PROJE ADI / PROJECT NAME TESTING & COMMISSIONING CENTRIFUGAL PUMP Building Manufacturer Model No Pump No. Serves Location Item Check the following 1.0 Equipment Pre-Start Inspection 1.1 1.2 1.3 Unit installed per specifications and manufacturers instructions Mountings checked (shipping bolts removed) Vibration isolators installed 1.4 1.5 1.6 1.7 1.8 1.9 Flex connectors installed on supply & return Sufficient access to motor & coupling Coupling guard installed Shaft and bearings aligned. 1.10 1.11 1.12 1.13 1.14 1.15 Fan rotates freely Motor and pump lubricated Electrical connections completed Starter overloads are correctly set Disconnect switch installed Fuses installed (correct size) Internal links and starters are correct. 1.16 1.17 1.18 1.19 1.20 1.21 Result Motor tight, level and aligned Impeller and shaft rotates freely Control circuit logic and starter operation is tested before motor is rotated Covers installed on electrical and control panels Design voltage available on each phase Water piping complete.. Local valves set for normal operation 1.22 Pressure gauges installed on supply & return 1.23 Pump flow direction is correct 1.24 System filled with water 1.25 Mechanical room clean for start-up Comments 2.0 System Pre-Start Inspection 2.1 2.2 2.3 2.4 2.5 2.6 Water system flushed and leak tested Water system filled and vented. 2.7 2.8 All motor operated valves in manual open to ensure initial system flow All isolating and regulating valves are fully open CX-0009 Water treatment installed Strainer baskets are installed and clean Expansion tank ball valve is operational Cold water feed valve is open and all vents clear Yayın Tarihi: Rev. Tarihi: Rev. No.: PROJE ADI / PROJECT NAME TESTING & COMMISSIONING CENTRIFUGAL PUMP Building Manufacturer Model No Pump No. Serves Location Item 2.9 2.10 2.11 2.12 Check the following Result All by-pass and normally closed valves are closed Pump suction and return valves are open Standby pump isolating valves are closed Pump casing is vented 2.13 Pump discharge valve/flow valve is 50% closed to limit initial start current Comments 3.0 Initial Equipment & System Start-up 3.1 Direction and rotation speed of motor shaft is 3.2 3.3 3.4 3.5 3.6 3.7 Motor, pump and drive are free from vibration Motor amps (specify rated & actual) Motor volts (specify rated & actual) Motor and bearing are not overheating There is no seepage of lubricant from the housing Reduced speed and motor running currents are correct on multi-speed motors 3.8 Pump status indicators verified (local & remote) Comments 4.0 4.1 4.2 Run-in Period Fuses, switchgear and motor not overheating Pump pressure developed doesn’t exceed system design pressure 4.3 Gland nuts adjusted to give correct drip rates 4.4 Strainers inspected and cleaned 4.5 There is no vibration transferred to the piping system or structure Comments Vendor Sub-Contractor Name & Surname Date Signature CX-0009 Yayın Tarihi: Rev. Tarihi: Rev. No.: