THE GREAT MAN-MADE RIVER PROJECT
Libya covers an area of approximately
1,800,000 km2
Total population is 5.76 million
THE GREAT MAN-MADE RIVER PROJECT
ƒ
The Libyan climate ranges between
Mediterranean to arid and semi-arid.
ƒ
Precipitation ranges from 10 to 500
mm/yr. Only 5 % of the entire area
exceeds 100 mm annually.
ƒ
Potential evapotranspiration amounts to
1700 mm in the north coastal strip to
6000 mm in the south.
ƒ
Hydrological studies in arid regions
indicate
no
recharge
by
direct
infiltration when rainfall is less than 200
mm per year.
THE GREAT MAN-MADE RIVER PROJECT
ƒ Ground water is the primary source of freshwater,
accounting for 95.6% of total Libyan demand, Surface water
2.3%, desalination 1.4%, and Water treatment 0.7%.
ƒ Excessive abstractions of water from the coastal aquifers to
satisfy the ever increasing water demand, led to large draw
down of the water table. This in turn led to sea water
intrusion to the coastal aquifers and consequently fresh
water quality continued to deteriorate.
ƒ Hydrogeological studies indicate huge fossil water reserves
in desert basins ( i.e. Kufra, Sirt, Hamada and Murzug ).
THE GREAT MAN-MADE RIVER PROJECT
Mediterranean Sea
Jeffara
Tripoli
Benghazi
Sirt
Hamada
Green Mountains
Ajdabiya
In a recent study conducted under the supervision of the UN
Centreextraction
for Environment
& Development
in the Arab
Region
&
These
basins
contain
Over
in
these
basins
has
resulted
in
seawater
Murzug
Europe
CEDARE,
the Nubian
Basin
(of which
Kufra isreaching
a part)
10,000
–aquifers
12,000
cubic
Km.
intrusion in the coastal
with
TDS levels
was
estimated
to contain
373.3 xwater
1012 m3.
of
economically
extractable
7000ppm in
the
Tripoli
region
Sirt
If the neighboring countries extract water at a rate of 1380
MCMY it is calculated that the reserve would last for 4860 years.
Kufra
0
150
300
450
600
Km
THE GREAT MAN-MADE RIVER PROJECT
Cost Comparison Between Different Water Supply Alternatives
0.79 m3
Desalination
1.05 m3
Transportation by ships
Quantity of water per One Libyan Dinar
0.74 m3
Pipeline from South
Europe to Tripoli
9.00 m3
Great Man-Made River
Project
THE GREAT MAN-MADE RIVER PROJECT
Gardabiya /Wellfield
Sedada Link
Ghadames
Jaghboub Wellfield
- Length No. of Wells
190
Km (119 Miles).
144
- Diameter
m (13 ft.).
Total Production 4.0
90 MCMY
Tripoli
No. of Wells 40
Total Production 50 MCMY
Mediterranean Sea
Tobruk
Benghazi
Sirt Ajdabiya
Brega PCCP Plant
Ghadames
Jaghboub
NE Jebel Hasouna
Wellfield
Sarir & Tazerbo Well Fields
Sarir
Wellfield
East & NE
Sarir PCCP
JabalPlant
Hasouna Wellfields
E Jebel Hasouna
Kufra Wellfield Wellfield
- Total Production 2.0 MCMD
No. of 234
Wells 285
- No. of Wells
Total
Production
1.68
MCMD
- Length
1926
Km (1204
Miles
).
of mainly 4.0 m (13 ft.) diameter pipes
- No.Tazerbo
of Wells
586
- Total Tazerbo
Production 2.5 MCMD
Wellfield
- Length
of 1.732 Km (1,083 Miles)
of mainly 4.0 m (13Kufra
ft.) diameter pipes
Reservoirs
Ajdabiya Holding Reservoir
Al Gardabiya Reservoir
Omar Mukhtar Reservoir
The Grand Al Gardabiya Reservoir
The Grand Omar Mukhtar Reservoir
- Capacity
- Capacity
- Capacity
- Capacity
- Capacity
4.0
6.8
4.7
15.4
24.0
Total Storage Capacity = 54.9 mcm
mcm
mcm
mcm
mcm
mcm
Two Pipe Manufacturing Plants
•Sarir Plant
Three lines producing 120 pipes daily
•Brega Plant
Two lines producing 80 pipes daily
THE GREAT MAN-MADE RIVER PROJECT
Pipe Transportation
Haul Roads
•Phase I Total Length 1,600 Km (1,000 Miles).
•Phase II Total Length 2,155 km (1,340 Miles).
Pipe Laying
Depth of Trench 7.0 m (23 ft.).
Capacity of Cranes Used up to 450 tons
Water Allocation in m3/day
6.57 Million Cubic Metres Water per Day Transfer
2,398 Million Cubic Metres per Year
28 %
Municipal
1,838,480 m3
2%
Industrial
131,320 m3
70 %
Agricultural
4,596,200 m3
THE GREAT MAN-MADE RIVER PROJECT
Tripoli
Mediterranean Sea
Tunisia
Tunisia
Jefara Plains
Region
Benghazi
Benghazi Plains
Region
Tobruk
Sirt
Ajdabiya
Al-Ghardabiya Plains
Region
ia
eria
lger
Alg
A
Jaghboub
Sarir PCCP
Plant
NE Jebel Hasouna
Wellfield
Sarir
Wellfield
yptt
gyp
Eg
E
Brega PCCP Plant
Ghadames
The agricultural development plan aims to:
E Jebel Hasouna
Wellfield
• Realizedevelopment
the highest possible
rate
self-sufficiency
in in
grain
and
Tazerbo
The agricultural
projects
areofbeing
carried out
three
regions in
fodder
crops.
Libya:
Tazerbo
Wellfield
•
Increase
the
capital
investment
and
opportunities
in
the
Investors
with
experience
in
the
field
are
invited
to
•Benghazi Plains Region – net irrigated area job
30,000
hectares
(75,000
acres)
agricultural
sector.
Kufra
participate
in: acres) to be developed as large farm projects.
14,000 hectares
(35,000
an
dan
ud
Su
S
• Produce
raw(Tripoli)
materials
for the
food processing
industry.
• Implementation
•Jefara Plains
Region
- net
irrigated
area 80,000
hectares (200,000 acres)
• Operation
1,500 hectares
(3,750
acres)
to beagricultural
developed settlement.
as large farm projects.
• Encourage
and
support
• Maintenance
0
150
300
450
600
•Gardabiya
Plains
Region
(Sirt)
- net irrigated
area
hectares
(50,000 acres)
• Diversification
of
the
national
income
by 20,000
exporting
high quality
• Management Km
and
product
marketing
5,400 hectares
(13,500 acres) to be developed as large farm projects.
cash
Of
thecrops.
large farm projects
THE GREAT MAN-MADE RIVER PROJECT
Mediterranean Sea
Tripoli
Tunisia
Tunisia
Benghazi
Jefara Plains
Region
Benghazi Plains
Region
Tobruk
Sirt
Ajdabiya
Al-Ghardabiya Plains
Region
ia
eria
lger
Alg
A
Jaghboub
Sarir PCCP
Plant
NE Jebel Hasouna
Wellfield
yptt
gyp
Eg
E
Brega PCCP Plant
Ghadames
Agricultural Land Developed
Sarir 130,000 hectare
Wellfield
( 325,000 acres
) approx. ( 20,000 farms )
E Jebel Hasouna
Wellfield
Tazerbo
an
dan
ud
Su
S
Tazerbo
About 100,000 existing Wellfield
farms will be
supplemented
with irrigation
from
International
Companies
have alreadywater
invested
in the
the
Kufra
development
of Large
Farm
Projects:
project which
will
have
great impact on their
- 14,000 Hectares
acres) – Benghazi
Plains Regionof
productivity
and(35,000
encourage
the settlement
- 800 Hectares (2000 acres) – Tarhouna
farmers
and
their
families, hence a positive
- 150
Valmont
Valley
supplying Irrigation equipment
0
300
450
600
Km
on the
valueequipment
of their property
- impact
Case supplying
agricultural
THE GREAT MAN-MADE RIVER PROJECT
We can conclude that, adequate fresh water supplied by
the gigantic GMRA project, have become an integral part of
the infrastructure (including real estate) in all domestic,
agricultural and industrial aspects, both in rural and urban
areas, so as these areas grow, the need for infrastructure
increase.
THE GREAT MAN-MADE RIVER PROJECT
Which results in:
Encouraging people in rural areas to stay in their
land, due to Agricultural expansion.
THE GREAT MAN-MADE RIVER PROJECT
THE GREAT MAN-MADE RIVER PROJECT
JOINT VENTURE PROJECT FOR ORGANIC
AGRICLTURE FOR GRAPES
THE GREAT MAN-MADE RIVER PROJECT
Sources for Project
Financing
The project is financed from the following sources:-
ƒ Law (10/83) revenues.
ƒ The revenue gained by selling water produced by the
project’s System.
ƒ What is annually allocated in the country’s development
budget, loans and financial facilities.
THE GREAT MAN-MADE RIVER PROJECT
Fees (indirect taxes) , established by
Law no 10/1983
ƒ Fees on documentary credits and money orders.
ƒ Fees on selling fuel derivations.
ƒ Fees on commerce , trade and industrial licenses.
ƒ Fees on selling local and imported Tobacco and
Cigarettes.
ƒ Fees on international travel tickets.
THE GREAT MAN-MADE RIVER PROJECT
19.58 Billion Dollars Project Cost
Mediterranean Sea
Tobruk
Capital
ƒ Phase
I - Cost
$5.53 Billion
Operation & Maintenance Cost
ƒ Phase II - $8.05 Billion
Total Investment Cost (50 Years)
$19.58 Billion
Benghazi
Sirt
Ajdabiya
$14.11 Billion
Jaghboub
ria
geria
Alge
Al
Ghadames
NE Jebel Hasouna
Wellfield
$33.69 Billion
Sarir
yptt
Egyp
Eg
Tripoli
Tunisia
Tunisia
Wellfield
E Jebel Hasouna
Wellfield
3
Expected
Production
Quantity
120
Billion
m
ƒ Current & Future
Kufra
Phases
- $6.0
Unit
rate/
m3 Billion
water to recover investment cost over
50 years
0
150 300 450 600
Tazerbo
Km
$0.28/m3
dann
Suda
Su
Tazerbo
Wellfield
PROJECT STATISTICS
Total
Total
Weight
No. ofofPipes
Cement
The
total of
number
wells
Volume
TrenchofExcavation
6.9 million
585,296
1,350tonnes
240 million m3
length of
pre-stressing
wireis
The cement
used
in the project
The amount
of
aggregate
in
used
in the
is equivalent
to the project is
sufficient
to project
construct
a used
concrete
sufficient
tothebuild
16 pyramids
the size of the
220
times
circumference
of the
road
from Tripoli
to Mumbai
Great. Pyramid .
earth
THE GREAT MAN-MADE RIVER PROJECT
Mediterranean Sea
Tripoli
Tobruk
Benghazi
Sirt
Ajadibya
Germany
England
Tazerbo
France
Project
Project Scale
Scale
0
150
300
450
600
Km
Al Kufra
THE GREAT MAN-MADE RIVER PROJECT
Tripoli
Sirt
Ghadames
OKLAHOMA
NEW
MEXICO
TEXAS
Tazerbo
LOUISIANA
Ajadibya
COLORADO
ARKANSAS
KANSAS
Tobruk
MISSOURI
Benghazi
Al Kufra
Project
Project Scale
Scale
0
150
300
450
600
Km
THE GREAT MAN-MADE RIVER PROJECT
Thank You for your attention