Tramwave: la soluzione senza catenaria
di AnsaldoSTS - la prima applicazione
commerciale in Cina a Zhuhai
TramWave
Ansaldo STS catenary-free solution
Operating Principle
Groud-level module’s steel contact plate
Veichle body
Train boogie
power collector
The steel plates in contact with the
power collector are the only one
energized
Operating Principle
TramWave: main benefits for sustainable
urban mobility
• Make the urban context more liveable, removing the visual impact of overhead catenaries
and poles from squares, buildings, monuments, historical areas, etc…
• Continuous power transmission from contact line to vehicles without any interruption/charging
times (for both traction and auxiliaries)
• No need of on-board big and heavy storage energy systems (supercapacitors)
• No need of electronic or induction devices
• The closing of the traction electric circuit doesn’t foreseen the use of the tracks  no more
problem due to the effects of stray currents, preserving the underground utilities (water and
gas pipelines, electricity network underground cables, etc…) and the rails from electrolysis
effects  less maintenance costs.
• Possibility to have a mixed power-supply system, by mean having Tramwave and traditional
catenaries on the same tramway line (ex. Tramwave in the historical centres and catenaries in
the suburbs), moreover it’s possible to feed with Tramwave rubber tired vehicles like busses
• Regenerative Breaking and energy saving
TramWave: water test
TramWave: resilience test
TramWave Safety Assessment certificate
Installation in Naples
Installation in Naples
TramWave: Zhuhai Line1 Project - China
Customer: CNR Equipment Engineering Co., Ltd.
Phase 1
• 9 km double track
• 14 Stops
• 1 Depot
• 3,378 pphpd in short term (2017)
• 5,402 pphpd in medium term (2024)
• 7,516 pphpd (coupled vehicle) in long term (2034)
• Minimum Headway: 5 min - short term, 3 min medium and long term
• Minimum curve radius: 30 m - mainline, 25 m - depot
• Maximum gradient : 6 %
• Contact Line Voltage: 750 Vdc
• Revenue Service will start on July 2015
TramWave: Zhuhai Line1 Project - China
TramWave: Zhuhai Line1 Project - China