Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
State of Florida Department of Correction – Florida State Prison Master Lift Station Replacement Raiford, Florida The electrical distribution system at the Florida State Prison Water/Wastewater Treatment Plants (W/WWTP), located at 7819 Northwest 228th street, Raiford, FL, originates from an incoming service owned and maintained by local power company through substations adjacent to the W/WWTP and the correctional facility. The incoming voltage is 13 kV and it is stepped down to a utilization voltage of 480 Volts, 3-phase, 3-wire. The utility transformer is located at the entrance to the W/WWTP entrance along NW 77th Avenue. A second step down transformer is located to the south of the existing master pump station. This transformer serves the Blowers located to the west of the digesters. The proposed master pump station will replace the existing pump station and as such the wall mounted gutter, combination starters, transformer and panels will be disconnected and removed. The space will be returned to the facility for use as storage. The new station will be located to the south of the existing station. It is our intent to utilize the existing feeder originating at the WWTP MCC which extends through a series of manholes. The feeder will be spliced in the manhole and extend to the proposed electrical system. Services Provided: Electrical Engineering Client Interface Coordination w/ OUC Estimated Cost: $150,000 – Electrical Only Completion Date: 03/13