Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Proposal Note 205 Temporary Sediment and Erosion Controls with Prices - 2/12/03 General: Proposal Note 205 provides the unit prices to be used in conjunction with Supplemental Specifications 832 and 833. Further, this proposal note explains Item 832 Lump Sum Erosion Control which is found in the quantity pages and defines Item 832 Storm Water Pollution Prevention Plan. Item 832 Lump Sum Erosion Control: The bidder will note that a fixed amount has been established by the Department for this item. The fixed amount is a lump sum that shall be included in the bidder’s total bid amount for this project. The fixed amount entered by the Department for this item is an estimate of the total cost of the Temporary Erosion Control Best Management Practices work required to be performed for this project. Item 832 Storm Water Pollution Prevention Plan: The bidder will note that this item must be bid by the bidder as an as Each Item. The amount entered by the bidder must reflect the cost of this item, in addition to overhead and profit, to the bidder when performing this item. In the event that no Storm Water Pollution Prevention Plan is required, the bidder shall bid $1.00 in order to avoid a blank bid. An entry of zero dollars is not acceptable to the Department. When a Storm Water Pollution Prevention Plan is found not to be required, the Department shall non-perform this item. This item is exempt from the non-performance table found in Section 104.02 of the Construction And Material Specifications. The Department will make payment to the Contractor after the plan has been reviewed. Only one Storm Water Pollution Prevention Plan shall be submitted by the Contractor for each project awarded. All work required by this proposal note and the Supplemental Specifications 832 and 833 shall be contained in that plan. Revisions to the plan may be made by the successful Contractor. Those revisions made, but not caused by the Department, shall be the financial responsibility of the Contractor. Those revisions to the accepted Storm Water Pollution Prevention Plan caused by the Department will be paid by the Department as part of the revised work. Items to be Included in Total Bid Amount: Both, Item 832 Lump Sum Erosion Control and Item 832 Storm Water Pollution Prevention Plan shall be added to the bidder’s total bid amount in order to produce a total project bid amount. Erosion Control Item Unit Prices: Listed below are the Erosion Control Item unit prices. The payment due for the properly installed Erosion Control Items will be calculated using these unit prices times the properly installed Erosion Control Item unit. Then these amounts will be deducted from the lump sum fixed amount provided by the Department in the bid proposal for Item 832 Lump Sum Erosion Control. When the temporary Sediment and Erosion Control Best Management Practices work exceeds the fixed amount provided by the Department, the remaining work required by this item still will be paid by the Department pursuant to the below listed unit prices. These prices are fixed for the duration of this project. Additionally, all Temporary Erosion Control Best Management Practices will be performed at these below listed unit prices. English Temporary Sediment and Erosion Control Prices Item Unit Description Prices 832 832 832 832 Square Yard Foot Cubic Yard Foot Construction Seeding and Mulching Slope Drains Sediment Basins and Dams Perimeter Filter Fabric Fence $0.46 $7.00 $2.80 $1.70 832 832 832 832 832 832 832 Foot Foot Foot Cubic Yard Square Yard Square Yard Cubic Yard $4.50 $4.00 $8.00 $1.50 $1.10 $1.00 $32.00 832 Cubic Yard 832 832 Cubic Yard Foot Bale Filter Dike Filter Fabric Ditch Check Inlet Protection Dikes Construction Ditch Protection Construction Slope Protection Rock Channel Protection Type C or D with Filter Rock Channel Protection Type C or D without Filter Sediment Removal Construction Fence $30.00 $2.80 $3.80 Metric Temporary Sediment and Erosion Control Prices Item Unit Description Prices 832 832 832 832 Square Meter Meter Cubic Meter Meter Construction Seeding and Mulching Slope Drains Sediment Basins and Dams Perimeter Filter Fabric Fence $0.46 $21.00 $2.80 $5.10 832 832 832 832 832 Meter Meter Meter Cubic Meter Square Meter Bale Filter Dike Filter Fabric Ditch Check Inlet Protection Dikes Construction Ditch Protection $4.50 $12.00 $24.00 $1.50 $1.10 832 832 832 832 832 Square Meter Construction Slope Protection Cubic Meter Rock Channel Protection Type C or D with Filter Cubic Meter Rock Channel Protection Type C or D without Filter Cubic Meter Sediment Removal Meter Construction Fence $1.00 $32.00 $30.00 $2.80 $11.40 Designer Note: This PN Note, SS 832, and SS 833 replaces 2002 CMS 207 or SS 877. Provide this proposal note on all plans that have Project Identified earth-disturbing activities, as defined as, any activity that exposes bare ground or an erodible material to storm water and anywhere CMS Item 659 Seeding, SS 870 Seeding, CMS Item 660 Sodding, or SS 870 Sodding is being furnished. Delete all 2002 CMS 207 Items and all SS 877 Items Provide SS 832 and SS 833 with this proposal note. Provide under the Erosion Control Heading the following Reference Items: Item 832 Lump Sum Erosion Control. Item 832 Each Storm Water Pollution Prevention Plan. Provide a encumbered dollar value to be placed in the proposal for the Item: 832 Lump Sum Erosion Control. This amount should only be provided in the C2 Estimate and in the Special Considerations Field on the Plan Package Submittal Form and not in the plans. For additional guidance see the NPDES Construction Permit Implementation Plan flowchart on the Office on Production website.