Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
EURISOL DS : Status and Future Yorick Blumenfeld IPN Orsay We acknowledge the financial support of the European Community under the FP6 “Research Infrastructure Action - Structuring the European Research Area” EURISOL DS Project Contract no. 515768 RIDS . The EC is not liable for any use that can be made of the information contained herein. EURISOL DS • Major Technical Achievements • Managerial achievements • Proposals for the Future The Main Challenges • Design a 5MW; 1GeV proton driver with additional capability of 200 AMeV deuterons and A/Q=2 Heavy Ions (Task7) ; build and test prototypes of the cavities (task 8). • Design a liquid Hg converter which will accept 5 MW of beam power (task 2). • Design a UCx target which will make the most efficient use of the neutrons produced (task 4). • Evaluate the safety constraints of the above set up (task 5). • Design an efficient multi-user beam distribution system (task 9). • Design a superconducting HI LINAC capable of accelerating (task 6) • Investigate technologies for the instrumentation of the future (task 10) • Provide a conceptual study for a beta-beam neutrino facility (task 12). 132Sn up to 150 AMeV New baseline scheme with extended capabilities • • • • • • 2 injection lines for H,D, He and A/q=2 ions SARAF scheme up to 60 MeV/q IPNO scheme from 60 to 140 MeV/q CEA scheme from 140 to 1000 MeV/u cw beam splitting at 1 GeV (1 line 4 MW + 3 lines 100 kW) Total length of the linac: ~240 m H-,D- RFQ 176 MHz 36 =0.03 =0.047 140 MeV/q 10 =0.09 =0.15 Elliptical 704 MHz 3-SPOKE 352 MHz 60 MeV/q 1.5 MeV/u H+,D+, 3He++ HWR 176 MHz 31 1 GeV/q B stripper =0.65 =0.78 >200 MeV/q D, A/q=2 63 97 4 MW H- 100 kW H+, 3He2+ foil stripper 1 GeV Multiple Extraction •3 splitting stations •4 simultaneous users for cw proton beams: •1 4 MW •3 0100 kW (continuously adjustable) •Unique ability of EURISOL at present EURISOL parallel cw Proton extraction Design of the post-accelerator SPIRAL-2 philosophy : Smoothest beam dynamics (regular FDO lattice, low number of -sections), Modular solution and simple cryostats, Separated vacuum (safety with FP), Warm focusing (easier for alignement), Possibility to insert diagnostics at each period, ease of tuning Main technical requirements: Only 2-gap cavities (high q/A acceptance) Max. accelerating fields 7.8 MV/m Nominal operation for A/Q between 4 and 8 New Target Concept Reactor Type Target Concept Validated by International Advisory Board Double effusion line prototype (E. Bouquerel, L. Penescu ) Bellows Cu body RIB ISOLDE cold FEBIAD MK7 Ion source 1.4GeV protons Heat screen 2 pneumatic valves 2xwater cooled transfer lines 2x20cm containers Conceptual design of 100kW target station Effective dose rate E (Sv/h) • • • • • Underground target position Front-end retracts vertically Hot-cell for target exchange Separator in 3rd level Neighboring hot-cell accessible during run Effective dose rate maps Soil activation! Fragmentation of 132Sn (Preliminary results) Fragmentation of 132Sn on Be D. Perez and D. Dragosavac Management Achievements • Organization of mid-term review (April 2007) • Organization of 3rd Town meeting in association with EURONS • Link with EC concerning financial aspects of annual report and extension of the contract to 31/07/2009 • Start up of EURISOL User Group: Angela Bonaccorso, chair. First workshop Jan. 2008; Charter established; election of executive committee (UEC) in progress • Start-up of Site Investigation Panel : A. Shotter, G. Cuttone, D. Geesaman, A. Mueller, S. Myers. First Meeting Jan. 2008. Mandate Written • Production of brochure for General Public • Defining strategy for the future of EURISOL Financial Situation • Second Pre-Financing has been received and distributed. Third expected next year (no auditing for 3rd year). • Extension will allow the timely use of all resources • Spending in-line with expectations (95%) • Slight overspending in Personnel compensated by under spending in T&S and Consumables Proposal for the Future of EURISOL • EURISOL has made use of EC instruments: 5th framework RTD and 6th framework DS. • Major advances have been achieved and a large community with varied technical expertise has developed and must continue to be nurtured • Full engineering report necessary before Preconstruction phase: No (evident) EC instrument for funding. • We (the EURISOL DS MB) propose to form a EURISOL collaboration consisting of laboratories interested in participating in the continuing effort. Role of the EURISOL Collaboration • Follow the scientific and policy recommendations of NuPECC • Promote and Coordinate the R&D to further EURISOL • Solicit support of the funding agencies, in particular through the NuPNET Eranet, and explore other funding opportunities (EC, intercontinental…) • Interact with the EC >> entry on the ESFRI list. • Goal : Produce a full engineering report for the facility Organization of the EURISOL Collaboration • Collaboration board representing participants >> Elects collaboration chairperson and appoints project leader. • Project office supported by collaboration fee. • Engineering work coordinated by project leader and funded by funding agencies (+ other), preferably coordinated by NuPNET. • Work divided into work packages EURISOL Work Packages (3-5 years) • Management (Project Office) • RIB production: Specific prototyping and tests – – – – Neutron converter in beam Fission target in n flux New target materials; liquid metal direct target Novel beam splitter system… • Prototyping at “intermediate” facilities; linked to EURISOL Net in ENSAR • Documentation and licensing • Infrastructure • Updating the science case : coordinated by EURISOL User group Requests • Very approximate price tag: 2M€/year for 4 years. • We would like the support of NuPECC to implement this plan (and welcome your suggestions). • Collaboration launched by the EURISOL Steering Committee in Nov. 2008 • Startup should be in fall 2009