Active Market Rule Amendment Tracking Report
MR_NO
MR-00297
MR-00300
MR-00329
MR-00338
Subject
Outage
Coordination
Facility
Registration
Ancillary
Services
Interjurisdictional
Trading
MR Title and Description
IESO Processing of Market Participant De-Rate
Submissions
Amendment submission from market participant. IESO
should be obligated to promptly process facility de-rate
submissions so that market and dispatch decisions are
done on basis of actual facility capability.
Renewable Energy Supply Contracted Self-Scheduling and
Intermittent Generation
Market rule amendments required to facilitate market entry
and participation by renewable generation that are awarded
RES contracts through OPA. These generators are
required, under the RES contract, to be market participants
and to be either self-scheduling or intermittent. Current
market rules regarding allowable facility capacity and
dispatch data submissions may be unreasonable barriers to
market entry and participation.
Technical Panel
Determination
Amendment
Submission
Warrants
Consideration
9-Aug-05
A
Technical Panel
Review of Draft
Amendment
Proposals
TBD
Date Technical
Panel Vote to
Recommend
Amendment
Proposal
TBD
Stakeholder Review
& Written Comment
on Draft
Amendment
Proposal
TBD
Date IESO Board
Approve
Amendment
Proposal
TBD
Implementation
Date
TBD
MR-00341
MR-00342
Revenue
Metering
Administration
Revenue
Metering
Priority
(High, Medium, Low)
High
Category
(General, Urgent,
Minor)
General
Update provided to
TP 216 (8 Jul 08):
TBD
Eliminate Minimum Requirement for Regulation/Automatic
Generation Control
Remove market rule requirement for IESO to have at least
+/- 100 MW of AGC with a ramp rate of 50 MW/min.
Market rules should, where possible, be objective rather
than prescriptive. Also, these requirements increase cost of
procurement of AGC and restrict more flexible contracting
that could encourage new suppliers and increase
competition.
7-Nov-06
Economic Dispatch of Linked Wheels
16-Oct-07
TBD
A
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
To be determined
TBD
TBD
TBD
Scope of market rule
and other changes
required to facilitate
market entry and
participation to
determined through
IESO Stakeholder
Engagement process
(SE-15).
Active
Medium
General
Medium
General
Low
General
Low
General
High
General
T
IESO conducting
additional analysis
and consultation with
stakeholders on
impact of AGC
requirements. Results
expected summer
2008. Refer to
St k h ld
Stakeholder
Engagement Plan 33
(SE-33)
A
TBD
T
TBD
T
TBD
T
TBD
T
TBD
T
Amendment submission from Silverhill Inc. Issue that
current requirements for linked wheels (simultaneous
import to Ontario and export from Ontario by same MP) to
offer and bid at ±MMCP exposes MP to significant financial
risk, negatively impacts reliability and efficiency of market
MR-00339
Status
(Active, On Hold,
Closed)
Notes on current
status
Active
Active
Update provided to
TP 215 (10 Jun 08)
regarding design
elements and issues,
IJT feedback.
Temporary No-Load Energization of Facilities without
Registered Wholesale Meter
Authorize IESO to permit no-load energization of stepdown transformer for commissioning purposes.
16-Oct-07
Incorporate Compliance Sanctioning Guidelines
Framework
Incorporate the financial penalty matrix and criteria for
determining final penalty amount from the published MACD
Guidelines for penalties above 10 k& and less than 1
million$.
Toronto Hydro High Voltage Revenue Metering
27-Nov-07
A
TBD
T
TBD
T
TBD
T
TBD
T
TBD
T
Active
TP 206 (16 Oct 07)
determined
amendment
submission warranted
consideration.
Amendment proposal
under development.
A
23-Apr-08
10-Jun-08
A
T
1 May 08 to
22 May 08
A
10-Jun-08
A
19-Jun-08
A
10-Sep-08
T
Co-incident
with Baseline
20.0.
18-Dec-07
A
26 Feb 08
18 Mar 08
23 Apr 08
10 Jun 08
A
A
A
T
1 May 08 to
22 May 08
A
10-Jun-08
Amend market rules to permit high voltage revenue
metering for more than one connection point.
A
19-Jun-08
A
10-Sep-08
Co-incident
with Baseline
20.0.
Active
Approved by IESO
Board 19 Jun 08.
T
Active
Approved by IESO
Board 19 Jun 08.
TBD = To be determined
7 Aug 08
A = Actual Date
T = Target Date
Page 1 of 2
Active Market Rule Amendment Tracking Report
MR_NO
MR-00343
Subject
Dispute
Resolution
MR Title and Description
Dispute Resolution for Market Manuals
Technical Panel
Determination
Amendment
Submission
Warrants
Consideration
23-Apr-08 A
Technical Panel
Review of Draft
Amendment
Proposals
23-Apr-08 A
8-Jul-08
A
Date Technical
Panel Vote to
Recommend
Amendment
Proposal
8-Jul-08
A
Stakeholder Review
& Written Comment
on Draft
Amendment
Proposal
1 May 08 to A
22 May 08
Date IESO Board
Approve
Amendment
Proposal
5-Sep-08
T
Amendment submission from OPG. Requests that market
rules be amended to clarify application of dispute resolution
provisions to disagreements between IESO and market
participant over market manuals.
MR-00344
General
MR-00345
Reliability
Minor Amendment Omnibus 2008
Make a number of minor market rule amendments that
have been identified by IESO staff and stakeholders over
the past 18 months.
Align Market Rule Definitions with Bill 44
Co-incident
with Baseline
20.1
23-Apr-08
A
23-Apr-08
A
13-May-08
A
13-May-08
10-Jun-08
A
T
N/A
A
23-Apr-08
A
19-Jun-08
A
15-May-08 to A
5 Jun-08
10-Jun-08
A
19-Jun-08
A
10-Sep-08 T
Coincident
with Baseline
20.0
18-Jul-08
A
T
22 days after
publication of
approved
amendment.
10-Dec-08 T
Amend definitions of "reliability standards" and "standards
authority" to align with Bill 44.
MR-00346
Demand
Response
Eliminate Hour-Ahead Dispatchable Load (HADL) Program
Implementation
Date
10-Dec-08 T
12-Aug-08
T
12-Aug-08
T
14 Aug 08 to 4 T
Sep 08
12-Aug-08
T
5-Sep-08
Eliminate HADL as it is no longer used, is effectively
superseded by OPA DR1 program and to save IESO costs
to upgrade settlement systems.
MR-00347
Interj i di ti
l
jurisdictional
Trading
Market Uplifts for Linked Wheel Transactions
12-Aug-07
T
TBD
TBD
TBD
TBD
TBD
Amendment submission from Constellation Group
suggesting that linked wheel transactions should not be
charged the same market uplifts as pure exports
MR-00348
Day-Ahead
Commitment
Process
MR-00349
Day-Ahead
Commitment
Process
Status
(Active, On Hold,
Closed)
Notes on current
status
Active
Priority
(High, Medium, Low)
TBD
Category
(General, Urgent,
Minor)
TBD
Low
Minor
High
General
TBD
TBD
TBD
Amendment
submission and draft
amendment proposal
to TP 217 for
consideration and
conditional
recommendation.
TBD
TBD
TBD
Technical Panel (TP
216) recommended
amendment proposal
to IESO Board for
approval.
Active
Approved by IESO
Board 19 Jun 08.
Closed
Approved by IESO
Board 19 Jun 08.
Amendment
submission to TP 217
for consideration.
Enhanced DACP - 24 optimization and 3-part bidding
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
Market rule amendments required to incorporate 24-hour
optimization, three-part bidding in DACP process.
Enhanced DACP - Guarantees
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
Market rule amendments required to establish production
cost guarantees and other guarantees into the DACP.
TBD = To be determined
7 Aug 08
A = Actual Date
T = Target Date
Page 2 of 2