Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
seem 6 led trim flange ™ FSM6L-TF NEW CONSTRUCTION ONLY configurations are run specific, please consult factory drawings before beginning installation. focal point key parts lists included hardware Corner Unit power off reflector screw (72010) U - individual power on joiner bulkhead screw (72010) lens tool (A15966-01) (AFFIXED TO HOUSING. ONE PER RUN) attention parts shipped installed mounting bracket assembly S - start of run joiner bracket screw joiner bracket (72009) (A15328-01) (70001) flush lens (17999) joiner bulkhead I - intermediate (A15570-01) (71025) drop lens (18495) E - end of run lens end piece MOUNTING LOCATIONS A B A start of run/individual 5.625" 142.9mm 5.00" 127mm A 6.70" 170.27mm mounting bracket must be secured to structure above. 1/4" - 20 carriage bolt may be supplied by others for greater adjustability. (71024) (A12498) MOUNTING BRACKET MUST BE INSTALLED PRIOR TO DRYWALL (indivudual housings only up to 8’) C A intermediate/end of run housing length A B C 2' 3' 4' 5' 6' 7' 8' 1" 1" 6" 6" 6" 6" 6" 21" 33" 35" 47" 59" 71" 83" 22" 34" 36" 48" 60" 72" 84" mounting location chart is an approximate guide only. Luminaires must be installed by a qualified electrician (check with local and national codes for proper installation). To prevent electrical shock, disconnect electrical supply before installation or servicing. IS0568 Rev. C 2016 ©Focal Point, LLC 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com 1 of 3 CEILING CUTOUT ceiling cutout length = nominal run length minus 5/16" (+/- 1/16") example: 5.75" min 12' run length = 11' 11-3/4" cutout length 6.00" max corner unit must be assembled prior to ceiling installation. 1 2 3 5 6 AVOID ALL CONTACT WITH LED SURFACE, LEDs ARE EASILY DAMAGED! 4 make electrical connections 7 8 REPEAT STEPS 5-7 UNTIL ALL UNITS ARE IN THE CEILING tighten luminaire snug to the ceiling individual installations skip to step 11 Luminaires must be installed by a qualified electrician (check with local and national codes for proper installation). To prevent electrical shock, disconnect electrical supply before installation or servicing. IS0568 Rev. C 2016 ©Focal Point, LLC 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com 2 of 3 11 11 10 9 make electrical connections 12 14 13 FLUSH LENS FLUSH LENS REFERENCE INSTRUCTIONS ON INCLUDED TOOL FOR LENS INSTALLATION. secure reflectors to housing (4 screws per reflector) EMERGENCY 14 SEE BATTERY MANUFACTURER INSTRUCTIONS DROP LENS emergency battery maximum mounting height: 18.00' emergency circuit maximum mounting height: 21.00' DRIVER SERVICE 1 2 3 Contractor is responsible for adequately reinforcing walls and/or ceilings to support luminaire weight. Focal Point, LLC accepts no responsibility for inadequately reinforced walls and/or ceilings. The information contained in this drawing is the sole property of Focal Point, LLC. Any reproduction in part or whole without the written permission of Focal Point, LLC is prohibited. IS0568 Rev. C 2016 ©Focal Point, LLC 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com 3 of 3