Download Wastewater Treatment Plant Improvements, Versailles, KY

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Document related concepts

Sewage sludge treatment wikipedia , lookup

Fecal sludge management wikipedia , lookup

Constructed wetland wikipedia , lookup

Sewage treatment wikipedia , lookup

Secondary treatment wikipedia , lookup

Transcript
WASTEWATER TREATMENT PLANT IMPROVEMENTS, CONTRACT II
VERSAILLES, KENTUCKY
OWNER
City of Versailles
Contact: Jerry Campbell
Telephone: 859-873-3624
ARCHITECT-ENGINEER
Proctor/Davis/Ray Consulting Engineers
800 Corporate Drive
Lexington, Kentucky 40503
Contact: Paul Danheiser
Telephone: 859-223-8000
% SELF PERFORMED: ±75%
PROJECT
This project involved the construction of a 3.0
million gallon per day Extended Aeration
Wastewater Treatment Facility. The project
required construction of a Concrete Influent
Structure, Oxidation Ditches, Final Clarifiers,
Chlorine Contact Basin, RAS/WAS Pump Station,
and Effluent structure. A new Operations Building
and Laboratory were also constructed. In addition
to the new construction, modifications were
performed to the existing plant Influent Structure
to divert the flow to the new Screening Structure.
The existing Primary and Secondary Clarifiers were
converted to Aerated Sludge Holding Tanks.
ENGINEERS ⋅ CONTRACTORS/CONSTRUCTION MANAGERS ⋅ ENVIRONMENTAL CONSULTANTS