Download Tivoli Workload Scheduler: Troubleshooting Guide

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Document related concepts
no text concepts found
Transcript
If conman stop hangs, kill the conman command. This might impact the plan
distribution because it stops the agents left running before distributing the new
Symphony.
The previous Symphony file and Symnew file have the same
run number - AWSBHV082E
If SwitchPlan stdlist shows the following messages:
STAGEMAN: AWSBHV082E: The previous Symphony file and Symnew file have
the same run number. They cannot be merged to form the new symphony file.
Cause and solution: There are several possible causes because the Symphony and
Symnew run numbers have the same values, common causes for this are:
1. MakePlan did not extend the run number in the Symnew file.
2. SwitchPlan ran before MakePlan.
3. The Stageman process ran twice on the same Symnew file without resetting the
plan or deleting the Symphony file.
AWSJCL054E: The command "CONFIRM" has failed.
AWSJPL016E: An internal error has occurred. A global option "confirm
run member" cannot be set.
Cause and solution: These error messages are present when the last step of the
SwitchPlan, that is planman confirm fails. Analyze the SystemOut.log for more
information and rerun planman confirm.
Create Post Reports
Create Post Reports has the following function:
v General post production reports in the job output.
In case of failure:
v Rerun the job if reports are needed.
Update Stats problems
Update Stats has the following functions:
v Runs logman to update job statistics and history.
v Extends the Preproduction plan if it's length is shorter than minLen.
In case of failure:
v Rerun the job or manually run "logman <file> " on the latest schedlog file.
v If it does not run, the statistics and history will be partial. Pre production plan is
updated at the beginning of MakePlan .
How to stop it:
v Kill the job or logman process, the statistics and history will be partial until the
job or logman is rerun.
Miscellaneous problems
The following problems might occur:
140
Tivoli Workload Scheduler: Troubleshooting Guide