Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Automatic movable railway platform with train arrival detection and monitoring over internet of things (IOT) Aim: The main theme of this project is to indicate the train arrivals and platform indication for passengers over internet. Abstract: The main aim of this project is to automate railway track pedestrian crossing without use staircase &announce the status of the arrival for platform users. In this system is also used to avoid accident problems. Because, now a day’s train accidents are occurring frequently in India. This project identifies the status of each train using I transceivers and informs it to microcontroller. This project is used to avoid the train collusion, thus we save the valuable human lives and losses. This project is useful for railway departments. The recent survey from the social analytics was said that the most disadvantages in Indian railway is climbing up the overhead steps for the physically challenged people. Proposed system mainly deals with the rectification of this disadvantage. We introducing the new concept of artificial railway platform. $or the successful approach we are using two sensors and for the execution we are using Hbridge and for the controlling operations we are using microcontroller. Then the train comes near the artificial platform, the proximity sensor senses the train and gives its output to the microcontroller. The supply of oscillator is connected the controller. The power supply is given to the controller pins of power supply. The H-bridge is used for the forward and reverse movement of the platform. Then the train is far away from the artificial platform the signal sends to microcontroller, and then the output signal from the controller is send to H-Bridge. The relay will keep closed i.e., platform is connected. This project is designed with ARM7TDMI processor. In this project we are using A2,GROUND FLOOR,OMEGA APARTMENT,NEAR KVB BANK,YELLAREDDY GUDA ROAD,OPP RS BROTHERS,AMEERPET,HYDERABAD,TELANGANA-500073 www.esystems.co.in different modules such as LPC2148, GSM, GPS and 16X2 LCD. The project is implemented by using two modules to find out the exact location of vehicle we are using GPS and the information can be obtained as a message by using a GSM module. The LPC2148 are based on a 16/32 bit ARM7TDMI-S™ CPU with real-time emulation and embedded trace support, together with 128/512 kilobytes of embedded high speed flash memory. A 128-bit wide memory interface and unique accelerator architecture enable 32-bit code execution at maximum clock rate. For critical code size applications, the alternative 16-bit Thumb Mode reduces code by more than 30% with minimal performance p e n a l t y . With their compact 64 pin package, low power consumption, various 32-bit timers, 4- channel 10-bit ADC, USB PORT,PWM channels and 46 GPIO lines with up to 9 external interrupt pins these microcontrollers are particularly suitable for industrial control, medical systems, access control and point-of-sale. With a wide range of serial communications interfaces, they are also very well suited for communication gateways, protocol converters and embedded soft modems as well as many other general-purpose applications. This project uses regulated 5V, 750mA power supply. 7805 three terminal voltage regulator is used for voltage regulation. Bridge type full wave rectifier is used to rectify the ac output of secondary of 230/18V step down transformer. Block Diagram: A2,GROUND FLOOR,OMEGA APARTMENT,NEAR KVB BANK,YELLAREDDY GUDA ROAD,OPP RS BROTHERS,AMEERPET,HYDERABAD,TELANGANA-500073 www.esystems.co.in A2,GROUND FLOOR,OMEGA APARTMENT,NEAR KVB BANK,YELLAREDDY GUDA ROAD,OPP RS BROTHERS,AMEERPET,HYDERABAD,TELANGANA-500073 www.esystems.co.in POWER SUPPLY: Hardware requirements: 1. 2. 3. 4. 5. IR Transmitter and receiver section. Micro controller H-bridge Motors IoT modules like zigbee, wifi Software requirements 1. Keil for coding. 2. Embedded C language Applications: 1. Easy to identify the platforms numbers and train arrivals, departures..Etc., A2,GROUND FLOOR,OMEGA APARTMENT,NEAR KVB BANK,YELLAREDDY GUDA ROAD,OPP RS BROTHERS,AMEERPET,HYDERABAD,TELANGANA-500073 www.esystems.co.in Advantages: • Reduces train accidents. • Reduces the timing of braking. • Highly helpful to physically challenged people. Applications: This system can be implemented in Railways. A2,GROUND FLOOR,OMEGA APARTMENT,NEAR KVB BANK,YELLAREDDY GUDA ROAD,OPP RS BROTHERS,AMEERPET,HYDERABAD,TELANGANA-500073 www.esystems.co.in