
Species recorded
Reptile
Grass snake
Bat survey results
4 species of bat, key foraging route East Marsh
Invertebrate results
2 BAP species fungus beetle and a flower beetle
Related documents