Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Quote template for registered electrical contractors 1. Fill in this quote template, ensuring that all sections are completed, including the drawings. Refer to the ‘Assessment methodology’ document for information on how the department assesses quotes (available on our website). 2. If you have not registered for the PRF program you will need to complete and submit a ‘Supplier Application Form’. Please email [email protected] or visit www.energyandresources.vic.gov.au/powerlines. 3. Send all completed quotes directly to DELWP to: Email (preferred): [email protected] Post: Powerline Replacement Fund GPO Box 4509, Melbourne Vic 3001 When submitting quotes please note the following: You will be required to manage and include in your quote all costs and activities associated with the undergrounding works (including those being performed by third parties) including; Pit installation and truck appointments with the power companies (these may be waived however this would need to be checked with the relevant power company) Any meter alteration fees Trenching and cabling Removal of poles and all waste material (including rocks) Site remediation to ensure that the property is undamaged and is, as far as practicable, in the same state it was prior to the works being carried out. The government funding will only cover a ‘like for like’ replacement. That is, the current capacity of the overhead will be replaced with the same capacity. POEL owners wishing to upgrade their capacity are free to do so, but are responsible for meeting the additional cost. Pre-existing issues, such as faulty meters and household wiring are also not covered. DOC/15/265030 1. Please provide your details: Date of site visit: Date of quote: Your reference (quote number): Contact Name: Company name: Contact phone: Email: REC number: Invoice and payment information. Should you be successfully awarded these works, the invoice must be made out to DELWP, not the customer. Payment terms will be 30 days after the date of your invoice and submission of a copy of the Certificate of Electrical Safety and completed voucher. 2. Please provide customer (POEL owner) details: Name: POEL Address: Owners contact number: Page | 2 3. Works required: a. Existing private electric lines (includingexistingunderground cables): Service Point (with description such as house, shed etc) Length of route (metres) Phases *Bare wire (pls circle)? (Yes / No – or existing underground cable) 1: yes / no / UG 2: yes / no / UG 3: yes / no / UG 4: yes / no / UG 5: yes / no / UG TOTAL Existing amps per service point n/a *To be eligible for funding the POEL MUST have a span (or part there-of) that is bare-wire. A fully insulated POEL is NOT eligible for funding. *The PRF will only fund replacement of POELs to the existing amperage per service point. The cost of any upgrades to this are to be met by the POEL owner. Is this POEL a sub-circuit (in its entirety)? yes / no (circle one) (If Yes, please provide details): b. Removal of materials: All cabling, cross arms, rocks and other waste material must be removed from the property. □ Are any poles required to remain in place? Yes / No. If yes, please select the reason and number of poles remaining. Unless there is a reason, all poles must also be removed. □ □ □ Number of poles being removed (and associated cables) Owner preference □ *Telephone or data cables Other. Please state_______________________________ Number of poles remaining *The department will not cover the costs for undergrounding or relocating telephone or data cable. These costs are to be borne by the POEL owner. Page | 3 c. New underground arrangements (including existing underground cables to be retained): Service Point (with description) Length of new route (metres) *Retain existing UG? Phases CU or AL Y/N/ not applic. Conductor size (mm2) Conduit size (mm2 if used) Amps delivered to service point Voltage drop (%) ^Phase used for VD calc. 1: 2: 3: 4: 5: TOTAL *Calculate voltage drop for any existing underground circuit if it is to be retained (ie not replaced). ^If using 2 phase calculation - is the load sufficiently balanced? Yes/No Attach copies of all VD calculations where possible. The PRF only funds ‘like for like’ replacement. It does not include improving undersized services. Do not include the replacement of existing underground services unless required by regulation or the Service and Installation Rules (SIRs). Is the transformer on the property? Yes / No Are you proposing to replace an existing underground cable? Yes / No. If yes, please provide an explanation referencing regulations or the SIRs. Have you confirmed the capacity of the transformer that will be connected to the new underground supply (including shared capacity if it supplies other customers). Yes / No / Not Applicable Page | 4 It is highly recommended you confirm transformer capacity even if you are replacing a service with the same current requirements in case the transformer is overloaded. d. Other new assets proposed for installation: Asset description Reason required a. Please list third party contractors: Contractor Name/Details Excavator/Trencher: Equipment hire: Inspector: Other: b. Anything else: Is there any other relevant information that needs to be considered as part of this quote? For example is there any component of the existing installation which is non-compliant with current legal and regulatory requirements AND which will need to be replaced in the course of completing the works? Page | 5 4. Statement of costs: Item Labour: Materials: Removal of waste material (poles and cables) Excavation, backfilling and site remediation (make sure you discuss all Mandatory (these must be included in your quote) Amount (ex GST) □ □ □ □ remediation works with the customer and this quote covers that cost – you will be responsible for all remediation whether or not included in the quote): Distribution business costs. This quote must include any pit or truck reconnection costs. (Please check with the □ appropriate DB as these costs may sometimes be waived for POEL replacement jobs.) Licenced electrical inspector and CoES costs: Other costs: □ □ Energy Safe Victoria inspection* (only if seeking exemption to undergrounding – refer below) Subtotal: GST: TOTAL COST: *Insulating the Overhead Service Please ensure you have considered replacing the POEL with an overhead insulated service (to be authorised by ESV) where there is excessive rock. You can make your quote conditional upon obtaining that authorisation. The fee charged by Energy Safe Victoria (ESV) should be included in your quote. Upon awarding of the works a Conditional Offer will be issued allowing you to engage with ESV to seek the exemption. If an exemption is not granted, the Conditional offer will be withdrawn, you will be refunded the ESV amount and should then submit a quote for undergrounding the POEL. Do not incur any additional liability until the exemption has been confirmed by ESV (for example ordering materials) as the department will only refund the ESV amount. Page | 6 5. Drawings Please include sketches showing location of existing and proposed location of new works (including any existing underground cables) For the existing service: Please indicate which spans are bare-wire and those which are insulated. Page | 7