Survey
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
Commissioning Service Department Commissioning Standard Test Formats Description: High Imp. Secondary Injection Location : Protection Panels Contractor : Record No. : Drawing ref.: Contract no.: Sheet : 1 of 2 Substation No : S/s 1. GENERAL DATA AND INFORMATION: Circuit. Frequency: Panel No. Serial no: Make: Model no: 60 Hz 2. RELAY SETTING: DIFF. SETTING(V): CT Supervision setting(V) Operating Current(mA): Shunt Resistor (Ohm) Stabilizing Resistor(Ohm): CTS DT (S) CT Ratio: BB Prim. Current (A) 3. SERIES RESISTOR MEASUREMENT: Phase Setting value (Ω) Measurement value (Ω) R-N R01= Ω Y-N R02= Ω B-N R03= Ω 4. SHUNT RESISTOR MEASUREMENT: Tested by: Signature & Date: Phase Setting value (Ω) R-N RS1= Ω Y-N RS2= Ω B-N RS3= Ω ENG. Witnessed by: Signature & Date: Measurement value (Ω) ENG. Commissioning Service Department Commissioning Standard Test Formats Description: High Imp. Secondary Injection Location : Protection Panels Contractor : Drawing ref.: Contract no.: Record No. : Sheet : 2 of 2 Substation No : S/s 5. SECONDARY INJECTION TEST: 5.1. CT SUPERVISION OPEARION: Injected Phase Voltage (V) Current(mA) Main relay Current(CTS) mA Metrosil Current mA SHUNT RESISTOR CURRENT mA Main relay Current(CTS) mA Metrosil Current mA SHUNT RESISTOR CURRENT mA R Y B 5.2. MAIN RELAY OPERATION: Injected Phase Voltage (V) Current(mA) R Y B Tested by: Signature & Date: ENG. Witnessed by: Signature & Date: ENG.