Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
• High voltage equipments must be tested in a high voltage laboratory according to standards. • Disruptive, breakdown, withstand voltage and partial discharge can be performed in the lab. • High voltage testing is used to access the insulation property of gas, liquid and solid. • High voltage test should be performed according to the standards (IEC, ANSI, IEEE, BSI etc.) Objectives : 1. Studying and testing 2. Research and development 3. Training and seminar Testing offers : 1. AC high voltage test (up to 200 kV) 2. DC high voltage test (up to 200 kV) 3. High voltage impulse test (up to 200 kV) AC test circuit DC test circuit HV impulse test circuit Components : 1. 2 sets of high voltage construction kit from Haefely AG., Switzerland 2. Modern high voltage control unit from Power Diagnostix GmbH., Germany, consists of: Transformer control unit (TCU) HV test control unit Step voltage test controller 3. Partial discharge measurement system (ICM system) from Power Diagnostix GmbH., Germany, consists of: • Calibrators • Coupling device • Signal conditioning (Pre – amplifier) • Acquisition unit • Software program Electrical Power and Energy Engineering(EPE), TGGS, KMUTNB Tel : +66 2913 2500-24 ext. 2904 Fax : +66 2913 5805 www.tggs.kmutnb.ac.th/EPE/ Email: [email protected], [email protected]