Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Changes to Economic Load Response Program Applications The Shutdown cost associated with a Load Response bid will be changed to biannual values instead of daily. Shutdown costs will apply to two biannual periods. Period 1 is effective from April 1 to September 30. Period 2 is effective from October 1 to March 31. Once a period becomes effective, the associated shutdown cost cannot be changed. Day Ahead Load Response Bidding Since Period 1 is the active period, registered market participants that are entering Day-Ahead Load Response bids for the Economic Load Response Program should provide PJM with the valid shutdown costs by 1600 on Tuesday, June 25. If no shutdown cost is provided, the cost will default to 0 for Period 1. Participants that register for the Economic Load Response Program after June 25, must also provide shut down cost information or the shut down cost value will default to 0. Please send all shutdown cost information to Lynn Horning ([email protected]). Participants can change the Shutdown Cost for Period 2 through September 30. The Period 1 and Period 2 Shutdown Costs are entered and viewed in the Load Response Daily page in eMKT. The XML Modify and XML Query for the Load Response Daily information have been changed to reflect the biannual shutdown costs. Please go to http://www.pjm.com/training/twoset/downloads/external_specs.pdf for the latest External Interface Specification Guide for eMKT. This change to eMKT will take effect on Wednesday, June 26, 2002 at 0900. Real Time Load Curtailment For those Economic Load Response participants that wish to curtail load in real time or wish to be dispatchable in real time, and do not wish to bid into the Day Ahead market, operational information is submitted at the time of Registration via the Load Response Program Application in eSuites. Since Period 1 is the active period, registered market participants that are entering Load Response real time operational information for the Economic Load Response Program should provide PJM with the valid shutdown costs by 1600 on Tuesday, June 25. If no shutdown cost is provided, the cost will default to 0 for Period 1. Participants that register for the Economic Load Response Program after June 25, must also provide shut down cost information or the shut down cost value will default to 0. Please send all shutdown cost information to Lynn Horning ([email protected]). Participants can change the Shutdown Cost for Period 2 through September 30. The Period 1 and Period 2 Shutdown Costs are entered and viewed in the Load Response Registration Detail page in the Load Response Program application. This change to the Load Response Program application in eSuites took effect on Wednesday, June 12, 2002 at 1630.