Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Market Survey Request European Spallation Source ESS AB Visiting address: ESS, Tunavägen 24 P.O. Box 176 SE-221 00 Lund SWEDEN www.esss.se 1. SCOPE The deposition system specified here is primarily intended for producing 10B4C coatings for neutron detectors. In the main, thin aluminum substrate sheets will be 2-side coated with 10 B4C by DC magnetron sputtering. It is prioritized to have a good control over deposition fluxes, substrate temperatures, substrate rotation, film thickness distribution, and film adhesion. The incorporation of impurities in the coatings must be minimized, meaning minimizing the residual gases. The very expensive sputtering targets require high target utilization and a minimized material loss to elsewhere than the substrates. We are therefore looking for a turnkey deposition system that can coat a relatively large number of detector substrate sheets in one run, but at same time can be flexible enough to allow for future detector design modifications. 2. TECHNICAL SPECIFICATIONS 2.1. Introduction In addition to what is mentioned about the scope of the system, there are some features of the system that we consider will be of importance for realizing high quality coatings for our process now and in the near future process developments. It is required that the substrate table is electrically isolated from the rest of the chamber, and connected to an external power supply giving a negative substrate bias in the range from ground to 150 V. The option for Plasma booster etching is needed to allow for good film adhesion on various substrate types. Three-fold substrate rotation is needed to allow for uniform film thicknesses on 2-side coated substrate sheets, typically of size 20 x 80 x 0.5 mm, even when the number of substrates exceeds 500. The large number of substrates to be coated requires a large vacuum volume and easy access to the inner part of the system for quick substrate, target and shield change. Handling must be possible by one (1) person only. A base pressure of 0.01 mPa is needed. After 3 h of pumping and heating to 400 °C, the pressure must be below 0.1 mPa even when the chamber is filled up with 500 substrate sheets. Uniform substrate heating up to 600 °C along the 500 mm height of the volume where the substrates will be mounted is required. The deposition system must feature computer controlled and remote controlled thin film deposition. This gives a high degree of flexibility to custom tailor the coating properties, and assures reproducibility. User-friendly software is needed to easily modify processes, follow depositions in real time, and look for old log data. An automatic check for malfunction of any possible part of the system is requested. A component test before each run minimizes the number of failed runs and the risk of severely breaking parts. 2.2. Specifications The specification concerns a sputtering system including the following items: Description Fulfilled Yes 1. Turn key deposition system Specifications are required 2. The inner space of the deposition chamber shall be at least 600 mm diameter and 700 mm height Specifications are required 3. 8. The chamber walls shall be water cooled for improved background pressure during deposition The chamber must be capable of handling substrates measuring at least 500 mm height and 150 mm width Easy access to inner space of deposition chamber through large doors to allow quick change of targets, substrates, and shields Specifications are required The frame for the sputtering system must be of an open type, allowing for easy access to all parts outside the chamber Chamber walls must be covered with shields that easily can be removed, sandblasted and remounted, for best possible background pressure over time Shield change must be possible to be done by one (1) person within 1 h 9. Change of all targets by user must be possible within 20 min maximum 10. Venting, sample change, and restart of pumps must be possible within 30 min maximum The system must be equipped with at least four (4) 500 mm height magnetron sources compatible with DC sputtering at pressures up to 3 Pa Four DC magnetron power supplies capable of delivering at least 800 V and 10 kW The cooling of magnetrons must be monitored by water flow gauges and be interlocked in case of malfunction The power supplies shall be capable to run in constant current, constant voltage and constant power modes. Automatic arc suppression shall be included The target size and shape must be possible to modify and, The target utilization must be maximized Specifications are required Every magnetron shall have a computer controlled shutter 4. 5. 6. 7. 11. 12. 13. 14. 15. 16. 17. Plasma booster etching for enhanced film adhesion Optional for future upgrades No 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. 38. 39. Three (3) fold azimuthal rotation of the substrate is required. It must be possible to vary continuously in the range 0.5 – 3 rpm. Specifications are required It must be possible for one (1) person to change substrates It must be possible to fit at least 500 substrate sheets (each 20 x 80 mm2) in one deposition run and have them uniformly coated (± 15% in thickness along the target height an ± 2% orthogonal to that) on two (2) sides simultaneously. Specifications are required Compatible with possibility for operation with spare substrate tables It must be possible to apply a negative bias voltage of up to 150 V DC during simultaneous heating and rotation of the substrate Uniform substrate heating up to 600 °C along the 500 mm height is required Temperature uniformity up to 600 °C during a 20 h period At least one (1) viewing window with shutter must be included, from which it must be possible to see the target surface and substrates during heating and deposition The deposition chamber must be designed for an ultimate pressure of 0.01 mPa A pressure of 5 mPa must be reached within 20 min from closing the chamber A pressure of < 0.1 mPa at 400 °C must be reached within 3 h when chamber is filled with 500 substrate sheets A venting valve for dry N, He, Ar gas or air must be implemented with the system A gas manifold for four (4) sputter gases must be included (Ar, N plus two spares) Mass flow controllers must be included for Ar, N and two spares providing pressures of 1.3 Pa, 1.3 Pa, and 3 Pa, respectively, with the proposed pumping system Port for possibility of optional use of a Residual gas analyser and mass spectrometer The pumping system must be able to handle sputtering pressures between 0 - 4 Pa It must be possible to regulate the sputtering gas pressure with a precision of 10 mPa The deposition chamber must be equipped with necessary pressure gauges for accurately measuring the pressure in the chamber at all times, including during pump-down The sputter gas pressure must be measured and controlled with a capacitance gauge To allow for quick cool down after deposition, it must be possible to let in gases like He or N during cooling Computer control of the pumping speed Necessary valves between the deposition chamber and the pumping system, to automatically prevent back streaming at power failure or backing pump failure, shall be included 40. 41. 42. 43. 44. 45. 46. All necessary electronics, cables, connectors, controllers to pumps and magnetrons, instrumentation for pressure gauges must be supplied integrated in the system Computer control and computer remote control of the system must be possible Automatic check for malfunctions in all parts of the system (with warning/process abort) before and during every process A computer shall be able to interface with all major parts on the deposition system (pressure gauges, valves, pumps, mass flow controllers, water circuits, cooling system, power supplies, source shutters, gas tank pressures, and substrate heater) It must be possible to log data in a standard format, and in real time monitor the following parameters: Magnetron powers, currents, voltages, and arc counter, substrate bias voltage, substrate temperature, substrate rotation, process/background pressure, gas flow, and water flow It must be possible to define and modify processes by the user in a user-friendly software It must be possible to follow on-going processes in real time 3. TECHNICAL ABILITY AND CAPACITY Description Fulfilled Yes No A description of at least one (1) project, where a magnetron sputtering system has been used for the deposition of B4C layers, executed during the past three (3) years, is required. Absence of references will exclude the addressee of this document from the invitation to the public negotiated procurement procedure. Specifications are required 4. DELIVERY & INSTALLATION Description Fulfilled Yes Delivery, installation and commissioning must be done in a maximum term of eight (8) months. All delivered equipment must fit the Swedish electrical system. Specifications are required No 5. DOCUMENTATION Description Fulfilled Yes No Detailed documentation in English of all delivered equipment, dimensions, drawings, components, its operation, maintenance and service must be included and supplied on delivery. Specifications are required 6. TRAINING Description Fulfilled Yes No An on-site introduction to the system and subsequent appropriate training, conducted at the installation site, must be included in the total price. The training must cover all aspects, from general usage to detailed hardware maintenance and troubleshooting as well as all software components. Specifications are required 7. WARRANTY Description Fulfilled Yes No The warranty time for the delivered system must be at least two (2) years from final acceptance of the system and must be a full warranty against defects in material and workmanship. Specifications are required 8. SERVICE Description Fulfilled Yes Three (3) year maintenance including: Yearly check-up of the system Exchange of sealings, oil, etc Exchange of key components (cathodes, heaters, booster, parts of the table) by refurbished parts with one year warranty on exchanged components Qualified service engineers must be available for on-site visits within a period of 24 hours from report 24/7 telephone support service is also required Specifications are required No 9. SUPPORT Description Fulfilled Yes Support for the design of the factory and work flow planning is required Support for the design of substrate sheets holders is required Start-up production assistance is required Specifications are required No