Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
(The report is to be on the letterhead of the company preparing the report) Date issued: October 2013 Green Star Short Report Round [1/2] Ensure all prompts shown in Blue text have been responded to. Green Star – Office Design v3 Credit: Eco-2 Reuse of Land Project Name: [name] Project Number: GS- [####] Points available: Points claimed: [1] 1 1. Refurbishment or Building Extension (this is relevant to project teams targeting this credit as a building refurbishment or extension) The project is a refurbishment or a building extension [Please provide a short description of refurbishment and/or building extension] [Insert hyperlinks to documents which support these claims] Therefore as demonstrated in section 1, this project is eligible to achieve 1 point for the reuse of an existing building. 2. Existing Site (this is relevant to project teams targeting this credit due to existing site being built upon) At the time of site purchase, a minimum of 75% of the site had been previously built on. [Please provide a short description of the site and the built areas at the time of site purchase] The site’s built areas at the time of site purchase are quantified below: Description Area (m2) [ m 2] [ m 2] 1 (The report is to be on the letterhead of the company preparing the report) Date issued: October 2013 [ m 2] [ m 2] Total [ m 2] Total developed area: [m2] Total undeveloped area: [m2] Percentage of previously built on area: [%] [Insert hyperlinks to documents which support these claims] Therefore as demonstrated in section 2, this project is eligible to achieve 1 point for the reuse of a site previously built on. Discussion [Insert any issues you would like to highlight and clarify to the Assessment Panel.] Author Details: [Insert name, position and contact details of author] [Date] ––– Report end ––– 2