Survey
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
Knocking The Rust Off The Rust Belt Calfee, Halter & Griswold LLP, The Calfee Building, 1405 East Sixth Street, Cleveland, Ohio 44114 Cleveland | Columbus | Cincinnati | Calfee.com Cleveland 1910-1920 Sixth-largest city in United States Natural Gas Fuels Boom A new energy source 1916: Construction Begins The Burnham Group Plan Includes City Hall, the Federal Courthouse, Public Auditorium, and the Board of Education building 1916-1959: East Ohio Gas Appliance showroom on lobby floor. Cashiers processed customer payments. 1960-1990s: WKY/WKYC 1960-1990s: WKY/WKYC The Mike Douglas Show was taped in a studio on the second floor in the mid1960s. 2009: Where We Started 2009: Parking Lot 2009: Ruined Plasterwork 2009: Atrium Ceiling 2009: Where We Started 2010: Work Begins 2010: Work Begins 2011: Details Restored 2011: A Vision Realized 120,000 square feet. Seven floors above ground. Three levels below ground. Calfee is the sole tenant. Partner’s Office Café Area This table was custommade by A Piece of Cleveland from reclaimed materials Environmentally Conscious Environmentally Conscious SUSTAINABLE SITES •SSc1 Site Selection; Heat Island Effect- Roof •SSc2 Developmental Density and Community Connectivity •SSc3.1 Alternative Transportation: Public Transportation Access •SSc3.2 Alternative Transportation: Bicycle Storage and Changing Rooms WATER EFFICIENCY •WEp1 Water Use Reduction 20% Reduction •WEc1 Water Use Reduction 30% Reduction ENERGY AND ATMOSPHERE •EAP1 Fundamental Commissioning •EAp2 Minimum Energy Performance •EAp3 Fundamental Refrigerant Management •EAc1.1 Optimize Energy PerformanceLighting Power •EAc1.2 Optimize Energy PerformanceLighting Controls •EAc1.3 Optimize Energy Performance- HVAC •EAc1.4 Optimize Energy PerformanceEquipment and Appliances •EAc2 Enhanced Commissioning •EAc6 Green Power Environmentally Conscious MATERIALS AND RESOURCES •MRp1 Storage and Collection of Recyclables INDOOR ENVIRONMENTAL QUALITY •IEQp1 Minimum Indoor Air Quality Performance •MRc1.1 Tenant Space- Long Term Commitment •IEQp2 Environmental Tobacco Smoke Control •MRc2 Construction Waste Management •IEQc1 Outdoor Air Delivery Monitoring •MRc4 Recycled Content •IEQc4.1- 4.4 Low Emitting Materials Adhesives and Sealants Paints and Coatings Flooring Systems Composite Wood and Agri-fiber •Mrc5 Regional Materials •IEQc6.1 Controllability of Systems- Lighting •IEQc6.2 Controllability of Systems- Thermal Comfort •IEQc7.1- 7.2 Thermal ComfortDesign; Verification Environmentally Conscious INNOVATION IN DESIGN •IDc1.1 Regional Materials •IDc1.2 Construction Waste Management •IDc2 LEED Accredited Professional Regional Priority •SSc2 Developmental Density •MRc2 Construction Waste Management75% Diversion •IEQc7.1 Thermal Comfort- Design Environmentally Conscious IN OCTOBER 2012, CALFEE WAS AWARDED GOLD CERTIFICATION UNDER LEED VERSION 3, COMMERCIAL INTERIORS. THE PROJECT EARNED 64 POINTS OVER 34 CREDITS. Environmentally Conscious METRICS AND THRESHOLDS MET •Water Savings: 31% Reduction through use of water conserving fixtures •Lighting Power: 21% Reduction of Connected Lighting Load Power •HVAC: Met and exceeded requirement of efficiency outlined in the Advanced Buildings Core Performance Guide sections 1.4, 2.9, & 3.10. •92% of all installed equipment is Energy Star Rated. •Purchase of 50% of the building’s power needs for the next two years from renewable sources. •Construction Waste: 98% Diversion Rate. •Achieved 17% recycled content threshold on all materials and furniture used on the project. •34% of all project materials and furniture on the project were manufactured and/or extracted within 500 miles of the site. Environmentally Conscious PROJECT TEAM Vocon Architect and Designer Karpinski Engineering Mechanical, Electrical and Plumbing Engineers CD+M Lighting Design Group Lighting Designer ITC/Predictive Services Inc. Commissioning Agent AM Higley Construction Manager Barber and Hoffmann Structural Engineer Vocon LEED Project Administrator Calfee Fitness Center The 1903 Market A 21st Century Law Firm High Tech Connections Calfee’s Conference Center is equipped to handle audio and visual conferences. Operating Costs Operating Costs Operating Costs Committed to Cleveland