ResTech Energy Analysis For 34 Plaza Street East Brooklyn, New York 11238 sponsored by New York State Energy Research & Development Authority 17 Columbia Circle Albany, New York 12203 prepared by EME Group 159 West 25th Street New York, New York 10001 February 4, 2008 TABLE OF CONTENTS EXECUTIVE SUMMARY ................................................................................................ 1 ENERGY USE & COST HISTORY .................................................................................. 3 BUILDING DESCRIPTION .............................................................................................. 7 A) Architectural .............................................................................................................. 7 B) Mechanical................................................................................................................. 8 C) Electrical .................................................................................................................. 11 RECOMMENDATIONS.................................................................................................. 14 Operation & Maintenance Measures ............................................................................ 14 Energy Efficiency Measures ......................................................................................... 16 EEM #1– Install Condensing DHW Boiler .............................................................. 16 EEM #2 – Install Bi-level Lighting .......................................................................... 17 EEM #3 – Upgrade Common Area Lighting............................................................ 19 EEM #4 – Repair/Replace Failed Steam Traps ........................................................ 20 EEM #5 – Insulate Condensate Tank and Piping ..................................................... 21 EEM #6 – Install Occupancy Sensors....................................................................... 23 EEM #7 – Implement Advanced Metering............................................................... 24 MEASURES IDENTIFIED BUT NOT RECOMMENDED ........................................... 26 APPENDICES Appendix A: TREAT Output Appendix B: Funding Opportunities 34 Plaza Street East EXECUTIVE SUMMARY The Residential Technical Assistance Program (ResTech) is funded by the New York State Energy Research and Development Authority (NYSERDA) and provides technical assistance to residential buildings in an effort to improve the building’s energy efficiency and reduce operating costs. This report presents the findings of our comprehensive building energy assessment, which is focused on identifying cost-effective energy efficiency measures. This report has been completed for 34 Plaza Street East, a 111-unit cooperative apartment building located in the Prospect Heights section of Brooklyn. 34 Plaza Street uses electricity, natural gas, and no. 2 oil as its energy sources. Energy cost for the past year totaled $136,545, which represents a 3.4% decrease in total costs when compared to the year prior. Natural gas is used for space heating and domestic hot water generation. Gas use for the past year totaled 79,546 therms at a cost of $103,729, averaging $1.30 per therm. No. 2 oil is occasionally used for space heating, when outdoor temperatures drop below 20°F. Oil use for the past year totaled 2,502 gallons at a cost of $4,981, averaging $1.99 per gallon. Electric use for the past year totaled 157,974 kWh at a cost of $27,835, averaging $0.18 per kWh. Space heating is provided by a relatively new steam boiler with a dual fuel burner that predominantly uses natural gas. Domestic hot water is generated in an immersion coil in the heating boiler. Cooling is the responsibility of individual residents. Our study investigated cost-effective opportunities to reduce both electric and fuel oil usage. EME has identified a number of energy efficiency measures (EEMs) and operation & maintenance (O&M) procedures which, if implemented, would reduce energy and annual operating costs. In summary, we recommend upgrading common area lighting and controls, the installation of a summer hot water boiler, the installation of timers on bathroom exhaust fans, and the implementation of advanced metering. The analysis involved detailed field surveys, interviews with building operating personnel, and computer modeling. Computer model analysis was used to assist in calculating energy savings. We used NYSERDA-approved TREAT building modeling software V3.0.1.9 that uses the building envelope (exterior walls, windows and roof), electrical, lighting and mechanical systems (heating, cooling and domestic hot water), the building internal loads and operating schedules to calculate the estimated energy consumption of the building and proposed EEMs. NYSERDA▪ResTech Page 1 34 Plaza Street East The following table shows the recommended energy efficiency measures. Energy Efficiency Measure Install Condensing DHW Heater Install Bi-level Lighting Upgrade Common Area Lighting Replace/ Repair Steam Traps Insulate Condensate Tank and Piping Install Occupancy Sensor in Laundry Room Implement Advanced Metering Total Installed Cost $50,000 $15,463 $11,238 $8,250 $1,331 $200 $100,500 $186,982 Savings mmBtu 320 0 -6 227 14 0 555 kWh 0 8,017 10,874 0 0 1,130 20,020 kW 2.2 2.2 $ $4,414 $1,459 $1,890 $3,123 $199 $206 $24,902 $36,192 Payback (yrs) SIR 11.3 10.6 5.9 2.6 6.7 1.0 4.0 5.2 1.1 1.1 1.7 3.2 1.3 8.8 2.1 1.8 Notes: 1. Savings to Investment Ratio (SIR) is a standard economic tool used to evaluate energy and maintenance savings for energy efficiency measures. SIRs greater than 1 indicate that the measure will save the building energy and maintenance costs over the expected life of the measure based on a 3.0% discount rate. 2. The energy efficiency measures listed in the table above are based on an interactive whole building approach. 3. The individual measure life is based on ASHRAE’s determination of expected service lives. The identified EEMs can be funded through the NYSERDA Energy $mart Loan Fund, which provides interest rate reduction on loans for energy efficient projects and renewable technologies. The Energy $mart Loan Fund buys down the interest by 6.5% on loans for energy efficiency improvements and renewable technologies from participating lenders in Con Edison’s service territory. Loans can be used for prequalified measures, custom improvements and to help borrowers recoup their costs for technical assistance. Interest rate reductions are available for loans up to a maximum of $5,000 per dwelling unit or $600,000. NYSERDA▪ResTech Page 2 34 Plaza Street East ENERGY USE & COST HISTORY 34 Plaza Street uses #2 fuel oil, electricity and natural gas as its energy sources. Last year energy costs totaled $136,545. Number 2 fuel oil, provided by Amerada Hess, had total deliveries of 2,502 gallons at a total cost of $4,981. Electricity for common areas, provided by Con Edison, totaled 157,974 kWh at a total cost of $27,835 averaging $0.176 per kWh. Natural gas, provided by Con Edison, used for heating and hot water, totaled 79,546 therms at a total cost of $103,729, averaging $1.30 per therm. Converting the fuel oil consumption to units of Btus1 and normalizing for building gross area shows the building normalized heating index of 57,471 Btu/sq ft. Natural gas is the largest cost incurred by the building for energy use. However, when normalized to equivalent units of Btus, electricity costs $51.63/mmBtu, while natural gas costs $13.04/mmBtu. This shows that electricity is more nearly four times as expensive as natural gas per unit of energy. This is clearly illustrated in the two charts below. The left chart shows a breakdown of energy use, showing electricity using 6% of total energy. The right chart, a cost breakdown, shows that electricity accounts for 20% of costs. Energy Use by Fuel, 2006 - 2007 Total Use: 8,843 mmBtu Electricity 6% No. 2 Oil 4% Natural Gas 90% Energy Cost by Fuel, 2006 - 2007 Total Cost: $136,545 No. 2 Oil 4% Electricity 20% Natural Gas 76% Comparing utility consumption and costs for common areas from 2005 to 2007 reveals the following: Fuel #2 Oil (Gallons) Electricity (kWh) Natural Gas (Therms) Total 2005 Consumption Cost 4,500 $9,216 176,177 $32,850 67,748 $99,307 $141,373 2006 Consumption Cost 2,502 $4,981 157,974 $27,835 79,546 $103,729 $136,545 Difference Consumption Cost -44.4% -45.9% -10.3% -15.3% 17.4% 4.5% 10.5% -3.4% 1 1 kWh = 3,413 Btu 1 gallon #2 oil = 139,400 Btu 1 therm = 100,000 Btu NYSERDA▪ResTech Page 3 34 Plaza Street East The following tables illustrate the monthly energy consumption and costs of oil, electricity and natural gas for the past year. Natural Gas Space Heating and DHW Generation No. of Apartments: Building Area: Fuel Type: Fuel Heating Content: Heating Degree Days: Period From To 6/28/2007 7/30/2007 5/30/2007 6/28/2007 4/30/2007 5/30/2007 3/29/2007 4/30/2007 2/28/2007 3/29/2007 1/30/2007 2/28/2007 12/29/2006 1/30/2007 11/29/2006 12/29/2006 10/27/2006 11/29/2006 9/28/2006 10/27/2006 8/29/2006 9/28/2006 7/28/2006 8/29/2006 Total 120 153,860 ft2 Natural Gas 100,000 BTU/therm 4,460 HDD therms Cost mmBtu $/therm $/mmBtu 1,852 1,816 2,684 9,886 11,157 14,266 13,040 10,294 7,487 3,653 1,766 1,645 79,546 $2,710 $2,724 $3,916 $13,580 $15,253 $17,855 $16,019 $13,211 $9,869 $3,626 $2,523 $2,444 $103,729 185.20 181.60 268.40 988.60 1115.70 1426.60 1304.00 1029.40 748.70 365.30 176.60 164.50 7,955 185.2 181.6 268.4 988.6 1115.7 1426.6 1304 1029.4 748.7 365.3 176.6 164.5 $1.304 14.63 15.00 14.59 13.74 13.67 12.52 12.28 12.83 13.18 9.93 14.29 14.86 $13.04 $1.304 $13.04 663 66.3 $864 51,700 21,237 2,124 58,309 5,831 486 37,897 8.5 1,307,377 Average Fuel Cost: Average Consumption: Base Load Consumption: Heating Consumption: Normalized Heating Consumption: Normalized Heating Energy Factor: Heating Energy Factor: NYSERDA▪ResTech / therms / mmBtu therms / apt mmBtu/Apt. / Apt. Btu / Sq. Ft. therms mmBtu therms mmBtu therms / apt Btu / Sq. Ft. Btu/Sq.Ft./HDD Btu/ HDD Page 4 34 Plaza Street East Electricity Electric Usage No. of Apartments: 120 153,860 ft2 Electricity 3,413 BTU/kWh CDD Building Area: Fuel Type: Fuel Heating Content: Cooling Degree Days Period From 7/9/2007 6/7/2007 5/8/2007 4/9/2007 3/9/2007 2/7/2007 1/8/2007 12/7/2006 11/3/2006 10/5/2006 9/6/2006 8/7/2006 To 8/7/2007 7/9/2007 6/7/2007 5/8/2007 4/9/2007 3/9/2007 2/7/2007 1/8/2007 12/7/2006 11/3/2006 10/5/2006 9/6/2006 Total kWh kW Cost mmBtu $/kWh $/mmBtu 11,153 12,006 11,001 11,950 14,386 15,188 15,095 14,927 16,016 12,521 11,467 12,264 157,974 22 21 23 26 26 28 28 26 29 25 29 22 29 $2,259 $2,504 $2,218 $2,090 $2,574 $2,244 $2,577 $2,483 $2,369 $2,021 $2,283 $2,213 $27,835 38 41 38 41 49 52 52 51 55 43 39 42 539 $0.203 $0.209 $0.202 $0.175 $0.179 $0.148 $0.171 $0.166 $0.148 $0.161 $0.199 $0.180 $0.176 $59.34 $61.10 $59.07 $51.24 $52.43 $43.28 $50.03 $48.75 $43.34 $47.29 $58.33 $52.87 $51.63 $0.176 / kWh $51.63 / mmBtu 1,316 kWh / Apt $232 / Apt Average Electric Cost: Average Consumption: 1.03 kWh / ft2 NYSERDA▪ResTech Page 5 34 Plaza Street East No. 2 Oil Space Heating No. of Apartments: Building Area: Fuel Type: Fuel Heating Content: Heating Degree Days: Period From To 7/9/2007 8/7/2007 6/7/2007 7/9/2007 5/8/2007 6/7/2007 4/9/2007 5/8/2007 3/9/2007 4/9/2007 2/7/2007 3/9/2007 1/8/2007 2/7/2007 12/7/2006 1/8/2007 11/3/2006 12/7/2006 10/5/2006 11/3/2006 9/6/2006 10/5/2006 8/7/2006 9/6/2006 Total 120 153,860 ft2 #2 Fuel Oil 139,400 Btu / Gal 4,460 HDD Gallons Cost mmBtu $/gallon $/mmBtu 0 0 0 0 0 0 2,502 0 0 0 0 0 2,502 $0 $0 $0 $0 $0 $0 $4,981 $0 $0 $0 $0 $0 $4,981 0 0 0 0 0 0 349 0 0 0 0 0 349 $1.99 $1.99 $14.28 $14.28 $1.991 $14.28 21 2.9 $42 316 Average Fuel Cost: Average Consumption: NYSERDA▪ResTech / Gal / mmBtu Gals / Apt. mmBtu/Apt. /Apt. Btu / ft.2 Page 6 34 Plaza Street East BUILDING DESCRIPTION A) Architectural 34 Plaza Street is a residential cooperative apartment complex located in the Prospect Heights section of Brooklyn. The co-op is comprised 111 residential apartments and nine doctor’s offices. The building is twelve stories high, with two levels below grade at the entrance. The building is equipped with a below grade parking garage. Each residential floor contains ten apartments with the exception of the first floor, which contains one apartment and all nine doctor’s offices, as well as the building lobby. Apartments consist of a range of studio, one, two, and three bedroom units. The following shows a breakdown of apartments by type. • • • • Studio – 11 apartments One bedroom – 67 apartments Two bedroom – 25 apartments Three bedroom – 8 apartments Building fenestration consists of aluminum framed, double hung, double pane units that were installed between ten and fifteen years ago and appear to be in fair condition. The building is steel and concrete construction with brick façade. On each floor, two apartments contain terraces. The roof is built up membrane with gravel ballast. It was replaced approximately ten years ago. Building personnel was unsure if the roof was insulated. The roof is assessable to residents. The roof appears in good condition. Roof Lounge Area (gravel ballast can be seen in foreground) NYSERDA▪ResTech Page 7 34 Plaza Street East B) Mechanical Space Heating Apartments are heated by low-pressure steam (LPS) generated by an A.L. Eastmond model FST-250 steam boiler located in the boiler room in the basement. The boiler is equipped with an Industrial Combustion dual fuel gas/oil burner that is capable of burning either natural gas or number 2 oil. However, gas is the predominate source of heating energy. Natural gas is purchased based on a temperature-based interruptible rate. When the outdoor temperature falls below 20°F, the building is required to burn fuel oil. The boiler, manufactured in 1994, has a rated capacity of 10,500 MBH (1,000 Btu/hr). Steam Boiler Steam is distributed to apartment radiators through a variable vacuum (vari-vac) system. Vari-vac systems vary the pressure in the condensate return system by varying the vacuum at which the steam condenses. For example, a vacuum pressure of 25 inches mercury (“HG) corresponds to a steam temperature of 133ºF. Conversely, a vacuum pressure of 0 in Hg corresponds to a steam temperature of 212ºF. NYSERDA▪ResTech Page 8 34 Plaza Street East Vari-vac Pump Set The Vari-vac vacuum pressure is adjusted indirectly based on outside air temperature. Space heating is typically provided when the outside air temperature is below 55°F. A control panel monitors the heat balancer, which measures the rate of heat flow, and outdoor sensor to operate the system. The heating system was not operating at the time of our site visit. Heating System Controls Residents can regulate heating to the individual spaces by the use of installed shut-off valves on the radiators. Condensate returns to the boiler room and is collected in a 400 gallon condensate tank that is currently not insulated, after which it returns to the boiler by way of two condensate pumps. NYSERDA▪ResTech Page 9 34 Plaza Street East Typical Apartment Radiator Domestic Hot Water Domestic hot water is generated in an immersion coil in the heating boiler. Hot water leaving the boiler is then tempered with a mixing valve. The valve was set at 130°F at the time of our visit. A 1/12 horsepower circulating pump, manufactured by Bell and Gosset, maintains continuous flow through the system to ensure hot water is readily available at apartments. The current domestic hot water system does not use a storage tank. Small lengths of piping observed during our visit were lacking insulation. Mixing Valve Controls Piping Lacking Insulation Low-flow water fixtures were not present in apartments observed, as many residents opt to install custom fixtures. However, we would recommend that the co-op board advocate the installation of water conservation devices and the use of EnergyStar® appliances to conserve water and energy used to generate hot water. Ventilation Mechanical ventilation for bathrooms, kitchens, and common corridors is provided by 11 exhaust fans of various sizes located on the roof. The boiler room is ventilated by a through-the-wall exhaust fan that is automatically activated when the boiler is in NYSERDA▪ResTech Page 10 34 Plaza Street East operation. The parking garage is also mechanically ventilated by one exhaust fan on its roof, which is activated for one hour each day. The following table lists all exhaust fans in the building. C) Electrical Power Distribution Apartments are individually metered for electrical use. Residential units are supplied electricity under Con Edison rate EL-1 Residential. Common area in the building is supplied electricity under Con Edison rate EL-9 General Large. Elevators The building has two passenger elevators that serve all floors, including the two basement levels. The elevator machine room, which is located on the roof, houses the motors and controls. Both elevators have new 15 horsepower Reuland hoist motors and Tricon relay controls. All elevator equipment appeared to be functioning well and in good condition at the time of our visit. The following pictures illustrate a typical elevator motor and controls. Reuland Elevator Motor Tricon Elevator Controls Lighting Lighting throughout the building corridors is predominately 52-watt compact fluorescent fixtures containing two 26-watt plug-in compact fluorescent lamps (CFLs) each. All corridor fixtures are equipped with emergency batteries. Basement and mechanical space lighting consists of two, four, and eight foot long T12 fluorescent fixtures with magnetic NYSERDA▪ResTech Page 11 34 Plaza Street East ballasts. Each trash chute room contains one 7-watt screw-in CFL that is operated by a door switch, activating when the door is opened and deactivating when it closes. This provides for the most efficient operation possible, allowing the light to be on only when necessary. Both stairwells are equipped with one fixture containing two 13-watt plug-in CFLs per landing (two per floor). The parking garage is lit by one and two-lamp four foot fluorescent fixtures with T12 lamps and magnetic ballasts. Exterior lighting consists of a range of fixtures including plug-in CFLs, high pressure sodium and metal halide lamps, and incandescent MR16 lamps. All exterior lighting is activated by timers to operate only during nighttime hours. The following table lists all common area lighting in the building. Location Lobby Apartment Corridors Trash Cute Rooms Exterior Garden Inground Lighting Parking Garage Garage Corridor Staircase A Staircase B Basement Level Laundry Room Elevator Room Elevator Storage Room Boiler Room Type of Fixture Watts/Fixture PL13 2PL26 7W CFL Exit Sign 7W CFL 70W Metal Halide 2PL13 175W HPS PL13 PL13 MR16 F40T12 2F40T12 F20T12 2PL13 2PL13 2F32T12 2F20T12 F20T12 2F96T12 2F40T12 2F32T8 2F96T8 PL18 2F40T12 4F40T12 13 52 7 7 70 26 175 13 13 20 57 94 28 26 26 60 56 28 173 94 60 109 18 94 188 NYSERDA▪ResTech No. of Fixture 20 60 24 12 2 4 11 4 5 20 15 13 4 24 24 2 4 2 3 1 2 2 4 6 3 Total Wattage 260 3,120 168 84 140 104 1,925 52 65 400 855 1,222 112 624 624 120 224 56 519 94 120 218 72 564 564 Page 12 34 Plaza Street East Location Work Shop Gas Meter Room Electric Meter Room Ground Level Trash Room Bike Storage Room Type of Fixture Watts/Fixture 4F96T12 2F40T12 F20T12 75w incandescent 2PL13 2F40T12 2F40T12 F40T12 F40T12 346 94 26 75 13 94 94 57 57 No. of Fixture 2 3 2 1 3 3 1 2 2 290 Total Wattage 692 282 52 75 39 282 94 114 114 14,050 Appliances Residents are responsible for the purchase and maintenance of their own appliances. The building has a laundry room located in the basement. The laundry room is available 8:00 am to 11:00pm. Laundry equipment consists of four large Speed Queen commercial dryers rated at 144 mbh and two smaller Speed Queen commercial gas dryers rated at 64 mbh. The laundry room also contains six washing machines; four of them are front loading Wascomat model W60 washers and two are top loading Speed Queen commercial washers. An outside vendor, Coinmach Industries, owns and maintains all laundry equipment. NYSERDA▪ResTech Page 13 34 Plaza Street East RECOMMENDATIONS Operation & Maintenance Measures Very often, significant savings can result from making small changes in the way a facility is maintained. Such Operation & Maintenance (O&M) measures are usually low-cost or no cost. • • • • • • • • Repair leaks immediately. Any leaking faucet or valve should be repaired as soon as it is noticed. This will not only save water but will also prevent water damage to surrounding areas. Encourage the use of low-flow showerheads and faucet aerators. The use of low-flow fixtures not only reduces water consumption, but reduces energy required to generate domestic hot water. Encourage the use of low-flow toilets (1.6 gallons per flush). Low-flow toilets use more than 50% less water per flush than standard toilets (3.5 gallons per flush). Ensure that any future repairs made to hot water piping be reinsulated. Establish a boiler room log to monitor stack temperature, maintenance procedures and other operating procedures. Ensure test ports are available in boiler flue so that steady state efficiency (SSE) tests can be preformed quarterly. We recommend the boiler be cleaned and tuned when combustion efficiency drops below 80%. Building laundry rooms are not equipped with a range of equipment, some of which is energy star rated. Ensure that laundry vendor installs only EnergyStar® rated equipment in the future. Ensure that the garage is properly ventilated in accordance with building code. EnergyStar® appliances are the same or better than standard products, only they use less energy. To earn the EnergyStar® rating, they must meet strict energy efficiency criteria set by the United States Environmental Protection Agency (EPA) or the United States Department of Energy (DOE). Since they use less energy, these products realize energy cost savings and help protect the environment by causing fewer harmful emissions from power plants. A listing of manufacturers and models of EnergyStar® qualified products is available at http://www.energystar.gov. A listing of EnergyStar® retailers in New York State can be obtained from the New York Energy $mart website at http://www.getenergysmart.org. The apartment owners should be encouraged to use energy efficient compact fluorescent lighting fixtures and lamps. We recommend that EnergyStar® labeled products be considered when there is a need to purchase or replace appliances or household equipment. EnergyStar® products can reduce an apartment’s annual energy cost by 30%. Energy efficient refrigerators provide considerable savings since they operate 24 hours a day throughout the year. If space is appropriate a side mounted freezer with through the door ice refrigerator can save as much as $286. With current energy prices, having energy NYSERDA▪ResTech Page 14 34 Plaza Street East star appliances has never been a more worthwhile investment, payback periods of 1-2 years are the typical. The following table provides and example of the typical savings achieved thru the installation of an EnergyStar® appliance. In this case Energy Star® refrigerators are compared: Refrigerator Type Volume 3 (ft. ) Top Mount Freezer With Thru The Door Ice Top Mount Freezer without Thru The Door Ice Side Mount Freezer With Thru The Door Ice Side Mount Freezer without Thru The Door Ice 15 Energy Consumption (kWh/yr) NonEnergy EnergyStar Star Ref. Ref. 528 449 Energy Cost ($/yr) NonEnergy EnergyStar Star Ref. Ref. $116 $99 Savings 79 Energy Cost ($/yr) $17 Life Cycle Savings $226 Energy (kWh/yr) 18 565 481 $124 $106 84 $18 $240 23 623 529 $137 $116 94 $21 $269 15 442 375 $97 $83 67 $15 $192 18 477 406 $105 $89 71 $16 $203 23 532 452 $117 $99 80 $18 $229 15 577 490 $127 $108 87 $19 $249 18 613 521 $135 $115 92 $20 $263 23 670 570 $147 $125 100 $22 $286 15 590 502 $130 $110 88 $19 $252 18 608 517 $134 $114 91 $20 $260 23 636 541 $140 $119 95 $21 $272 NYSERDA▪ResTech Page 15 34 Plaza Street East Energy Efficiency Measures EEM #1– Install Condensing DHW Boiler Domestic hot water is generated by an immersion coil in the heating boiler. This system causes the large boiler to cycle on and off during the summer for a relatively small load. When a large boiler is operating under a partial load, efficiency is reduced. Comparatively, a separate boiler sized to hot water demands, operated during non-heating months, will operate with a much higher efficiency. We recommend the installation of a natural gas fired condensing hot water boiler for use during non-heating months. Condensing boilers use exhaust to preheat incoming water. This reduces heat lost through the stack, increasing overall efficiency. Condensing boilers can reach efficiencies up to 95%. This measure would entail the addition of a drain for condensed exhaust gas. In addition to an increase in efficiency for domestic hot water generation, this measure would allow the heating boiler to be completely shut down during summer months, significantly increasing its life span. This should also be considered when evaluating the cost and savings of this measure. Energy Savings The energy savings for this measure have been estimated using TREAT V3.0.19 building modeling software based on the abovementioned assumptions. Estimated Installed Cost: $50,000 Annual Energy Savings: 320 mmBtu Annual Cost Savings: $4,414 Simple Payback ($50,000 / $4,414/yr): 11.3 years Savings to Investment Ratio: 1.1 NYSERDA▪ResTech Page 16 34 Plaza Street East EEM #2 – Install Bi-level Lighting Stairwells and exits are required by the Building Code of the City of New York to be provided with illumination levels of at least 2 foot candles by artificial lighting continuously, during occupancy. However, this is a relatively low level of lighting and higher lighting levels are typically found. Therefore the periods when these spaces are not occupied represent an opportunity to reduce lighting levels and electric consumption while maintaining code requirements. NYSERDA, working with Lamar Lighting, developed a bi-level light fixture as an energy efficiency measure that incorporates occupancy-controlled lighting strategies using multilevel ballasts and ultrasonic sensors. The use of high/low levels, as opposed to on/off operation, has the advantage of prolonging lamp life if frequent cycling is expected. These fixtures combine all the necessary components including the lamps, ballasts and sensor into a single package that can replace the existing fixture on a one-to-one basis. The complete line of products including the Occu-smart bi-level line can be viewed at http://www.lamarlighting.com. Our replacement recommendations are based on maintaining the original design illumination levels. The majority of savings will be realized during the reduced periods of illumination. Please note that these are general recommendations that do not constitute a final lighting design. Prior to implementing this measure, ensure that the new lighting levels are appropriate for your facility and meet applicable code requirements. Stairwell lighting consists of 2PL13 fluorescent fixtures. We recommend replacing the existing fluorescent fixtures in the corridors with occupancy controlled bi-level 2PL13 fluorescent fixtures. These fixtures are equipped with bi-level ballasts and ultrasonic motion sensors, with 15-minute delay, that will maintain the fixtures at full load during high use periods and reduce power draw during low use periods. Energy Savings The energy savings for this measure have been estimated using the spreadsheet on the following page and based on the above stated assumptions. Estimated Installed Cost: $ 15,463 Annual Energy Savings: 8,017 kWh Annual Cost Savings: $ 1,459 Simple Pay Back ($ 15,463 / $ 1,459/year): 10.6 years Savings to Investment Ratio: 1.1 NYSERDA▪ResTech Page 17 34 Plaza Street East Common Area Lighting Upgrade: Cost of Electricity: 0.182 $/kWh Existing Fixture Location Staircase A Staircase B Fixt. Type Watts/ Fixt. # of Fixt. 2PL13 2PL13 26 26 24 24 34 Plaza Street Bi-Level Characteristics: Hi level on time: 8% Low level power: 20% Bi-level factor: Recommended BiHours/ Watts/ # of Fixture Type level? day Fixt. Fixt. (Y/N) 24 2PL13 Bi-level 26 24 Y 24 2PL13 Bi-level 26 24 Y Fixture Unit Costs: 2PL13 Bi-level Fixture w/ Emergency Battery: 2PL13 Bi-level Fixture: Cost includes materials, labor, and demolition. NYSERDA▪ResTech 27% Savings Hours/ day 6.4 6.4 $347 $297 Page 18 Fixt. Retr. Cost $347 $297 Demand Reduction Savings kWh/year Savings $/year Cost Pay Back 0.00 0.00 0.00 4,009 4,009 8,017 $730 $730 $1,459 $8,332 $7,132 $15,463 11.4 9.8 10.6 Savings to Investment Ratio (SIR): 1.13 34 Plaza Street East EEM #3 – Upgrade Common Area Lighting Common area lighting sometimes employs inefficient technologies such as incandescent lamps, standard fluorescent lamps, and magnetic ballasts. Incandescent lamps should be replaced, whenever possible, with compact fluorescent fixtures. Where existing lighting is already fluorescent, additional savings are sometimes achievable through the installation of low wattage lamps and/or electronic ballasts. Electronic ballasts regulate current through electronic circuitry rather than a magnetic core and cycle current 400 times faster than magnetic ballasts, which increases the light output of a fluorescent lamp. New lighting will also require less maintenance, as electronic ballasts have a longer life expectancy than their magnetic counterparts. This measure involves the replacement of T12 fixtures with magnetic ballasts in the following areas: • • • • • • • Boiler Room Laundry Room Basement Corridors Parking Garage Storage Rooms Workshop Compactor Room Energy Savings The energy savings for this measure have been estimated using TREAT V3.0.19 building modeling software based on the following assumptions. Existing Fixture 2F40T12 4F40T12 4F96T12 F96T12 F40T12 F20T12 Watts / Fixture 94 188 346 173 57 28 New Fixture 2F32T8 (25W) 4F32T8 4F96T8 F96T8 F32T8 (25W) F17T8 Watts / Fixture 60 120 218 109 30 18 Quantity 27 3 2 3 19 6 Cost / Fixture $189 $213 $302 $208 $176 $176 Estimated Installed Cost: $11,238 Annual Energy Savings: 10,874 kWh Annual Cost Savings: $1,890 Simple Payback ($11,238 / $1,890/yr): 5.9 Years Savings to Investment Ratio: 1.7 NYSERDA▪ResTech Page 19 34 Plaza Street East EEM #4 – Repair/Replace Failed Steam Traps Properly functioning steam traps are imperative for efficient, effective operation of any two-pipe steam heating system. There are a variety of steam trap designs, including thermostatic, float and thermostatic (F&T) and inverted bucket, which are intended for specific applications. Each radiator contains a thermostatic steam trap. The function of a steam trap is to contain steam within the supply side of the distribution system or radiator, separating it from the return or condensate piping. After the steam has given off enough heat to condense, the steam trap opens and allows the condensate to flow into the return system. Steam passing through into the return piping not only wastes energy but can cause condensate pumps to fail and other equipment problems. Steam traps require annual maintenance to assure they are functioning correctly. Therefore replacing steam traps is considered a necessary and on-going maintenance item. The energy savings for this measure are based on repairing or replacing 15% of the steam traps in the building. There is one steam trap on each apartment radiator as well as at the base of building risers that require testing and replacement if found to be leaking. Energy and Cost Savings The energy savings for this measure have been estimated based on the above stated assumptions using the spreadsheet on the following page. Estimated Installed Cost: $8,250 Annual Energy Savings: 227 mmBtu Annual Cost Savings: $3,123 Simple Payback ($8,250 / $3,123/yr): 2.6 Years Savings to Investment Ratio: 3.2 NYSERDA▪ResTech Page 20 34 Plaza Street East Pipe Diameter Trap Quantity Steam Pressure Trap Orifice Size Orifice Area (sq. in.) Discharge Coefficient Percent Failed Open Quantity Failed Open Blow-by Steam (lb/hr/trap) Type of Trap A B C E F=pi/4xE2 G H J=BXH K Note 1 Note 2 Thermostatic 0.5 345 15 0.25 0.0491 0.69 15% 52 % Time Trap Active Blow-by Steam (Mlb/yr) % Energy Loss Boiler Eff.(%) Fuel Savings (mmBtu/yr) Cost Savings ($/yr) N=(JxKxLxM) P Q R=(DxNxP)/Q/10^3 S=Rx$/mmBtu) Note 3 M Note 4 Note 5 Note 6 27.810 25% 1,079 15% 85% 216 $2,979 F&T 1 10 15 0.25 0.0491 0.69 15% 2 27.810 50% 63 25% 85% 2 $29 F&T 1.5 10 15 0.5 0.1963 0.69 15% 2 111.238 50% 250 25% 85% 8 $115 227 $3,123 Total NYSERDA▪ResTech Page 21 34 Plaza Street East EEM #5 – Insulate Condensate Tank and Piping The 400 gallon condensate tank in the boiler room is currently not insulated. This allows a significant amount of heat to escape into the room, which is then removed by the exhaust fan. The heat that leaves through the sides of the tank lowers the temperature of the condensate returning to the boiler, requiring the boiler to work harder to generate steam again. Insulating this tank will contain more heat and reduce heat lost to outdoors. In addition to the condensate tank, some domestic hot water piping observed was lacking insulation, resulting in heat loss in the boiler room before ever reaching faucets and showerheads. This also causes the boiler to work harder to deliver hot water, as a portion of the heat added is lost before the point of use. We recommend insulating the tank and piping with 1” thick fiberglass insulation. Also, building personnel should ensure that any repairs or modifications to heating equipment in the future include insulation. The following table shows the details of the measure. Description Length (L.F) Installation Cost 400 Gal. Condensate Tank 4" Domestic Hot Water Line Total 7.5 4 12 $1,294 $37 $1,331 Savings per Year mmBtu Cost 11.30 $156 3.14 $43 14.44 $199 Payback Years 8.31 0.86 6.69 Energy and Cost Savings The energy savings for this measure have been estimated using the table above base on the on the above stated assumptions. Estimated Installed Cost: $1,331 Annual Energy Savings: 14 mmBtu Annual Cost Savings: $199 Simple Payback ($1,331 / $199/yr): 6.7 Years Savings to Investment Ratio: 1.3 NYSERDA▪ResTech Page 22 34 Plaza Street East EEM #6 – Install Occupancy Sensors Many areas within a building require lighting intermittently throughout the day; yet have the potential for the lights to be left on most of the time, such as the central laundry room. In other instances, lights may be left on after the workday. These circumstances warrant occupancy based lighting controls. Most basement rooms are inaccessible unless opened by building personnel. Consequently we anticipate that these rooms will not be suitable candidates for occupancy sensors. There are three general types of occupancy controls: Passive infrared (PIR) that relies on line-of-sight coverage that senses the heat emitted by occupants in motion from that of the background space, Ultrasonic that uses the Doppler principle by emitting ultrasonic waves through the space to detect occupants, and Dual Technology that combines both PIR and ultrasonic technologies to detect occupancy. We recommend the installation of PIR sensors. Generally, ultrasonic sensors are best suited for spaces where the sensor has a clear line of sight of the occupants while infrared are used in spaces where there are obstacles. We do not recommend installation of occupancy sensors in mechanical/electrical equipment rooms, i.e., electric meter rooms and elevator machine rooms. All types of sensors can have adjustable dwell times where the lighting circuit is energized for a period of time after occupancy is no longer detected to limit frequent on-off operation. Energy Savings Estimated Installed Cost: $200 Estimated Annual Energy Savings: 1,130 kWh Estimated Annual Cost Savings: $206 Simple Payback: 1.0 Years Savings to Investment Ratio: 8.8 NYSERDA▪ResTech Page 23 34 Plaza Street East EEM #7 – Implement Advanced Metering The building is currently directly metered. In a direct metered building, residents each have their own utility meter and account, as does the building. In some cases, savings can result from switching to advanced metering, or master metering. In a master metered building, the utility supplies energy to the entire building, typically through one utilityowned meter and the building is responsible for the energy consumption costs incurred at the building. Common area electricity is provided under the Con Edison EL-9 General Large rate and apartment electricity is provided under the EL-1 Residential rate. This measure investigates the benefits of advanced metering on the main electric service. Con Edison’s residential rate is usually between $0.22 and $0.24 per kilowatt hour. The commercial rate, however, is usually between $0.16 and $0.18 per kilowatt hour. By purchasing all electricity through one “master” meter and then sending it to each apartment through “sub” meters, all electricity can be purchased at the commercial rate. The existing Con Edison meters would be replaced with building-owned meters that would be measured and maintained by a metering vendor. The metering vendor would measure and bill shareholders on a monthly basis. Savings from this measure would accrue directly to residents. Competitive pricing for utility bulk rates from Energy Service Companies (ESCOs) could also be negotiated; or the buildings would be able to participate in less expensive timesensitive pricing in order to reduce electricity costs. Energy cost savings for this measure was calculated using the Comprehensive Energy Management (CEM) tool on the following page. Description Qty Equipment cost House Meter Electrical/permitting cost 120 1 1 Unit Cost $650 $2,500 $20,000 Total Total Cost $78,000 $2,500 $20,000 $100,500 Estimated Installation Cost: $100,500 Estimated Annual Cost Savings: $24,902 Simple Payback ($100,500 / $24,902/yr): 4.0 years Savings to Investment Ratio: 2.1 NYSERDA▪ResTech Page 24 34 Plaza Street East 34 Plaza Street East Input Data Monthly Usage Monthly kW Number of Apartments Meter Reading Cost Per Apartment per Month Common Area load as percent of building load Total Monthly Apartment Usage Monthly Individual Apartment Usage Monthly Common Area Usage Apr-07 37,166 73.9 111 $3.00 32% 25,216 227 11,950 Taxes not included May-07 43,394 76.6 111 $3.00 33% 29,008 261 14,386 Jun-07 44,233 73.9 111 $3.00 34% 29,045 262 15,188 Jul-07 43,400 66.8 111 $3.00 35% 28,305 255 15,095 Aug-07 46,932 83.2 111 $3.00 32% 32,005 288 14,927 Sep-07 50,815 70.2 111 $3.00 32% 34,799 314 16,016 Oct-07 38,643 80.0 111 $3.00 32% 26,122 235 12,521 Nov-07 40,531 70.6 111 $3.00 28% 29,064 262 11,467 Dec-07 59,717 94.7 111 $3.00 21% 47,453 428 12,264 Jan-07 67,985 115.2 111 $3.00 16% 56,832 512 11,153 Feb-07 60,754 106.6 111 $3.00 20% 48,748 439 12,006 Mar-07 45,374 95.8 111 $3.00 24% 34,373 310 11,001 Submetering Total Cost with Submetering, SC8 $5,610 $6,745 $6,831 $7,344 $7,730 $8,658 $7,991 $8,923 $10,094 $13,313 $6,872 $6,573 Direct Metering Total Apt. Direct Metering, Cost SC1 Total Common Area Direct Metering Cost, SC2 Total Direct Metering Cost $5,240 $1,707 $6,947 $6,355 $2,448 $8,803 $6,257 $2,740 $8,998 $6,644 $2,893 $9,537 $6,993 $2,778 $9,771 $8,074 $3,220 $11,294 $6,844 $2,606 $9,450 $8,041 $2,441 $10,482 $10,263 $2,073 $12,336 $13,769 $2,191 $15,960 $8,197 $1,542 $9,739 $6,685 $1,583 $8,268 -$1,337 -$2,058 -$2,167 -$2,193 -$2,041 -$2,636 -$1,459 -$1,559 -$2,242 -$2,647 -$2,867 -$1,695 Results Submetering - Direct Metering Yearly Submetering Cost Yearly Direct Metering Cost Yearly Savings (Direct - Sub) $96,683 $121,585 $24,902 NYSERDA▪ResTech Page 25 34 Plaza Street East MEASURES IDENTIFIED BUT NOT RECOMMENDED Cogeneration This measure would investigate the feasibility of installing a packaged cogeneration system using a reciprocating IC engine to be interconnected and operate in parallel with the utility grid, recovering waste heat for hot water production. The hot water would be used to supplement heating and domestic hot water generation. Reciprocating gas engines are similar to automotive engines. The engines have proven to be a reliable technology and used in many cogeneration applications. Waste heat from the engine exhaust and jacket water cooling will be recovered for the generation of hot water through customized heat exchangers. The electricity generated can be fed into the building’s power grid, reducing the electricity provided by Con Edison. Cogeneration is economically feasible when there is a match between the thermal output of the cogeneration plant and the thermal requirement of the building. Multifamily buildings are a challenge to an economically viable use of cogeneration. This is because, in many cases, the building’s thermal base load, typically the DHW load is not sufficient to justify cogeneration. This is the case at 34 Plaza Street East. NYSERDA▪ResTech Page 26 34 Plaza Street East Exhaust Air Heat Recovery Ventilation is the introduction of fresh air for the purposes of diluting stale air. Natural ventilation consists of infiltration in and out of the building. Mechanical ventilation consists of the forced movement of air through supply or exhaust fans. Kitchen exhaust fans are required to operate at all times in order to maintain acceptable indoor air quality. These fans constantly expel conditioned air to the atmosphere. Implementing exhaust air heat recovery can recover energy that would otherwise be wasted. This measure investigates the feasibility of recovering waste heat from kitchen exhaust air to be used as a heat source to precondition outdoor air. The existing kitchen exhaust fans would be removed; existing curbs are capped and coupled to insulated ductwork that is ducted to the HRV. The HRV unit is equipped with heat transfer media, typical an enthalpy wheel, that exchanges heat between the exhaust and incoming air streams. This measure is not feasible because rigging and aggregating ductwork is cost prohibitive. NYSERDA▪ResTech Page 27 APPENDIX A TREAT OUTPUT BUILDING DESCRIPTION Project: 34 Plaza Street East For: 34 Plaza Owners Corp By: EME Group Date: 2/4/2008 General Project Information: Building Address: 34 Plaza Street East Brooklyn , NY 11238 Year Built: 1953 Number of Occupants: 207 House Type: Attached Contact Person: Gary Glabman Phone: 212-213-0123 Directions: General Building Information: Long term weather site: NEW_YORK_CITY NY Daily weather site: NEW_YORK_CITY NY Shielding Class: 3 - Moderate shielding: thick hedge or one neighboring house within 30ft Number of Stories: 12 Number of Units: 120 Wall Color: Medium Roof Color: Medium Total Heated Area: 127860 sq.ft Spaces in the Building Space Type Whole Building Space Name Building Ceiling Height (Ft) Floor Area (sq.ft) 8 127860 Page: 1 Eleva Conditioned Used Persons tion (either (Hours/ (ft) heated or Day) cooled) 0 Yes 16 207 Unheated Low ACH Basement Unheated Low ACH Parking Garage 8 16 16000 10000 0 0 No No 4 2 10 30 Exterior Walls/Floors/Ceilings/Roofs Space Name Construction Exposure Length Height (Ft) or width (Ft) South 104.50 120 Eleva Tilt Over tion hang (Ft) Depth (Ft) 0 90 NA Building 0.75" Plaster/Lath, 1" Air, 8" Block, 4" Brick, R-4 Building 0.75" Plaster/Lath, 1" Air, 8" Block, 4" Brick, R-4 West 137 120 0 90 NA Building 0.75" Plaster/Lath, 1" Air, 8" Block, 4" Brick, R-4 East 120 120 0 90 NA Building 0.75" Plaster/Lath, 1" Air, 8" Block, 4" Brick, R-4 North 107 120 0 90 NA Building Gyp Bd, 2x6 16" OC, 0.75" Wood, Slate, R-6 NA 10655 1 8 0 NA Walls/Ceilings/Floors Adjacent to Unheated Spaces Space Name Building Construction Length Height (Ft) (Ft) 0.5" Wood, 2x6 16" OC, 0.5" 10655 1 Fiberglass, 5" Air, Felt, R-6 Adjacent To Basement Elevation (Ft) 0 Walls/Floors Adjacent to Ground Space Name Construction Length (Ft) Width or Height (Ft) Type Parking Garage 8" Concrete, R-1 200 50 Slab-on-grade Basement Carpet w/Pad, 6" Concrete, R-3 10655 1 Slab below grade Basement 0.75" Plaster/Lath, 1" Air, 8" Block, 4" Brick, R-4 468.5 16 Wall Page: 2 Windows Glazing Frame Width Height Height Qty Ft Ft above floor 3.20 4.80 2.70 36 Location Exposure 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Operable Building North 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Operable 3.20 3.80 2.70 12 Building North 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Operable 2.80 4.80 2.70 168 Building North 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Fixed 4.60 4.80 2.70 12 Building North 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Fixed 3.80 4.80 2.70 12 Building North 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Fixed 3.80 4.80 2.70 24 Building South 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Operable 2.40 4.80 2.70 60 Building South 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Fixed 2.80 4.80 2.70 48 Building South 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Operable 2.50 6.90 2.70 24 Building South 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Operable 2.80 5 4.80 48 Building South 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Fixed 3.80 4.80 2.70 24 Building West 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Operable 2.40 4.80 2.70 48 Building West 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Operable 2.80 4.80 2.70 72 Building West 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Operable 3.20 4.80 2.70 60 Building West 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Operable 2.20 4.80 2.70 48 Building West 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Operable 3.10 4.80 2.70 24 Building West 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Fixed 3.80 4.80 2.70 24 Building East 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Operable 2.80 4.80 2.70 48 Building East Page: 3 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Operable 2.80 4.80 2.70 72 Building East 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Fixed 3.80 4.80 2.70 24 Building East 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Operable 2.40 4.80 2.70 36 Building East 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Operable 3.20 4.80 2.70 48 Building East 1/4" single acrylic, clear Aluminum w/o thermal break, Operable 2.20 4.80 2.70 72 Building East 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Operable 3.10 4.80 2.70 36 Building East 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Operable 3.20 4.80 2.70 36 Building East 3/4" double glass, 0.5" air space, clear Aluminum w/o thermal break, Operable 1.20 2.70 2.70 12 Building East 1/2" double glass, 0.25" argon space, e = Wood/vinyl, Fixed 3 5 2.70 1 Building East Infiltration Total Infiltration of Heated Area : ACH = 0.6 Infiltration of Unheated Spaces: Unheated Space Name Infiltration ACH Basement 0.2 Parking Garage 0.2 Page: 4 Central Heating System : Primary Heat Plant Boiler, Steam Natural gas 10500000 85 Basement 1994 Yes 210 190 209 15 50 Heat Plant Type Fuel Input capacity, Btu/Hr Annual Efficiency, % Location Year Is there Reset Control Design Supply Temperature, F Design Return Temperature, F Minimum Supply Temperature, F Design Outdoor Temperature, F Shutdown Outdoor Temperature, Primary Distribution Supply Return 0 0 2702.1 2702.1 Insulation R-Value Total Area of Piping, SqFt Percent of Total Pipe area in each space: Space Name Building Basement Parking Garage % Supply 46 50 4 % Return 46 50 4 Estimated total distribution efficiency: 86% Thermostats: Is Spaces Served by Heating Cooling Thermothe thermostat Is Temperature (F) Hours Is Temperature (F) Hours stat Area per Area per programOccuUnOccuUnHeatday Coolday mable pied occupied pied occupied ed unoccu- ed unoccuperiod Period period Period pied pied Yes Whole Building : Yes 68 60 8 No NA NA NA Building Page: 5 Mechanical Ventilation: Kitchen, Bathroom, and Apt. Ex Fan Name: Hours per Day Fan is On: 24 Heat Recovery Effectiveness: 0 Ventilation Rate: Space Name Building Total for the fan Ventilation Rate CFM ACH 9025 0.53 9025 0.53 Domestic Hot Water Hot Water Heater: Type Fuel Rated Volume, gallons Rated Input Capacity, Btu/Hr Design Supply Water Temperature, F Additional Insulation R- value Location Number of Identical Water Heaters Solar Fraction of Energy Input Year Thermal (Recovery) Efficiency, % Energy Factor (heating season) Energy Factor (non-heating season) Space-heating boiler w/tankless coil Natural gas 1 10500000 130 0.0 Basement 1 0.00 1994 88 0.8 0.68 Hot Water Demand: 1.00 No Usage Adjustment Multiplier Are Dishes Handwashed Fixture Details: Regular Shower Flow Rate, GPM Low-flow Shower Heads Max. Rated Flow, GPM Fraction of Showers with Low-flow Shower Heads Regular Faucet Flow Rate, GPM Low-flow Faucet Aerator Max. Rated Flow, GPM Fraction of Faucets with Low Flow Aerators Page: 6 3.40 2.50 0.15 3.40 2.20 0.15 Hot Water Piping: Total Piping Area, Sq.Ft Insulation R-value Recirculating System Recirculate When Water Temperature F Falls Below Hours per Day Recirculation is On Circulating Pump HP 1103 4 Yes 130 24.00 1/12 Percent of piping running through each space: Space Name % Piping 100 0 0 Basement Building Parking Garage Lighting Description Watts per Fixture 7W CFL Exit Sign 7 24 24 Building 2PL26 - Apartment Corridors 52 24 60 Building PL13 - Lobby 13 24 20 Building 7W CFL - Trash Cute Rooms 7 1 12 Building 70W Metal Halide - Exterior 70 12 2 Exterior lighting 2PL13 - Exterior 26 12 4 Exterior lighting 175W HPS - Exterior 175 12 11 Exterior lighting PL13 - Garden Lighting 13 12 5 Exterior lighting MR16 - Inground Lighting 20 12 20 Exterior lighting F40T12 - Parking Garage 57 24 15 Parking Garage Page: 7 Daily Count Hours On (Hr/Day) Location 2F10T12 - Parking Garage 94 24 13 Parking Garage F20T12 - Garage Corridor 28 24 4 Building 2Pl13 - Staircase A 13 24 24 Building 2PL13 - Staircase B 13 24 24 Building 2F32T12 - Basement Level 60 24 2 Basement 2F20T12 - Basement Level 56 24 4 Basement F20T12 - Basement Level 28 24 2 Basement 2F96T12 - Laundry Room 173 12 3 Basement 2F40T12 - Laundry Room 94 12 1 Basement 2F32T8 - Elevator Room 60 1 2 Building 2F96T8 - Elevator Room 109 1 2 Building PL18 - Elevator 18 24 4 Building 2F40T12 - Storage Room 94 1 6 Basement 4F40T12 - Boiler Room 188 4 3 Basement 4F96t12 - Boiler Room 346 4 2 Basement 2F40T12 - Work Shop 94 4 3 Basement F20T12 - Gas Meter Room 26 1 2 Basement 75W Incandescent - Gas Meter Room 75 1 1 Basement 2PL13 - Electric Meter Room 13 1 3 Basement 2F40T12 - Ground Level 94 24 3 Building Page: 8 2F40T12 - Compactor Room 94 4 1 Basement F40T12 - Compactor Room 57 4 2 Basement F40T12 - Bike Storage Room 57 1 2 Basement Appliances Appliance Name Electri- Electri- Second Annual Second Hot city city Fuel Second Fuel Water Usage, Demand (Not Fuel Units Usage (kWh/ Watts includ- Usage (gal/ year) ing Hot year) Water fuel) Location % Quan Heat tity Loss to Space Water Pumps 55703 8478 None NA NA 0 Basement 100 2 Sump Pumps 1857 1272 None NA NA 0 Basement 100 2 Conensate Pump 1347 424 None NA NA 0 Basement 100 1 Recircilation Pump 464 71 None NA NA 0 Basement 100 1 Fuel Oil Pump 182 682 None NA NA 0 Basement 100 1 Boiler Rm. Exh. Fan 1993 227 None NA NA 0 Basement 0 1 Building Exh. Fans 8967 0 None NA NA 0 Building 0 1 Parking Garage Exh. Fan 332 910 None NA NA 0 Parking Garage 0 1 Page: 9 MODEL ENERGY REPORT FOR BASE BUILDING 34 Plaza Street East For: 34 Plaza Owners Corp By: EME Group Date: 2/4/2008 Total Annual Energy Bill by Category Heating, $ 65,096 Hot Water, $ 25,337 Appliances, $ 23,370 Lighting, $ 14,480 Other, $ 99 51% 0% 11% 20% 18% Annual Heating/Cooling Bill by Category 33% Infiltration, $ 21,403 Window s, $ 14,876 Surfaces, Doors, $ 14,381 Mechanical Ventilation, $ 11,997 Ground, $ 2,439 23% 4% 18% 22% Note: Due to rounding, the sum of percentages may not be equal to 100. Page: 10 PERCENTAGE IMPROVEMENT REPORT Project Name: 34 Plaza Street East For: 34 Plaza Owners Corp By: EME Group Date: 2/4/2008 Package Name Annual Energy Use of All Fuels, MMBtu Percentage Base Building 7274.03 100.0 All Improvements 6923.07 95.2 Page: 11 IMPROVEMENT PACKAGES 34 Plaza Street East For: 34 Plaza Owners Corp By: EME Group Date: 2/4/2008 Evaluated Packages: Package Name All Improvements Cost $ 61,238 Annual Annual Payback Cashflow Savings, Savings, $ years $/year MMBtu 350.96 6,304 9.71 912 SIR 1.23 Package Description: 1. All Improvements Improvement Name Cost ($) Annual Annual PaybackCashflow Improve- SIR Savings Savings (years) ($/year) ment Life in MMBtu ($) (Years) Package Replace 4F40T12 630 0.60 49 13.0 -7 15 0.93 Install Gas DHW Heater 50,000 320.33 4,414 11.3 12 15 1.06 Replace F20T12 900 0.80 82 11.0 3 10 0.78 Replace 4F96T12 520 0.76 61 8.5 15 15 1.41 Replace 2F40T12 5,076 14.77 904 5.6 457 15 2.14 Replace F40T12 3,572 11.96 657 5.4 343 15 2.21 Replace 2F96T12 540 1.74 137 3.9 90 15 3.06 61,238 350.96 6,304 9.71 912 N/A 1.23 Total for Package Non-Energy Benefits: 1. Replace 4F40T12: Reduce maintenance, reduce replacement cost (fluorescent bulbs last 10,000 hours whereas incandescent bulbs typically last less than 1,000 hours). Page: 12 2. Install Gas DHW Heater: Increase value of building. 3. Replace F20T12: Reduce maintenance, reduce replacement cost (fluorescent bulbs last 10,000 hours whereas incandescent bulbs typically last less than 1,000 hours). 4. Replace 4F96T12: Reduce maintenance, reduce replacement cost (fluorescent bulbs last 10,000 hours whereas incandescent bulbs typically last less than 1,000 hours). 5. Replace 2F40T12: Reduce maintenance, reduce replacement cost (fluorescent bulbs last 10,000 hours whereas incandescent bulbs typically last less than 1,000 hours). 6. Replace F40T12: Reduce maintenance, reduce replacement cost (fluorescent bulbs last 10,000 hours whereas incandescent bulbs typically last less than 1,000 hours). 7. Replace 2F96T12: Reduce maintenance, reduce replacement cost (fluorescent bulbs last 10,000 hours whereas incandescent bulbs typically last less than 1,000 hours). Page: 13 APPENDIX B FUNDING OPPORTUNITIES The New York State Energy Research & Development Authority (NYSERDA) sponsors programs directed at improving energy efficiency, reducing environmental pollution, as well as research and development. We have identified the following programs that may be applicable: The NYSERDA Energy $mart Loan Fund provides an interest rate reduction on loans for energy efficiency improvement projects and renewable technologies. The Energy $mart Loan Fund currently buys down the interest by 6.5% on loans from participating lenders in Con Edison’s service territory. Loans can be used for pre-qualified measures and custom improvements and to help borrowers recoup their costs for technical assistance. Interest rate reductions are available for loans up to a maximum of $5,000. For example, if the building secures an 8% loan from one of the participating lenders, NYSERDA will pay 6.5% of the interest; therefore, the building’s effective interest rate would be 1.5%. The interest rate reduction is only available for the energy savings measures identified in this report. Following is a listing of the participating regional and local lenders that provide multifamily Energy $mart loans for the New York City metropolitan area: Amalgamated Bank 15 Union Square West New York NY 10003 PHONE: 800-332-2693 x8608 FAX: 212-462-3719 Contact: Mr. Leonard Maisel Title: Senior Vice President Website: www.amalgamatedbank.com e-mail: [email protected] Multifamily Apex Pryor Securities, a division of Rice Financial Products Company 17 State Street, 40th Floor New York NY 10004 PHONE: 212-908-9200 FAX: 212-908-9299 Contact: Mr. Michael Murray Title: Website: e-mail: [email protected] Banc of America Leasing & Capital, LLC 2059 Northlake Parkway Tucker GA 30084-5399 PHONE: 908-709-5462 FAX: 704-264-2554 Contact: Mr. James Thoma Title: Senior Vice President Website: www.bankofamerica.com e-mail: [email protected] Banc of America Leasing & Capital, LLC 25 N. Maple Avenue, 2nd Floor Ridgewood NJ 07450 PHONE: 201-493-2477 FAX: 704-264-2573 Contact: Ms. Lisa Douma Title: Operations Analyst Website: www.bankofamerica.com e-mail: [email protected] Bank of America 10 Fountain Plaza Buffalo NY 14202 PHONE: 716-847-4266 FAX: 716-847-4409 Contact: Ms. Barbara Maze Title: Website: e-mail: [email protected] Berkshire Bank PO Box 1308 Pittsfield MA 01202 PHONE: 413-236-3285 FAX: 413-528-2898 Contact: Mr. Richard Kelly Title: Website: www.berkshirebank.com e-mail: [email protected] Carver Federal Savings Bank 75 West 125th Street New York NY 10027 PHONE: 212-360-8887 FAX: 212-426-6155 Contact: Ms. Melissa Green Title: Vice President Commercial Lending Website: e-mail: [email protected] Commercial Chase Equipment Leasing, Inc 12 Corporate Woods Boulevard, Floor 104 Albany NY PHONE: 518-433-2518 FAX: 518-433-0295 Contact: Mr. Michael Moss Title: Website: e-mail: [email protected] Citibank NA 12203 450 Mamaroneck Avenue Harrison NY 10528 PHONE: 914-899-7721 FAX: 914-899-7132 Contact: Mr. Henry Auffarth Title: Senior Vice President Website: www.citibank.com e-mail: [email protected] Commercial Citicorp Leasing, Inc. 9201 4th Avenue Brooklyn NY 11209 PHONE: 718-748-4917 FAX: 718-567-9416 Contact: Ms. Concetta LoPresti-Mazzella Title: Website: e-mail: [email protected] Citimortgage Asset Management, Inc. 450 Mamaroneck Avenue Harrison NY 10528 PHONE: 914-899-7356 FAX: 914-899-7766 Contact: Ms. Diane Boday Title: Website: e-mail: [email protected] Commerce Commercial Leasing, LLC 2059 Springdale Road Cherry Hill NJ 08003 PHONE: 856-470-5213 FAX: 845-533-1022 Contact: Mr. Anthony Sasso Title: President Website: e-mail: [email protected] Community Capital Bank 111 Livingston Street, 4th Floor Brooklyn NY 11201 PHONE: 718-802-1212 FAX: 718-243-0312 Contact: Ms. Gina Bolden-Rivera Title: Senior Vice President Website: e-mail: [email protected] Credit, Inc. 555 Bergen Avenue, 3rd Floor Bronx NY 10455 PHONE: 718-732-7537 FAX: 718-292-4625 Contact: Mr. Richard Ross Title: President Website: e-mail: [email protected] Commercial First Niagara Bank 1 North Main Street Cortland NY 13045 PHONE: 607-758-2250 FAX: 607-758-2285 Contact: Ms. Julie Ryan Title: Website: www.fnfg.com e-mail: [email protected] Commercial HSBC Bank USA One HSBC Center Buffalo NY 14240 PHONE: 716-841-5743 FAX: 716-841-1058 Contact: Ms.Kristin Ruggiero Title: Website: e-mail: [email protected] Hudson Valley Bank 21 Scarsdale Road Yonkers NY 10707 PHONE: 914-768-6898 FAX: 914-768-6861 Contact: Mr. Michael Weisberg Title: Website: www.hudsonvalleybank.com e-mail: [email protected] Commercial Hudson Valley Bank Leasing Corp. 21 Scarsdale Road Yonkers NY 10707 PHONE: 914-768-6898 x21 FAX: 914-768-6861 Contact: Mr. Michael Weisberg Title: Website: www.hudsonvalleybank.com e-mail: [email protected] Commercial Independence Community Bank 195 Montague Street Brooklyn NY PHONE: 718-722-5604 FAX: 718-722-5688 Contact: Mr. Timothy Gannon Title: Sr. Vice President Website: e-mail: [email protected] Commercial 11201 Israel Discount Bank of New York 511 5th Avenue New York NY 10017 PHONE: 212-551-8155 FAX: 212-551-8717 Contact: Mr. Marc Cooper Title: Vice President Website: e-mail: [email protected] Commercial Jackson National Life Insurance Company 225 W. Wackes Drive, Suite 1200 Chicago IL 60606 PHONE: 312-634-2563 FAX: 312-634-0834 Contact: Mr. Mark Lyons Title: Website: e-mail: [email protected] Commercial Key Bank N.A. 50 Fountain Plaza, 16th Floor Buffalo NY 14202 PHONE: 716-847-7772 FAX: 716-847-2380 Contact: Ms. Sharon Lochocki Title: Senior Vice President Website: e-mail: [email protected] Commercial M&T Bank 465 Main Street LC-5 Buffalo NY 14203 PHONE: 716-848-4752 FAX: 716-848-4766 Contact: Mr. Adam T. Douglas Title: Product Manager Website: www.mandtbank.com e-mail: [email protected] Commercial M&T Credit Services, LLC 255 East Avenue Rochester NY 14604 PHONE: 585-258-8426 FAX: 585-258-8267 Contact: Mr. Christopher J. Oliver Title: Assistant Vice President Website: e-mail: [email protected] Capital Neighborhood Housing Services of NYC, Inc. 307 West 36th Street, 12th Floor New York NY 10018 PHONE: 212-519-2530 FAX: 212-727-8171 Contact: Mr. Gunnel Rydstrom Title: Website: www.nhsnyc.org e-mail: [email protected] New York Business Development Corporation 50 Beaver Street Albany NY 12207 PHONE: 518-463-2268 FAX: 518-463-0240 Contact: Mr. David Terrenzio Title: Senior Vice President Website: www.nybdc.com e-mail: [email protected] Commercial North Fork Bank 275 Broadhollow Road Melville NY 11747 PHONE: 631-844-1062 FAX: 631-844-9776 Contact: Mr. Peter J. Dumelle Title: Vice President Website: e-mail: [email protected] Commercial SunTrust Leasing Corporation 300 E. Joppa Road, Suite 700 Towson MD 21286 PHONE: 410-307-6661 FAX: 410-307-6620 Contact: Mr. Gary Jones Title: Vice President Website: e-mail: [email protected] The Community Preservation Corporation 28 East 28th Street New York NY 10016-7943 PHONE: 212-869-5300 x514 FAX: 212-683-0694 Contact: Mr. Jack Greene Title: Senior Vice President Website: e-mail: [email protected] If the co-op wishes to pursue some of the recommendations identified in the report, the Energy $mart Loan Fund is a means of low interest financing. The application process is outlined as follows: 1 Complete the Application along with your Lender’s standard loan application. 2 3 The Lender completes the Application and submits the following together in one package to NYSERDA for approval: ___ The Application; ___ Supporting technical documentation (provide cover page of NYSERDA Technical Audit performed); ___ Your lender’s commitment letter to you. Your Lender’s own loan application with credit and financial information should not be submitted to NYSERDA. Upon completion of the project, you must complete the Certificate of Project Completion, certifying to NYSERDA that the Eligible Improvements were installed as set forth in the Application. NYSERDA’s new Multifamily Performance Program addresses the needs o the multifamily sector and works to improve the energy efficiency, health, safety and security of residential buildings. The program has two components: New Construction and Existing Buildings. The Existing Buildings Component provides capital incentives to buildings that achieve a minimum 20% energy reduction based on NYSERDA’s Benchmarking Tool. The incentives available for market-rate housing are as follows: PAYMENT #1 Base Incentive (for small buildings up to 30 units) $2,500 / project Base Incentive (for small buildings 31 to 100 units) $5,000 / project Incremental Incentive $10 / unit over 100 units Incentive payable upon receipt of signed contract between the Participant and Partner and submission of a draft proposed Energy Reduction Plan, which must include documentation that the building has been benchmarked using the NYSERDA Benchmarking Tool. $300 / unit PAYMENT #2 Incentive payable at 50% construction completion, based upon a successful interim inspection. $300 / unit PAYMENT #3 Incentive payable at substantial completion, based upon a successful post-construction inspection and performance test (s) (as applicable). PAYMENT #4 Initial Benchmark Score Performance Target Per Unit $200 <= 25 points 20% $175 >=26, but <= 50 points 20% $150 >=51, but <= 75 points 20% $125 >75 points 20% For every 1% exceeding the Performance Target: $20 All benchmarking scores will be calculated using the NYSERDA Benchmarking Tool. Incentive payable only if the project achieves the Performance Target as specified above for the building’s initial benchmark score. Proof of energy savings will be determine by the Benchmarking Tool as an actual reduction in the building’s normalized source energy factor as determined by actual consumption data for the building. Such determination must made no sooner than one (1) year or later than 18 months following completion of the Energy Reduction Plan. ADVANCED METERING EQUIPMENT Resident Education and Regulatory Assistance $2,000 / project Advanced Submeter Installation $150 / unit Advanced Master Meter Installation $1,500 / unit Resident Education and Regulatory Assistance incentive is payable upon receipt of NY Public Service Commissioning (PSC) approval letter for Submeter installation and invoice for regulatory assistance and training service, including breakdown of number of training sessions and attendance. If training sessions are conducted by in-house staff, submit labor and materials cost along with training session details (# of sessions and attendance). Incentive will not exceed 100% of cost for services. Advanced Submeter and Master Meter incentives are payable upon receipt of metering contractor invoice for advanced meter installation. Advanced metering system must be functional and may be subject to inspection. See Energy Reduction Plan Guidelines for specifications of a qualified advanced submetering system. Incentives will not exceed 50% of the total metering installation cost. COMBINED HEAT AND POWER (CHP) SYSTEMS CHP System Installation $750 / kW CHP System incentive is payable per the terms and conditions of NYSERDA’s CHP Systems Manual BUILDING OPERATOR TRAINING & CERTIFICATION Building Operator Training & Certification $1,000 / attendee Training & Certification incentive is payable upon receipt of training completion certificate for each attendee, including training dates, location and instructor name. Incentive will not exceed 75% of the costs of Affordable Housing projects and 50% of the costs for Market Rate projects. PHOTOVOLTAIC (PV) SYSTEMS PV System up to 25 kW $4.00 / watt Building Integrated PV System up to 25 kW $4.50 / watt PV Systems between 26 – 50 kW $3.00 / watt over 25 kW Building Integrated PV System between 26 – 50 kW $3.50 / watt over 25 kW PV System incentives will be payable per the terms and conditions of NYSERDA’s New York Energy $mart Photovoltaic (PV) Incentive Program (50 kW and smaller) and are subject to change. Buildings that have participated in NYSERDA ResTech Program will be eligible to participate to the new Multifamily Performance Program.