Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
THE GREAT MAN-MADE RIVER PROJECT Libya covers an area of approximately 1,800,000 km2 Total population is 5.76 million THE GREAT MAN-MADE RIVER PROJECT The Libyan climate ranges between Mediterranean to arid and semi-arid. Precipitation ranges from 10 to 500 mm/yr. Only 5 % of the entire area exceeds 100 mm annually. Potential evapotranspiration amounts to 1700 mm in the north coastal strip to 6000 mm in the south. Hydrological studies in arid regions indicate no recharge by direct infiltration when rainfall is less than 200 mm per year. THE GREAT MAN-MADE RIVER PROJECT Ground water is the primary source of freshwater, accounting for 95.6% of total Libyan demand, Surface water 2.3%, desalination 1.4%, and Water treatment 0.7%. Excessive abstractions of water from the coastal aquifers to satisfy the ever increasing water demand, led to large draw down of the water table. This in turn led to sea water intrusion to the coastal aquifers and consequently fresh water quality continued to deteriorate. Hydrogeological studies indicate huge fossil water reserves in desert basins ( i.e. Kufra, Sirt, Hamada and Murzug ). THE GREAT MAN-MADE RIVER PROJECT Mediterranean Sea Jeffara Tripoli Benghazi Sirt Hamada Green Mountains Ajdabiya In a recent study conducted under the supervision of the UN Centreextraction for Environment & Development in the Arab Region & These basins contain Over in these basins has resulted in seawater Murzug Europe CEDARE, the Nubian Basin (of which Kufra isreaching a part) 10,000 –aquifers 12,000 cubic Km. intrusion in the coastal with TDS levels was estimated to contain 373.3 xwater 1012 m3. of economically extractable 7000ppm in the Tripoli region Sirt If the neighboring countries extract water at a rate of 1380 MCMY it is calculated that the reserve would last for 4860 years. Kufra 0 150 300 450 600 Km THE GREAT MAN-MADE RIVER PROJECT Cost Comparison Between Different Water Supply Alternatives 0.79 m3 Desalination 1.05 m3 Transportation by ships Quantity of water per One Libyan Dinar 0.74 m3 Pipeline from South Europe to Tripoli 9.00 m3 Great Man-Made River Project THE GREAT MAN-MADE RIVER PROJECT Gardabiya /Wellfield Sedada Link Ghadames Jaghboub Wellfield - Length No. of Wells 190 Km (119 Miles). 144 - Diameter m (13 ft.). Total Production 4.0 90 MCMY Tripoli No. of Wells 40 Total Production 50 MCMY Mediterranean Sea Tobruk Benghazi Sirt Ajdabiya Brega PCCP Plant Ghadames Jaghboub NE Jebel Hasouna Wellfield Sarir & Tazerbo Well Fields Sarir Wellfield East & NE Sarir PCCP JabalPlant Hasouna Wellfields E Jebel Hasouna Kufra Wellfield Wellfield - Total Production 2.0 MCMD No. of 234 Wells 285 - No. of Wells Total Production 1.68 MCMD - Length 1926 Km (1204 Miles ). of mainly 4.0 m (13 ft.) diameter pipes - No.Tazerbo of Wells 586 - Total Tazerbo Production 2.5 MCMD Wellfield - Length of 1.732 Km (1,083 Miles) of mainly 4.0 m (13Kufra ft.) diameter pipes Reservoirs Ajdabiya Holding Reservoir Al Gardabiya Reservoir Omar Mukhtar Reservoir The Grand Al Gardabiya Reservoir The Grand Omar Mukhtar Reservoir - Capacity - Capacity - Capacity - Capacity - Capacity 4.0 6.8 4.7 15.4 24.0 Total Storage Capacity = 54.9 mcm mcm mcm mcm mcm mcm Two Pipe Manufacturing Plants •Sarir Plant Three lines producing 120 pipes daily •Brega Plant Two lines producing 80 pipes daily THE GREAT MAN-MADE RIVER PROJECT Pipe Transportation Haul Roads •Phase I Total Length 1,600 Km (1,000 Miles). •Phase II Total Length 2,155 km (1,340 Miles). Pipe Laying Depth of Trench 7.0 m (23 ft.). Capacity of Cranes Used up to 450 tons Water Allocation in m3/day 6.57 Million Cubic Metres Water per Day Transfer 2,398 Million Cubic Metres per Year 28 % Municipal 1,838,480 m3 2% Industrial 131,320 m3 70 % Agricultural 4,596,200 m3 THE GREAT MAN-MADE RIVER PROJECT Tripoli Mediterranean Sea Tunisia Tunisia Jefara Plains Region Benghazi Benghazi Plains Region Tobruk Sirt Ajdabiya Al-Ghardabiya Plains Region ia eria lger Alg A Jaghboub Sarir PCCP Plant NE Jebel Hasouna Wellfield Sarir Wellfield yptt gyp Eg E Brega PCCP Plant Ghadames The agricultural development plan aims to: E Jebel Hasouna Wellfield • Realizedevelopment the highest possible rate self-sufficiency in in grain and Tazerbo The agricultural projects areofbeing carried out three regions in fodder crops. Libya: Tazerbo Wellfield • Increase the capital investment and opportunities in the Investors with experience in the field are invited to •Benghazi Plains Region – net irrigated area job 30,000 hectares (75,000 acres) agricultural sector. Kufra participate in: acres) to be developed as large farm projects. 14,000 hectares (35,000 an dan ud Su S • Produce raw(Tripoli) materials for the food processing industry. • Implementation •Jefara Plains Region - net irrigated area 80,000 hectares (200,000 acres) • Operation 1,500 hectares (3,750 acres) to beagricultural developed settlement. as large farm projects. • Encourage and support • Maintenance 0 150 300 450 600 •Gardabiya Plains Region (Sirt) - net irrigated area hectares (50,000 acres) • Diversification of the national income by 20,000 exporting high quality • Management Km and product marketing 5,400 hectares (13,500 acres) to be developed as large farm projects. cash Of thecrops. large farm projects THE GREAT MAN-MADE RIVER PROJECT Mediterranean Sea Tripoli Tunisia Tunisia Benghazi Jefara Plains Region Benghazi Plains Region Tobruk Sirt Ajdabiya Al-Ghardabiya Plains Region ia eria lger Alg A Jaghboub Sarir PCCP Plant NE Jebel Hasouna Wellfield yptt gyp Eg E Brega PCCP Plant Ghadames Agricultural Land Developed Sarir 130,000 hectare Wellfield ( 325,000 acres ) approx. ( 20,000 farms ) E Jebel Hasouna Wellfield Tazerbo an dan ud Su S Tazerbo About 100,000 existing Wellfield farms will be supplemented with irrigation from International Companies have alreadywater invested in the the Kufra development of Large Farm Projects: project which will have great impact on their - 14,000 Hectares acres) – Benghazi Plains Regionof productivity and(35,000 encourage the settlement - 800 Hectares (2000 acres) – Tarhouna farmers and their families, hence a positive - 150 Valmont Valley supplying Irrigation equipment 0 300 450 600 Km on the valueequipment of their property - impact Case supplying agricultural THE GREAT MAN-MADE RIVER PROJECT We can conclude that, adequate fresh water supplied by the gigantic GMRA project, have become an integral part of the infrastructure (including real estate) in all domestic, agricultural and industrial aspects, both in rural and urban areas, so as these areas grow, the need for infrastructure increase. THE GREAT MAN-MADE RIVER PROJECT Which results in: Encouraging people in rural areas to stay in their land, due to Agricultural expansion. THE GREAT MAN-MADE RIVER PROJECT THE GREAT MAN-MADE RIVER PROJECT JOINT VENTURE PROJECT FOR ORGANIC AGRICLTURE FOR GRAPES THE GREAT MAN-MADE RIVER PROJECT Sources for Project Financing The project is financed from the following sources:- Law (10/83) revenues. The revenue gained by selling water produced by the project’s System. What is annually allocated in the country’s development budget, loans and financial facilities. THE GREAT MAN-MADE RIVER PROJECT Fees (indirect taxes) , established by Law no 10/1983 Fees on documentary credits and money orders. Fees on selling fuel derivations. Fees on commerce , trade and industrial licenses. Fees on selling local and imported Tobacco and Cigarettes. Fees on international travel tickets. THE GREAT MAN-MADE RIVER PROJECT 19.58 Billion Dollars Project Cost Mediterranean Sea Tobruk Capital Phase I - Cost $5.53 Billion Operation & Maintenance Cost Phase II - $8.05 Billion Total Investment Cost (50 Years) $19.58 Billion Benghazi Sirt Ajdabiya $14.11 Billion Jaghboub ria geria Alge Al Ghadames NE Jebel Hasouna Wellfield $33.69 Billion Sarir yptt Egyp Eg Tripoli Tunisia Tunisia Wellfield E Jebel Hasouna Wellfield 3 Expected Production Quantity 120 Billion m Current & Future Kufra Phases - $6.0 Unit rate/ m3 Billion water to recover investment cost over 50 years 0 150 300 450 600 Tazerbo Km $0.28/m3 dann Suda Su Tazerbo Wellfield PROJECT STATISTICS Total Total Weight No. ofofPipes Cement The total of number wells Volume TrenchofExcavation 6.9 million 585,296 1,350tonnes 240 million m3 length of pre-stressing wireis The cement used in the project The amount of aggregate in used in the is equivalent to the project is sufficient to project construct a used concrete sufficient tothebuild 16 pyramids the size of the 220 times circumference of the road from Tripoli to Mumbai Great. Pyramid . earth THE GREAT MAN-MADE RIVER PROJECT Mediterranean Sea Tripoli Tobruk Benghazi Sirt Ajadibya Germany England Tazerbo France Project Project Scale Scale 0 150 300 450 600 Km Al Kufra THE GREAT MAN-MADE RIVER PROJECT Tripoli Sirt Ghadames OKLAHOMA NEW MEXICO TEXAS Tazerbo LOUISIANA Ajadibya COLORADO ARKANSAS KANSAS Tobruk MISSOURI Benghazi Al Kufra Project Project Scale Scale 0 150 300 450 600 Km THE GREAT MAN-MADE RIVER PROJECT Thank You for your attention