Survey
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
KANAL BANJIR TIMUR SEMARANG PROJECT AREA (1/2) Feasibility Study: ① East Floodway (BKT) including D/D for the Downstream Reach 3 Majapahit Bridge - Estuary Master Plan Study: Babon River ② Penggaron/ ③ Dombo Sayung River ④ Dolok River 2 Majapahit Bridge 1 Candi River Name BKT - Candi - Bajak - Kedung Mundu Babon Dombo-Sayung Dolok Penngaron Kebon batur canal River length (km) 14.6 2.7 3.4 8.1 17.0 19.0 30.4 19.8 3.8 Bajak River Pucanggading Weir Kedung Mundu River 4 Pucanggading 2 PROJECT AREA (2/2) Penggaron River East Floodway Babon River DomboSayung River Detail Of Pucang Gading Weir 3 EXISTING CONDITION (1/6) Gergaji Weir Pecanggading Weir Babon River DomboSayung River Babon River BKT Inlet Gate of BKT Penggaron River DomboSayung River Pucanggading: Inlet Gate of the BKT and Overflow Weirs of 4 the Babon and Dombo-Sayung Rivers EXISTING CONDITION (2/6) JEMBATAN MAJAPAHIT Mid-stream Reach JEMBATAN KALIGAWE Downstream Reach Downstream Reach BKT: Mid-stream and Downstream Reaches EXISTING CONDITION (3/6) Mid-stream Reach Downstream Reach at Pantura Road Babon River: Mid-stream and Downstream Reaches 6 EXISTING CONDITION (4/6) Mid-stream Reach Downstream Reach at Pantura Road 7 Dombo-Sayung River: Mid-stream and Downstream Reaches EXISTING CONDITION (5/6) Dolok River Kebon Batur Canal Dolok River Mid-stream Reach Upstream Reach at Bifurcation to Kebon Batur Canal To Dolok River Downstream Reach near Pantura Road Palayaran Canal along Pantura Road Dolok River: Upstream to Downstream Reach 8 EXISTING CONDITION (6/6) Inlet Gate at the Bifurcation from the Dolok River Downstream Reach Near Penggaron River Kebon Batur Canal: Upstream to Downstream Reaches9 BASIC CONCEPTS I. River System Principle: Treatment of floods within each river system as much as possible. 1) Penggaron River System BKT, Babon, Dombo-Sayung River System 2) Dolok River System 3) Kebon Batur Canal: Stop Inter-basin Flood Transfer To close the inlet sluice gate during floods after completion of the future river improvement of the Dolok River. To open the inlet sluice gate in normal period for water use and environment. II. Design Scale: 50-year Return Period of Flood 10 N Jawa Sea Dombo-Sayung River Dolok River East Floodway (BKT) Babon River BKT Candi River Bajak River Penggaron River System: Utilize the Natural Retarding Basin as it is. River Improvements of the BKT, Babon and Dombo-Sayung Rivers. Dolok River System: Existing River Close the Inlet Gate of the Kebon Batur Canal during floods Legend: Kudung Mundu River Close gate during floods Pecanggading Penggaron River KubonBatur Canal Barang Weir River Major Road Railway Existing Overflow Weir Existing Gated Weir Natural Retarding Basin River Improvement Penggaron RS_Alt-1: River Improvements N Jawa Sea Dombo-Sayung River Dolok River East Floodway (BKT) Babon River Candi River Legend: River Major Road Railway Existing Overflow Weir Existing Gated Weir Natural Retarding Basin River Improvement BKT Bajak River Close gate during floods Kudung Mundu River Pecanggading Penggaron River KubonBatur Canal 260 Barang Weir Design Discharge of 50 Year Return Period (m3/s) Penggaron RS_Alt-1: Design Discharge 12 N Jawa Sea Dombo-Sayung River Dolok River East Floodway (BKT) Babon River BKT Candi River Bajak River Penggaron River System: Strengthening of the Retarding Basin. River Improvements of the BKT, Babon and Dombo-Sayung Rivers. Dolok River System: Existing River Close the Inlet Gate of the Kebon Batur Canal during floods Legend: Kudung Mundu River Close gate during floods Pecanggading Penggaron River KubonBatur Canal Barang Weir River Major Road Railway Existing Overflow Weir Existing Gated Weir Strengthening of the Retarding Basin River Improvement Penggaron RS_Alt-2: River Improvements and Strengthening of the Retarding Basin N Jawa Sea Dombo-Sayung River Dolok River East Floodway (BKT) Babon River Candi River Note: Design discharge of BKT_Alt-2 is set at the same discharge of the Alt-1 for conservative consideration. This is because, although the simulated discharge of Alt-2 in the mid-stream to downstream reaches is smaller than that of Alt-1, timing of joining the discharge from the tributaries cannot be fixed like simulation. Legend: River Major Road Railway Existing Overflow Weir Existing Gated Weir Natural Retarding Basin River Improvement BKT Bajak River Close gate during floods Kudung Mundu River Pecanggading Penggaron River KubonBatur Canal 260 Barang Weir Design Discharge of 50 Year Return Period (m3/s) Penggaron RS_Alt-2: Design Discharge 14 Alternative-1 Upstream of retarding area Penggaron River Discharge Downstream of retarding area 700 Q:660 m3/s Discharge (m3/s) 600 Effect of Natural Retarding Basin V=1.15MCM 500 400 Q:530 m3/s 300 200 100 Alternative-2 0:00 23:00 22:00 21:00 20:00 19:00 18:00 17:00 16:00 15:00 14:00 13:00 12:00 11:00 10:00 9:00 8:00 7:00 6:00 5:00 4:00 3:00 2:00 1:00 0:00 0 Upstream of retarding area Penggaron River Discharge Downstream of retarding area 700 Q:660 m3/s 500 Effect of Strengthening the Retarding Basin V=3.67MCM 400 300 200 Q:390 m3/s 100 0:00 23:00 22:00 21:00 20:00 19:00 18:00 17:00 16:00 15:00 14:00 13:00 12:00 11:00 10:00 9:00 8:00 7:00 6:00 5:00 4:00 3:00 2:00 1:00 0 0:00 Discharge (m3/s) 600 Effect of the Retarding Basin in the Penggaron River BKT: Design Profile, Cross Sections and HWL 16 BKT: Construction Cost (Preliminary Draft) No Item Mid-Stream to Downstream Reach Upstream Reach (River Mouth to (Majapahit Bridge to the Majapahit Bridge) Inlet Gate at Pucanggading) Total (Mil. Rp.) 241.952 4.131 9.678 (Mil. Rp.) 197.961 263.317 7.918 (Mil. Rp.) 439.913 267.448 17.597 1 2 3 Main Civil Work Compensation Cost Engineering Cost (4%) 4 Total (Include compensation cost) 255.761 469.196 724.958 5 Total (exclude compensation cost) 251.630 205.879 457.510 Notes: 1) Cost of Main Civil Works does not include the cost for reconstruction of bridge. The cost of reconstruction of bridge will be included in the final cost. 2) Engineering cost = 4% of (Cost of Main Civil Works) 17 Implementation Program (Preliminary Draft) Year 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Project 1. East Floodway (BKT) 1-1 Downstream Reach (From River Mouth to Majapahit Bridge) 1) Detailed Design 2) Requesting for Budget 3) Procurement of Consultant 4) Procurement of Contractor 5) Land Acquisition and Relocation of Houses 6) Preparation of Disposal Site 7) Construction 1-2 Mid-stream to Upstream Reach (From Majapahit Bridge to the Inlet Gate) 1) Detailed Design 2) Requesting for Budget 3) Procurement of Consultant 4) Procurement of Contractor 5) Land Acquisition and Relocation of Houses 6) Preparation of Disposal Site 7) Construction 18