Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Document Number: ECP 11-0515c Date: 23/05/2016 SCHNEIDER HV METERING UNIT 3 LIMB TEST FORM Note: This form is based on drawing RMSCH-MU6-N36 Rev F; the terminal, fuse and link designations on units built to earlier revisions may differ. Full Postal Address Import MPAN Export MPAN Substation Name Substation Number Metering Unit Serial No Metering Unit Make Type Schneider MU6-N36 System Configuration 3-PHASE 3-WIRE Current Transformer L1 L3 Location METERING UNIT METERING UNIT Serial Number ** Burden (output VA) ** Accuracy Class VA VA 0.5 0.5 Type WOUND WOUND Available Ratios 400/200/5A 400/200/5A Make ** Ratio Selected A A Pole P1 Facing Distribution System? YES / NO * YES / NO * Voltage Transformer L1 L3 Location METERING UNIT METERING UNIT Serial Number *** Burden (output VA) *** Accuracy Class VA VA 0.5 0.5 Type 3P 3P Available Ratios 11000/6600/110V 11000/6600/110V Make*** Ratio Selected V * Delete as applicable. ** Available from CT label. *** Available from VT label. V THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Version: 1.0 Schneider HV Metering Unit 3 Limb Test Form Document Number: ECP 11-0515c Version: 1.0 Date: 23/05/2016 Voltage Transformer Tests VT Configuration Checks Check metering multi-core cable disconnected () Check correct metering VT ratio selected (terminals 15 to 20) see TABLE 1 below () Ensure label on lid of terminal box matches VT voltage ratio selected () Check 110V auxiliary fuse F1 rating is 2A and continuity () Check VT fuse F2 and F3 ratings are 6A and continuity () Check LV links LK4, LK5, LK6 are installed () TABLE 1 Metering VT Voltage Range Selection Phase Metering VT 11000/110V Common Metering VT 6600/110V L1 E210 (terminal 17) E30 (terminal 16) E110 (terminal 15) L3 E250 (terminal 20) E50 (terminal 19) E150 (terminal 18) VT Insulation Resistance – 1kV Insulation Resistance Tester Check secondary earth link LK6 in place () Measure the insulation resistance of VT primary (HV) winding (L1 to Earth) M Remove secondary earth link LK6 () Measure insulation resistance of VT secondary winding (across LK6) M Replace secondary earth link LK6 () © UK Power Networks 2017 All rights reserved 2 of 6 Schneider HV Metering Unit 3 Limb Test Form Document Number: ECP 11-0515c Version: 1.0 Date: 23/05/2016 VT Phasing Check – Primary Injection Remove fuses F2 and F3 () Remove link LK5 () Check the metering circuit breaker is open () Apply 240/110V ac from an injection test set to the primary (HV) winding, measure each of the secondary (LV) winding voltages and compare to the values in the table below* Primary (HV) Winding Voltage Bushing Secondary (LV) Winding Voltage (measured at fuse/link) L1 – L2 (F2 – LK5) L2 – L3 (LK5 – F3) L1 – L3 (F2 – F3) L1 – L2 V (nominal) V V L2 – L3 V V (nominal) V L3 – L1 V V V (nominal) Replace 6A fuses F2 and F3 () Replace link LK5 () * These voltages are for an injection test set and if a mains supply is used the results may differ. VT Primary (HV) Rated Voltage VT Nominal Secondary (LV) Winding Voltage with 240/110V applied to the Primary (HV) Winding 240V 110V 11kV 2.4V 1.1V 6.6kV 4.0V 1.8V © UK Power Networks 2017 All rights reserved 3 of 6 Schneider HV Metering Unit 3 Limb Test Form Document Number: ECP 11-0515c Version: 1.0 Date: 23/05/2016 Current Transformer Tests CT Insulation Resistance – 1kV Insulation Resistance Tester Check CTs isolated or HV dead () Disconnect CT star point earth (terminal 10) () Measure the insulation resistance (D70 – D90 at terminal 10) M Reconnect CT star point earth (terminal 10) () CT Polarity – Flick Test Open CT shorting-links (terminals 1 and 2) () Check L1 phase CT polarity – D11 at terminal 1 (+ve) to D70 at terminal 10 (-ve) () Check L3 phase CT polarity – D51 at terminal 2 (+ve) to D70 at terminal 10 (-ve) () CT Ratio Check – Primary Injection or Prevailing Load* CT Ratio Primary Current CT Ratio Secondary Current Injected Primary Current* Calculated Secondary Current [A] [B] [C] [D = B / A * C] L1 200A 5A 50 / 100A A A 1-10 A () L3 200A 5A 50 / 100A A A 2-10 A () L1 400A 5A 50 / 100A A A 1-10 A () L3 400A 5A 50 / 100A A A 2-10 A () Phase Term Measured Secondary Current Ratio Correct [E] [E = D] On completion of test ensure correct CT ratio low (200A) or high (400A) as specified by designer is selected () * Delete as applicable. CT Relationship to VT Output at Terminal Box L1 CT associated with L1 voltage ** () L3 CT associated with L3 voltage ** () ** If all CT and VT tests are correct the CT relationship to the VT is proven and the above can be ticked CT Burden Maximum CT burden per phase at metering unit terminal box Maximum CT burden per phase at meter terminal box 1 0.5 VA 7.5 VA 1 The maximum CT burden is based on 20 metres of 12-core 2.5mm2 or 40 metres of 19-core 2.5mm2 copper cable with a resistance of 0.0068 Ω/m at 20oC and a CT rated secondary current of 5A. © UK Power Networks 2017 All rights reserved 4 of 6 Schneider HV Metering Unit 3 Limb Test Form Document Number: ECP 11-0515c Version: 1.0 Date: 23/05/2016 Final Checks Reconnect metering multi-core cable (if disconnected) () If metering multi-core cable is not connected leave CTs shorted – close shorting links (terminals 1 and 2) () Check all covers are secured and appropriate lock fitted to lid () Complete asset data form and submit to ART () Test Equipment Purpose/Make/Type Serial Number Calibration Expiry Date Certification CT and VT calibration certificates attached () All tests completed satisfactorily () Comments Organisation Test Operative Name Date of Tests Test Operative Signature A copy of the completed test form together with the CT/VT calibration certificates shall be placed in a plastic wallet in the metering unit terminal box. A copy of the completed test form together with the CT/VT calibration certificates shall be placed in a plastic wallet in the meter terminal box (for the meter operator). A copy of the completed test form and the CT/VT calibration certificates shall be sent to the relevant ART mailbox ([email protected], [email protected], [email protected]). © UK Power Networks 2017 All rights reserved 5 of 6 Schneider HV Metering Unit 3 Limb Test Form Document Number: ECP 11-0515c Version: 1.0 Date: 23/05/2016 This page is left intentionally blank. © UK Power Networks 2017 All rights reserved 6 of 6 Schneider HV Metering Unit 3 Limb Test Form Document Number: ECP 11-0515c Version: 1.0 Date: 23/05/2016 Figure 1 – Schneider MU6 Metering Unit F1 LK4 F2 LK5 LK6 F3 Figure 2 – Terminal Box with Cover Removed 12 10 Figure 3 – Fuses and Links Figure 4 – Terminal Block Figure 5 – CT Labels Figure 6 – VT Labels Schneider HV Metering Unit 3 Limb Test Form Document Number: ECP 11-0515c Version: 1.0 Date: 23/05/2016 This page is left intentionally blank. Schneider HV Metering Unit 3 Limb Test Form Document Number: ECP 11-0515c Version: 1.0 Date: 23/05/2016