Survey
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
BHARATI VIDYAPEETH COLLEGE OF ENGINEERING RITESH ANAND SWAPNIL MISHRA PROJECT GUIDE : Prof. A. V. SUTAR INTRODUCTION GROUND STATION TEAM WITH IITB “PRATHAM” TEAM MEMBERS INFORMATION ABOUT PRATHAM •DIMENSION 260mm X 260mm X260mm •WEIGHT 10KG •10:30 POLAR SUN SYNCHRONIZED ORBIT •3 MONOPOLE ANTENNA •KILL SWITCH •AUTONOMOUS EXPLODED VIEW OF PRATHAM OBJECTIVE • Low cost Ground Station • TEC (Total Electron Count) TEC :PLOT OF ELECTRON DENSITY WITH RESPECT TO LATTITUDE AND LONGITUDE IS CALLED TOTAL ELECTRON COUNT MAP(TEC). FARRADAY’S LAW ∆ɸ=4.87*10-4*f-2 ʃ ΝΒcosӨ dl ∆ɸ = CHANGE IN ANGEL OF POLARIZATION PLANE Ν = ELECTRON DENSITY B = MAGNETIC FIELD OF EARTH Ө = ANGLE BETWEEN THE MAGNETIC FIELD AND THE DIRECTION OF PROPAGATION OF THE RADIO WAVE. f = FREQUENCY OUR APPROACH Receiving LNA LNA ANTENNA LNA Two crossed yagi antenna Centre frequency 437 MHz and 145 MHz LNA Polarization Circuit Analog to Digital Converter Polarization Circuit Tracking MOUNT Section Control Circuit(PI C µC) ROOF UNIT PC Section BURNING UNIT PC(RTT) LAB UNIT Fully fabricated antenna at centre frequency 437Mhz Fabricated Antenna Fully fabricated antenna at 145 MHz frequency. TRACKING SYSTEMS ARS Rotator TRACKING SECTION MOUNT Control Circuit(PI C µC) ROOF UNIT BURNING UNIT PC(RTT) LAB UNIT ALGORITHM FOR STEPPER MOTOR 1 START ACCESS VARIABLE DELAY= TD/TS ANGLE PER SECOND SA=STEP ANGLE APS=(AOSE-AOSS)/TD EXECUTE DELAY AOSS=ACQUISITION OF SIGNAL START AOSE= ACQUISITION OF SIGNAL END NUMBER OF STEPS PER SECOND NSS=APS/SA TOTAL STEPS TD= TOTAL DURATION NO TS=TS-1 TS= NSS x TD CHECK IF TS=0 YES DELAY RESET END ALGORITHM FOR STEPPER MOTOR 2 START ME= max. elevation AE= ME-0.05ME EXECUTION END CONCLUSION •TEC MAP OF INDIA. •Application of Theory. •Commercial Application of TEC. •Social Goal THANK YOU