Download draft rules of procedure iecee xxx this new rules of procedure have

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Test probe wikipedia , lookup

Resistive opto-isolator wikipedia , lookup

Switched-mode power supply wikipedia , lookup

Rectiverter wikipedia , lookup

Multimeter wikipedia , lookup

Surge protector wikipedia , lookup

Index of electronics articles wikipedia , lookup

Opto-isolator wikipedia , lookup

Automatic test equipment wikipedia , lookup

Transcript
IEC System for Conformity Testing and Certification
of Electrotechnical equipment and Components
TESTING AND MEASURING EQUIPMENT/ALLOWED SUBCONTRACTING
IEC 61439-3:2012, Edition 1.0
Low-voltage switchgear and controlgear assemblies –
Part 3: Distribution boards intended to be operated by ordinary persons (DBO)
PROVISIONAL
“R”
“S”
“SPTL”
“W”
“3PPS”
Required
May be subcontracted, see OD 2012
Specialized Facility, see IECEE 02-2
Witness testing in the categories “MED” and “MEAS”
Three Phase Power Supply required
Clause
10.2.2
10.2.3.1
10.2.3.2
10.2.4
10.2.5
10.2.6
Measurement/testing
Testing / measuring equipment / material needed
Resistance to corrosion
Climatic chamber according to IEC 60068-2-30 (damp heat cycling
test at +40 °C)
Test chamber according to IEC 60068-2-11 (salt mist at +45 °C)
Thermal stability
Climatic chamber according to IEC 60068-2-2 (dry heat test at
+70 °C)
Resistance to abnormal heat and fire due Glow-wire test apparatus according to IEC 60695-2-11
to internal electric effects
Resistance to ultra-violet (UV) radiation
Test chamber according to ISO 4892-2
Lifting
Crane or similar lifting equipment,
Weights
Mechanical Impact
Test apparatus (e.g. pendulum hammer, spring hammer or vertical
hammer) according to IEC 60068-2-75
June 2015 (Provisional)
1/4
Subcontracting
S
R
S
S
S
S
IEC 61439-3, ed 1
IEC System for Conformity Testing and Certification
of Electrotechnical equipment and Components
Clause
10.2.7
10.3
10.4
10.4
10.5.2
10.5.3
10.9.2
10.9.3
10.10
Measurement/testing
Testing / measuring equipment / material needed
Marking
Cloth,
Water,
Petroleum spirit
Degree of protection of enclosures
Sphere 50 mm diameter,
Jointed test finger,
Test rod 2,5 mm diameter,
Test wire 1,0 mm diameter,
Sphere 12,5 mm diameter
Dust chamber,
Drip box.
Drip box 15°,
Oscillating tube/spray ± 60° or spray nozzle/spray ± 60°,
Oscillating tube/spray ± 180°,
Water jet hose nozzle - nozzle 6,3 mm diameter,
Water jet hose nozzle - nozzle 12,5 mm diameter,
Immersion tank
Clearances
Sliding gauge
Creepage distances
Sliding gauge
Effective earth continuity between the Resistance measuring instrument with a driving current of at least
exposed conductive parts of the assembly 10 A (a.c. or d.c.).
and the protective circuit
Short-circuit withstand strength of the Short-circuit withstand testing up to 10kA (testing with OCPDs)
protective circuit
Measuring devices for voltage, current, cos φ, time, I²t-values
Short time withstand testing in general and short circuit withstand
testing above 10kA (testing with OCPDs)
Power-frequency withstand voltage
AC High-voltage source (0 - min. 3,5 kV),
Voltmeter (min. 3,5 kV)
Impulse withstand voltage
Impulse voltage generator (1,2/50 μs),
Oscilloscope,
High voltage probe
Verification of temperature rise
Load resistors,
Temperature acquisition unit,
Current/voltage source
June 2015 (Provisional)
2/4
Subcontracting
R
R
S
R
R
R
R
S
R
R
R
IEC 61439-3, ed 1
IEC System for Conformity Testing and Certification
of Electrotechnical equipment and Components
Clause
Measurement/testing
10.11
Short-circuit withstand strength
10.12
EMC – Immunity
Electrostatic discharge immunity test
Testing / measuring equipment / material needed
Subcontracting
Short-circuit withstand testing up to 10kA (testing with OCPDs)
Measuring devices for voltage, current, cos φ, time, I²t-values
Short time withstand testing in general and short circuit withstand
testing above 10kA (testing with OCPDs)
R
3PPS
S
S
ESD generator,
VCP,
HCP,
reference ground plane
Radiated radio-frequency electromagnetic Signal generator,
field immunity test
RF power amplifier,
Function generator,
Biconical antenna and logperiodic antenna or Bilog antenna,
Horn antenna,
Millivoltmeter (or Power Meter with Power Sensor),
Isotropic Field Probe,
Directional coupler,
Semi-Anechoic chamber,
Controller (PC)
Electrical fast transient/burst immunity test Burst Generator,
Coupling/Decoupling Network,
Capacitive Clamp,
33 nF capacitor for direct injection,
reference ground plane
Surge immunity test
Surge Generator,
Coupling/Decoupling Network,
reference ground plane
June 2015 (Provisional)
3/4
IEC 61439-3, ed 1
IEC System for Conformity Testing and Certification
of Electrotechnical equipment and Components
Clause
Measurement/testing
Testing / measuring equipment / material needed
Conducted radio-frequency immunity test
10.12
10.13
Signal generator,
RF power amplifier,
Coupling/decoupling continuous network,
Attenuator,
Power meter with Power Sensor,
EM clamp,
Ferrite decoupling network,
Sinusoidal generator,
Current clamp, 100 Ω to 50 Ω adaptor and direct iniection device
Immunity to power-frequency magnetic Test Generator,
fields
Square Coil,
Magnetic
Field Tester,
Helmholz Coil,
Magnetic Field
Probe
Immunity to voltage dips and interruptions Test generator,
oscilloscope
EMC - Emission
Radiated disturbances
Biconical Antenna and logperiodic antenna or Bilog antenna,
Test Receiver or Spectrum analyzer + Preselector + QP adapter,
Semi- anechoic chamber,
Open area test site
Mechanical operation
None
Subcontracting
June 2015 (Provisional)
4/4
S
---
IEC 61439-3, ed 1