Survey
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
Technical Training Service Section Technical Training Good Installation Practices Technical Training Good Air Conditioning Installation Practices Good Installation Practices Contents • Location of installation • Piping • Cleanliness Technical Training • Electrical • Refrigerant Circuit Good Installation Practices Technical Training Location of Installation Good Installation Practices Location of Installation Technical Training Indoor unit • Ceiling too high Good Installation Practices Location of Installation Technical Training Indoor unit • Unit installed in an enclosed area Good Installation Practices Location of Installation Technical Training Indoor unit • Dirty or chemically hazardous environment Good Installation Practices Location of Installation Technical Training Indoor unit • Avoid high electrical interference environment ( infra red bar code scanning machine, lighting with electronic ballast) Good Installation Practices Location of Installation Technical Training Indoor unit • No service opening Good Installation Practices Location of Installation Technical Training Indoor unit • Duct work too short Good Installation Practices Location of Installation Outdoor unit • Select a suitable installation site Technical Training A place where …... …… Easy for service Good Installation Practices Location of Installation Outdoor unit • Select a suitable installation site Technical Training A place where …... …… Comply to installation clearance Good Installation Practices Location of Installation Outdoor unit • Select a suitable installation site Technical Training A place where …... …… Do not block the air discharge Good Installation Practices Location of Installation Outdoor unit • Select a suitable installation site Technical Training A place where …... …… The return air is not short cycle Good Installation Practices Location of Installation Outdoor unit • Select a suitable installation site Technical Training A place where …... …… To avoid strong wind Good Installation Practices Location of Installation Technical Training Drainage • A proper drainage system is crucial Good Installation Practices Location of Installation Technical Training Drainage • A proper drainage system must be sloped Good Installation Practices Location of Installation Technical Training Drainage • Beware of where it ends Good Installation Practices Location of Installation Technical Training Drainage • Proper length is crucial Good Installation Practices Technical Training Piping Good Installation Practices Piping Technical Training • Keep the piping as short as possible Good Installation Practices Piping • Provide oil traps if height of installation exceed 10m Technical Training Condenser Condenser 10m 5m Evaporator Good Installation Practices Evaporator Piping Technical Training • Insulate the pipe and insulate it separately Good Installation Practices Piping Technical Training • Bend the pipe using pipe bender instead of hands. Good Installation Practices Piping • Do not size up or size down the pipe (especially for heatpump model) > Pipe size up - refrigerant velocity down Technical Training > Pipe size up - more refrigerant needed - refrigerant floodback > Pipe size up - dilution of oil Good Installation Practices Technical Training Cleanliness Good Installation Practices Cleanliness Technical Training • Do not expose pipes or components to environment over an prolong period. Good Installation Practices Cleanliness Technical Training • Keep moisture out of pipes or components Good Installation Practices Cleanliness Technical Training • When laying pipes through walls, end of pipes must be properly sealed Good Installation Practices Cleanliness Technical Training • When cutting a copper pipe, use copper cutter instead of saw. Good Installation Practices Cleanliness Technical Training • Always vacuum before charge in refrigerant Good Installation Practices Cleanliness Technical Training • Always braze with present of nitrogen Good Installation Practices Technical Training Electrical Good Installation Practices Electrical Technical Training • Remote control wiring should be separated from power cable Good Installation Practices Electrical Technical Training • Screw must be tight at terminals Good Installation Practices Electrical • Examine the power source Technical Training • Determine the maximum load the power source can handle Good Installation Practices Technical Training Refrigerant Circuit Good Installation Practices Refrigerant Circuit • Proper leak check • Properly charge the system • For no pre-charge system which is using scroll compressor, must contain 80% charge before start Technical Training • For system that using TXV, make sure the TXV is properly installed Good Installation Practices Technical Training Thank you Good Installation Practices