Solution Idea Submittal Form
MISO Top-Down Planning Process
Section I: Solution Idea Details
I.
General Solution Information
(this section is required for all solution ideas)
Submission Date:
Click here to enter a date.
Proposed In-Service Date:
Click here to enter the proposed In-Service Date.
Issue(s) addressed by proposed solution idea1:
List identified issue(s) that the solution idea addresses.
Overview description of solution idea:
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
___________________________________________________________________________________________________________
Estimated cost of solution idea2:
Click here to enter estimated cost
Provide diagrams and modeling for proposed solution idea:
☐ One-line diagrams attached
☐ Powerflow modeling (in PSS©E) attached
☐ Geographical diagram (e.g. GIS map)
Legal name of organization submitting proposed solution:
Click here to enter organization’s legal name.
MISO Qualified Transmission Developer status3:
☐ Certified Qualified Transmission Developer3
☐ Not certified as a Qualified Transmission Developer3
Primary Contact Person
Name:
Title:
E-Mail Address:
Telephone #:
Mailing Address:
Click here to enter name of primary contact person.
Click here to enter primary contact’s title.
Click here to enter primary contact’s email address.
Click here to enter primary contact’s telephone #.
Click here to enter primary contact’s mailing address.
Click here to enter primary contact’s mailing address.
Click here to enter primary contact’s mailing address.
1
Must be a posted identified issue or opportunity within a given MTEP or other study cycle.
Estimated cost shall be measured in U.S. dollars in the In-Service Date year.
3
Solution idea submission is open to all stakeholders. Qualified Transmission Developer status is only used to help
track planning participation of Qualified Transmission Developers.
2
Effective Date: N/A (DRAFT not yet effective)
Page 1 of 5
Solution Idea Submittal Form
MISO Top-Down Planning Process
Section II: Solution Idea Details – Transmission Lines
II.
Solution Idea Details – Transmission Lines
Proposed Transmission
Line Information
(this section is required for all solution ideas)
Transmission Section #1
Transmission Section #2
Transmission Section #3
Transmission Section #4
Transmission Section #5
Click to enter the termination
points (substations) of the line.
Click to enter the termination
points (substations) of the line.
Click to enter the termination
points (substations) of the line.
Click to enter the termination
points (substations) of the line.
Click to enter the termination
points (substations) of the line.
Improvement type
Improvement type
Improvement type
Improvement type
Improvement type
Operating Voltage
Operating Voltage
Operating Voltage
Operating Voltage
Operating Voltage
Click to enter # of miles.
Click to enter # of miles.
Click to enter # of miles.
Click to enter # of miles.
Click to enter # of miles.
Choose an item.
Choose an item.
Choose an item.
Choose an item.
Choose an item.
Choose a conductor location
Choose a conductor location
Choose a conductor location
Choose a conductor location
Choose a conductor location
Proposed # of circuits
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Current # of circuits
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Choose a structure status
Choose a structure status
Choose a structure status
Choose a structure status
Choose a structure status
Summer Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Winter Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Transmission Section Name
(Termination points of each segment)
Type of Improvement
Nominal Operating Voltage
Estimated Length
(kV)
(miles)
Special Routing Concerns
Conductor Location
(post solution idea)
(pre solution idea, if any currently exist)
Structure Status
(MVA)
(indicate Normal/Emergency ratings)
(MVA)
(indicate Normal/Emergency ratings)
Branch Resistance
(R in P.U.)
Click here to enter R in P.U.
Click here to enter R in P.U.
Click here to enter R in P.U.
Click here to enter R in P.U.
Click here to enter R in P.U.
Branch Reactance
(X in P.U.)
Click here to enter X in P.U.
Click here to enter X in P.U.
Click here to enter X in P.U.
Click here to enter X in P.U.
Click here to enter X in P.U.
Click here to enter B in P.U.
Click here to enter B in P.U.
Click here to enter B in P.U.
Click here to enter B in P.U.
Click here to enter B in P.U.
Choose an item.
Choose an item.
Choose an item.
Choose an item.
Choose an item.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Pi-Equivalent Shunt Susceptance
(B in P.U.)
Right-of-way Utilization Status
Estimated New Right-of-way
Acreage
Current # of circuits on Right-ofway (pre solution idea)
Proposed # of circuits on Rightof-way (post solution idea)
Effective Date: N/A (DRAFT not yet effective)
Page 2 of 5
Solution Idea Submittal Form
MISO Top-Down Planning Process
Section III: Solution Idea Details – Substation Facilities
III.
Solution Idea Details – Substation Facilities
Proposed Substation
Facilities Information
(this section is required for all solution ideas)
Click to enter
substation name.
Click to enter
substation name.
Click to enter
substation name.
Click to enter
substation name.
Click to enter
substation name.
New or Existing Substation?
New or Existing Substation?
New or Existing Substation?
New or Existing Substation?
New or Existing Substation?
AC or DC substation?
AC or DC substation?
AC or DC substation?
AC or DC substation?
AC or DC substation?
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Choose a transformer bank type
Choose a transformer bank type
Choose a transformer bank type
Choose a transformer bank type
Choose a transformer bank type
Operating Voltage
Operating Voltage
Operating Voltage
Operating Voltage
Operating Voltage
Operating Voltage
Operating Voltage
Operating Voltage
Operating Voltage
Operating Voltage
Operating Voltage
Operating Voltage
Operating Voltage
Operating Voltage
Operating Voltage
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Winter Thermal Limit –
High-side Winding (MVA)
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Summer Thermal Limit –
Low-side Winding (MVA)
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Winter Thermal Limit –
Low-side Winding (MVA)
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Summer Thermal Limit –
Tertiary-side Winding (MVA)
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Winter Thermal Limit –
Tertiary-side Winding (MVA)
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Normal/Emergency Thermal Limit
Click here to enter R in P.U.
Click here to enter R in P.U.
Click here to enter R in P.U.
Click here to enter R in P.U.
Click here to enter R in P.U.
Click here to enter X in P.U.
Click here to enter X in P.U.
Click here to enter X in P.U.
Click here to enter X in P.U.
Click here to enter X in P.U.
Click here to enter R in P.U.
Click here to enter R in P.U.
Click here to enter R in P.U.
Click here to enter R in P.U.
Click here to enter R in P.U.
Substation Status:
Substation Voltage Type:
Transformers:
Max Nameplate Rating
(MVA)
Type of Transformer Bank
High-side Winding Nominal
Operating Voltage (kV)
Low-side Winding Nominal
Operating Voltage (kV)
Tertiary Winding Nominal
Operating Voltage (kV)
Summer Thermal Limit –
High-side Winding (MVA)
(indicate Normal/Emergency ratings)
(indicate Normal/Emergency ratings)
(indicate Normal/Emergency ratings)
(indicate Normal/Emergency ratings)
(indicate Normal/Emergency ratings)
(indicate Normal/Emergency ratings)
High-to-Low Resistance
(R in P.U.)
High-to-Low Reactance
(X in P.U.)
High-to- Tertiary Resistance
(R in P.U.)
Effective Date: N/A (DRAFT not yet effective)
Page 3 of 5
Solution Idea Submittal Form
MISO Top-Down Planning Process
Section III: Solution Idea Details – Substation Facilities
High-to- Tertiary Reactance
Click here to enter X in P.U.
Click here to enter X in P.U.
Click here to enter X in P.U.
Click here to enter X in P.U.
Click here to enter X in P.U.
Click here to enter R in P.U.
Click here to enter R in P.U.
Click here to enter R in P.U.
Click here to enter R in P.U.
Click here to enter R in P.U.
Click here to enter X in P.U.
Click here to enter X in P.U.
Click here to enter X in P.U.
Click here to enter X in P.U.
Click here to enter X in P.U.
Operating Voltage
Operating Voltage
Operating Voltage
Operating Voltage
Operating Voltage
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Operating Voltage
Operating Voltage
Operating Voltage
Operating Voltage
Operating Voltage
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Choose an item.
Choose an item.
Choose an item.
Choose an item.
Choose an item.
(MW)
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
(kV)
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
(X in P.U.)
Low-to- Tertiary Resistance
(R in P.U.)
Low-to- Tertiary Reactance
(X in P.U.)
Shunt Capacitors:
Nominal Operating Voltage
Proposed Capacitor Size
(kV)
(MVAR)
Shunt Reactors:
Nominal Operating Voltage
Proposed Reactor Size
(kV)
(MVAR)
DC Converters:
Converter Type
Power Rating
Voltage Rating
Please List any other substation facilities included in the proposed solution idea:
______________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________________________________________________
___________________________________
Effective Date: N/A (DRAFT not yet effective)
Page 4 of 5
Solution Idea Submittal Form
MISO Top-Down Planning Process
Section IV: Solution Idea Details – Cost Estimates
Solution Idea Details – Cost Estimates
IV.
Estimated Transmission
Line Costs4
Material
Transmission Section #1
Transmission Section #2
Transmission Section #3
Transmission Section #4
Transmission Section #5
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
(U.S. $)
Right-of-way Acquisition
(this section is required for all solution ideas)
(U.S. $)
Engineering Labor
(U.S. $)
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Construction Labor
(U.S. $)
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Regulatory/miscellaneous
(U.S. $)
Total Estimated Cost/Section
$
(U.S. $)
Estimated cost per mile
$
Estimated Substation
Costs4
Material
(U.S. $)
Site Property Rights
Engineering Labor
(U.S. $)
(U.S. $)
Construction Labor
(U.S. $)
Regulatory/miscellaneous
(U.S. $)
Estimated Cost for Station
(U.S. $)
Estimated Total Cost of
Substations (U.S. $)
$
.00
$
.00
$
.00
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click to enter
substation name.
Click to enter
substation name.
Click to enter
substation name.
Click to enter
substation name.
Click to enter
substation name.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
Click here to enter #.
.00
$
$
.00
Click here to enter #.
.00
$
.00
$
.00
$
.00
$
.00
.00
Total Estimated Cost of Proposed Solution Idea (in U.S. $)4
4
$
Click here to enter #.
(U.S. $)
Estimated Total Cost of
Transmission Lines (U.S. $)
.00
$
.00
Estimated cost shall be measured in U.S. dollars in the In-Service Date year.
Effective Date: N/A (DRAFT not yet effective)
Page 5 of 5