EURISOL DS : Status and Future
Yorick Blumenfeld
IPN Orsay
We acknowledge the financial support of the European Community under the FP6
“Research Infrastructure Action - Structuring the European Research Area”
EURISOL DS Project Contract no. 515768 RIDS . The EC is not liable for any use
that can be made of the information contained herein.
EURISOL DS
• Major Technical Achievements
• Managerial achievements
• Proposals for the Future
The Main Challenges
•
Design a 5MW; 1GeV proton driver with additional capability of 200 AMeV deuterons
and A/Q=2 Heavy Ions (Task7) ; build and test prototypes of the cavities (task 8).
•
Design a liquid Hg converter which will accept 5 MW of beam power (task 2).
•
Design a UCx target which will make the most efficient use of the neutrons produced
(task 4).
•
Evaluate the safety constraints of the above set up (task 5).
•
Design an efficient multi-user beam distribution system (task 9).
•
Design a superconducting HI LINAC capable of accelerating
(task 6)
•
Investigate technologies for the instrumentation of the future (task 10)
•
Provide a conceptual study for a beta-beam neutrino facility (task 12).
132Sn
up to 150 AMeV
New baseline scheme with
extended capabilities
•
•
•
•
•
•
2 injection lines for H,D, He and A/q=2 ions
SARAF scheme up to 60 MeV/q
IPNO scheme from 60 to 140 MeV/q
CEA scheme from 140 to 1000 MeV/u
cw beam splitting at 1 GeV (1 line 4 MW + 3 lines 100 kW)
Total length of the linac: ~240 m
H-,D-
RFQ
176 MHz
36
=0.03
=0.047
140 MeV/q
10
=0.09
=0.15
Elliptical
704 MHz
3-SPOKE
352 MHz
60 MeV/q
1.5 MeV/u
H+,D+,
3He++
HWR
176 MHz
31
1 GeV/q
B stripper
=0.65 =0.78
>200 MeV/q
D, A/q=2
63
97
4 MW
H-
100 kW
H+, 3He2+
foil
stripper
1 GeV Multiple Extraction
•3 splitting stations
•4 simultaneous users for cw proton beams:
•1  4 MW
•3  0100 kW (continuously adjustable)
•Unique ability of EURISOL at present
EURISOL parallel cw Proton extraction
Design of the post-accelerator
SPIRAL-2 philosophy : Smoothest beam dynamics (regular FDO lattice, low number of -sections),
Modular solution and simple cryostats, Separated vacuum (safety with FP), Warm focusing (easier
for alignement), Possibility to insert diagnostics at each period, ease of tuning
Main technical requirements:
Only 2-gap cavities (high q/A acceptance)
Max. accelerating fields 7.8 MV/m
Nominal operation for A/Q between 4 and 8
New Target Concept
Reactor Type Target
Concept Validated by International Advisory Board
Double effusion line prototype
(E. Bouquerel, L. Penescu
)
Bellows
Cu body
RIB
ISOLDE cold
FEBIAD MK7
Ion source
1.4GeV protons
Heat
screen
2 pneumatic
valves
2xwater cooled
transfer lines
2x20cm containers
Conceptual design of 100kW target station
Effective dose rate E (Sv/h)
•
•
•
•
•
Underground target position
Front-end retracts vertically
Hot-cell for target exchange
Separator in 3rd level
Neighboring hot-cell accessible during
run
Effective dose rate maps
Soil
activation!
Fragmentation of 132Sn (Preliminary results)
Fragmentation of 132Sn on Be
D. Perez and D. Dragosavac
Management Achievements
• Organization of mid-term review (April 2007)
• Organization of 3rd Town meeting in association with
EURONS
• Link with EC concerning financial aspects of annual
report and extension of the contract to 31/07/2009
• Start up of EURISOL User Group: Angela Bonaccorso, chair.
First workshop Jan. 2008; Charter established; election of
executive committee (UEC) in progress
• Start-up of Site Investigation Panel : A. Shotter, G. Cuttone, D.
Geesaman, A. Mueller, S. Myers. First Meeting Jan. 2008.
Mandate Written
• Production of brochure for General Public
• Defining strategy for the future of EURISOL
Financial Situation
• Second Pre-Financing has been received and
distributed. Third expected next year (no auditing for
3rd year).
• Extension will allow the timely use of all resources
• Spending in-line with expectations (95%)
• Slight overspending in Personnel compensated by
under spending in T&S and Consumables
Proposal for the Future of EURISOL
• EURISOL has made use of EC instruments: 5th
framework RTD and 6th framework DS.
• Major advances have been achieved and a large
community with varied technical expertise has
developed and must continue to be nurtured
• Full engineering report necessary before Preconstruction phase: No (evident) EC instrument
for funding.
• We (the EURISOL DS MB) propose to form a
EURISOL collaboration consisting of
laboratories interested in participating in the
continuing effort.
Role of the EURISOL Collaboration
• Follow the scientific and policy
recommendations of NuPECC
• Promote and Coordinate the R&D to further
EURISOL
• Solicit support of the funding agencies, in
particular through the NuPNET Eranet, and
explore other funding opportunities (EC,
intercontinental…)
• Interact with the EC >> entry on the ESFRI list.
• Goal : Produce a full engineering report for the
facility
Organization of the EURISOL Collaboration
• Collaboration board representing participants
>> Elects collaboration chairperson and
appoints project leader.
• Project office supported by collaboration fee.
• Engineering work coordinated by project leader
and funded by funding agencies (+ other),
preferably coordinated by NuPNET.
• Work divided into work packages
EURISOL Work Packages (3-5
years)
• Management (Project Office)
• RIB production: Specific prototyping and tests
–
–
–
–
Neutron converter in beam
Fission target in n flux
New target materials; liquid metal direct target
Novel beam splitter system…
• Prototyping at “intermediate” facilities; linked to EURISOL Net in ENSAR
• Documentation and licensing
• Infrastructure
• Updating the science case : coordinated by EURISOL
User group
Requests
• Very approximate price tag: 2M€/year for 4
years.
• We would like the support of NuPECC to
implement this plan (and welcome your
suggestions).
• Collaboration launched by the EURISOL
Steering Committee in Nov. 2008
• Startup should be in fall 2009