Download (LAN) and WIDE AREA NETWORK (WAN) FOR THE TANZANIA

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts
no text concepts found
Transcript
ANNEX TO THE TERMS OF REFERENCE
INSTALLATION OF LOCAL AREA NETWORK (LAN) and WIDE AREA NETWORK
(WAN) FOR THE TANZANIA BUREAU OF STANDARDS
CURRENT INFRASTRUCTURE
Current Network Structure
1
List of existing network equipment to be replaced
No
Location
Description
Status
1.
Administration block
2No Cisco C2960-
Obsolete
(Wing 1)
24TT
Administration block
Cisco C2960-24PC
Obsolete
(Server Rm, Wing 2)
Dlink DES1016D
Unmanaged, obsolete
MikroTik Router/
Unknown, ISP managed
2.
Firewall
3.
Reception/Library
Dlink DES1024D
Unmanaged, obsolete
4.
Textile Lab
Dlink DES1024D
Unmanaged, obsolete
Dlink DES1008D
Unmanaged, obsolete
5.
Food Lab
Dlink DES1016D
Unmanaged, obsolete
6.
Metrology Lab
Cisco C2960-24TT
Obsolete
Ubiquiti UniFi AP
Unmanaged
7.
Chemistry Lab
Dlink DES1008D
Unmanaged, obsolete
8.
PTC
Dlink DES1016D
Unmanaged, obsolete
9.
Materials Testing Lab
UniFi Outdoor AP
Unmanaged
10.
Cotton Lab
Ubiquiti UniFi AP
Unmanaged
11.
Technical block
Cisco C2960-24TT
Obsolete
2No UniFi Outdoor AP
Unmanaged
Dlink AP
Unmanaged
2
DELIVERABLES
Proposed Network Structure
3
Proposed Network Components
4
Proposed WAN and Internet Service
5
Proposed Network BOM
Item
Description/Product Code
Qty
Structured Cabling
42U wiring closet
APC 42U, 19” ventilated lockable
Wiring Closet With 2 PDU (10 BS1363
Sockets each)
1
12U Wiring Closets
12U wall mount wiring closets
4
Fibre Patch Panels
24 port Optic Fibre patch panel,
complete with SC fibre adapter
terminations
2
Fibre Patch Panels
12 port Optic Fibre patch panel,
complete with SC Fibre adapter
terminations
10
UTP patch panels
24 port cat6 RJ-45 19” rack mount
patch panels with all components for
terminating UTP cables
15
Cable management
1U cable managers
15
Optic Fibre cable
8 core outdoor/indoor 50/125µm
multimode optic fibre cable (about
300m roll)
UTP cable
Cat6 UTP cable with LSZH insulation,
complying with TIA/EIA 568B cabling
standard, plenum rated (for 200 dual
RJ45 outlets, about 30m links each) 305m rolls
40
Network Outlets
Cat6 dual RJ45 outlets
200
Fibre patch cords
3m SC-LC 50/125µm duplex fibre
patch cords
40
UTP patch cords
Cat6 3m UTP patch cords
300
UTP patch cords
Cat6 1m UTP patch cords
300
Grounding wire
2.5mm earthing cable (green
insulation)
100
Cable pathways
200mmX50mm 3-compartment
skirting PVC wall trunking for data and LOT
electrical wiring.
4
Active Components
Core Switches
Cisco C3750X-12S-E
Fibre transceiver modules
GLC-SX-MM
34
Access Switches
Cisco C2960X-24PS
11
6
2
Unit Cost
(US$)
Total Cost
(US$)
HQ Firewall/VPN
Cisco ASA5512-K9
1
ICO Firewall
Cyberoam 35iNG
1
WAN Connectivity
Installation
1
Power Infrastructure
UPS
3 phase 20KVA Double conversion
Online UPS
2
Electrical wiring from 2No Distribution
Boards to 100No 16A, 240VAC twin
non-standard UPS power sockets,
complete with non-standard 3-pin top
plugs, mounted flush on trunking.
LOT
Solarwinds Orion Network
Performance Monitor (NPM): supply,
installation and configuration
1
Other Costs
NMS Solution
Grand Total
7
Proposed server equipment
Quantity
I
2
HP Proliant DL380p-G8 Intel® Xeon® E5-2609 t(2.4GHz/4-core /10MB/80W), 16GB (2x8GB), P420i/512MB
e
FBWC, 4x300GB SAS HDD,
DVD-RW, 1x460W, USB Keyboard and mousem
s
APC Smart-UPS 1500VA USB & Serial 230V, 670 watts/ 2200 VA, input 230V/output 230 V, interface port
DB-9-RS-232 smart slot, usb.
1
Server cabinet -42U 600X1000
1
Cyberoam Firewall - (Model - CR50ia
6 GbE ports, 750 Mbps Firewall Throughput, 125 Mbps UTM Throughput
1
Cyberoam Total Value Subscription -1 year
1
Kaspersky -End point Point Business space Antivirus
1
0
1
4port KVM switch to connect 2 servers to one monitor and keyboard and mouse
18.5' TFT monitor to be installed in the cabinet
Warranty
Delivery Time
Installation
1
Not less than 5
years
4
weeks max
To be done at the
site
8
Related documents