Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
“NEW MNIR” DESIGN COMPETITION Project Costs Structure Estimation Note about Estimations and Project Management Contingencies: All Estimations for Construction, Restoration, Critical Systems, Auxiliary Systems, Labor, and Project Management have been extensively planned and conferred with Industry-Specific Experts or Research data. All costs have been estimated as of May 2016 and will be relevant, as per specific offers, up until August 2016. Project Contingencies have been calculated as weighted averages per specific components and project-level sections according to industry-specific guidelines. Discounts applied are included into the cost estimates are provided as-is, until the mentioned dates. Restoration, Construction, Future-proofing, and Labor cost structure: Building Works Section Surface (sqm) Cost per sqm Total Sub Levels 8,100 € 830 € 6,723,000 Levels 21,500 € 780 € 16,770,000 Attics 2,470 € 590 € 1,457,300 Roofs 5,200 € 520 € 2,704,000 Structure 2,400 € 12 € 28,800 Roofs 1,150 € 17 € 19,550 Interiors 3,375 € 10 € 33,750 HVAC and Underfloor Heating Retrofit 19,365 € 72 € 1,394,280 Window Restoration and Replacement 3,380 € 340 € 1,149,200 Restoration Old Structure Demolition TOTAL New Structure € 30,279,880 Radier 2,750 € 220 € 605,000 Sub Levels 4,750 € 730 € 3,467,500 Main Floor area 2,750 € 840 € 2,310,000 Levels and Pathways 3,750 € 160 € 600,000 HVAC and Underfloor Heating Retrofit 10,100 € 72 € 727,200 Windows 1,005 € 320 € 321,600 TOTAL Green Areas Landscape € 8,031,300 Ground Level 600 € 90 € 54,000 Pathways 1,200 € 120 € 144,000 TOTAL € 198,000 Grand Total € 38,509,180 HVAC + Regenerative Heat Pump System cost structure: Permanent Exhibitions Temporary Exhibitions Thesaurus Admin Labs Public Spaces Auditoriums Usable Area (sqm) 7,300 1,900 1,300 1,325 3,800 3,100 640 Height (m) 5.0 8.0 6.0 4.0 4.0 7.0 7.0 Volume (cbm) 36,500 15,200 7,800 5,300 15,200 21,700 4,480 Usable Area (sqm) 4,370 1,930 800 Height (m) 9.5 5.0 6.0 Volume (cbm) 41,515 9,650 4,800 Category Old Building New Building Surface Area (Requiring Climate control) Floors Ventilation 29,465 Building Management System 3,000 n/a n/a n/a 12,000 Description Heat Pumps, Integrated HVAC, Low-friction Centrifugal Chiller, Boilers, Air Quality Controller, HEPA Filtration, Custom Ductwork, Grilles, and Louver Systems Smart Building Management Software, Green Energy Efficiency, Energy Recycling, Smart Flow and Climate Control. Grand Total 4.0 Cost per sqm Total Cost Power per Unit kW Power € 40 € 1,178,600 100 sqm 2,947 € 150 € 4,419,750 43 cbm 3,331 € 30 € 883,950 n/a n/a 6,277 € 6,482,300 Security and Emergency System cost structure: Category Description Cost Products Advanced Anti-theft and Intrusion Technology, Indoor and Outdoor CCTV System, Voice Alert Systems, Cyber-Security Firewall, Door, Security Checkup Gates, Window Protection, Automation Control System, etc. € 275,000 Infrastructure Redundant Power Supply, Cabling, Networking, Access Control points, Power Regulators, Wireless Relays, Communications Control Units, Earthquake Protection, etc. € 55,000 Software Central Control System with Disaster Recovery and Anti-terrorism Feature, Remote Alert and Monitoring System, Video Analytics and Efficiency, etc. € 137,000 Professional Installation, Configuration, and Maintenance. € 268,000 Bracelet Access, Wireless Transmitters, Remote Applications, Custom Mounting Systems, etc. € 43,000 Labor Accessories Grand Total € 778,000 Fire Safety and Protection System cost structure: Category Description Cost Products Automation Control System, Cyber-Security Firewall, Aspiratory Smoke Detection, Laser Particle Smoke Detection, Beam Detection Systems, Inert Gas Extinguishing System, Voice Alert and Directional Audio, Redundant Evacuation Signage, Wireless Cluster, Transponders, etc. € 436,000 Infrastructure Emergency Power Supply, Cabling, Networking, Manual Call points, Power Regulators, Wireless Relays, Earthquake Protection, Communications Control Units, Central Control Unit, etc. € 82,000 Central Control System with Disaster Recovery, Remote Alert and Monitoring System, Energy Efficiency Monitoring, Analytics and Optimization Suite, etc. € 5,000 Software Labor Accessories Professional Installation, Configuration, and Maintenance. € 314,000 Wireless Transmitters, Remote Applications, Proprietary Cabling and Mounting, etc. € 55,000 Grand Total € 892,000 Smart Building, Networking, and Renewable Energy cost structure: Category AS/RS & Parking Renewable Energy Description Cost Automated Storage and Recovery System, Automated Parking System, Scanning and Mobility Solution, Workflow Solutions. € 2,170,000 Greywater Treatment & Recycling, Chemical Water Treatment and Discharge, EnergyEfficient Heat Pump Heater/Chiller System, Mission Critical Automation System. € 1,350,000 User Experience Augmented Reality Layer, Interactive Projections, Layered Guided Application for Circuit System, Heritage Discovery and Research, Innovation and Green Technology Social Hub. € 728,000 Networking Cyber-Security Firewalls and Servers, Remote Access Points, Redundant Power Supply and Fiber Optic Connection, Military-grade Encrypted Wi-Fi, Admin and Public Network Separation, etc. € 435,000 Project Management and Contingency cost structure: Project Contingencies Chart Construction % Sums Total Old Building 20% € 30,279,880 € 6,055,976 New Building 15% € 8,229,300 € 1,234,395 Systems 12% € 12,890,000 € 1,546,800 Project Contingencies as per the above chart € 8,837,171 Total Contingencies Project Grand Total € 60,236,351 End of “NEW MNIR” DESIGN COMPETITION estimation and cost structure.