LHC scheduling applied
to CLIC and ILC
TILC09 & GDE AAP review – Tsukuba April 2009
K. Foraz
K. Foraz - CERN
TILC09 & GDE AAP review – Tsukuba April
2009
ILC - Civil engineering works
11-7
7-5
5-3
3-1
1-2
2-4
4-6
6-10
(2.88km)
(5.54km)
(5.1km)
(2.6km)
(2.6km)
(4.6km)
(4.6km)
(2.88km)
1
2
3
4
5
6
7
Shaft excavation and Cavern-halls construction based on same hypothesis as
M. Gastal = unlimited resources
Times derived from Amberg Studies
8
9
10
Site installation & shaft excavation
Tunnel excavation
Cavern and halls
Tunnel concrete and finishes
TBM installation
K. Foraz - CERN
TILC09 & GDE AAP review – Tsukuba April 2009
ILC - Civil engineering works
11-7
7-5
5-3
3-1
1-2
2-4
4-6
6-10
(2.88km)
(5.54km)
(5.1km)
(2.6km)
(2.6km)
(4.6km)
(4.6km)
(2.88km)
1
2
3
4
5
6
7
8
Excavation : 9 TBM - 200m/wk
Concrete and finishes: 400m/wk
9
10
Site installation & shaft excavation
Tunnel excavation
Cavern and halls
Tunnel concrete and finishes
TBM installation
K. Foraz - CERN
TILC09 & GDE AAP review – Tsukuba April 2009
ILC - Civil engineering works
11-7
7-5
5-3
3-1
1-2
2-4
4-6
6-10
(2.88km)
(5.54km)
(5.1km)
(2.6km)
(2.6km)
(4.6km)
(4.6km)
(2.88km)
1
2
3
4
5
6
7
8
Civil engineering will give you part of machines, and not meters
9
10
Site installation & shaft excavation
Tunnel excavation
Cavern and halls
Tunnel concrete and finishes
TBM installation
K. Foraz - CERN
TILC09 & GDE AAP review – Tsukuba April 2009
ILC - General Services
11-7
7-5
5-3
3-1
1-2
2-4
4-6
6-10
(2.88km)
(5.54km)
(5.1km)
(2.6km)
(2.6km)
(4.6km)
(4.6km)
(2.88km)
1
2
3
4
5
6
7
8
9
10
Assumptions: unlimited resources meaning 12 teams for each type of work
and for each tunnel !!! (24 teams of electricians for instance)
Survey : geodesics & marking positions
Piping & ventilation
Electrical general services
Cabling
K. Foraz - CERN
TILC09 & GDE AAP review – Tsukuba April 2009
Estimated
progress rate per
team: around
120m/wks
ILC - Machine installation
11-7
7-5
5-3
3-1
1-2
2-4
4-6
6-10
(2.88km)
(5.54km)
(5.1km)
(2.6km)
(2.6km)
(4.6km)
(4.6km)
(2.88km)
1
2
3
4
5
6
7
8
9
10
Assumptions: unlimited resources !!!!
In summary for 7 years installation
9 TBM, 24 electricians teams, 12 cooling and ventilation teams, 12 teams for
machine installation
Are you able to provide all the machine components in 9 months ???
Support installation and alignment (250m/wk)
Machine inst.: transport and interconnections (progress rate to be confirmed 100m/wk)
K. Foraz - CERN
TILC09 & GDE AAP review – Tsukuba April 2009
Resources comparison with CLIC
CLIC
(1)
CLIC
(2)
ILC
Nb of TBM
2
9
Nb of teams for elec. general services
Nb of teams for cooling and ventilation
Nb of teams for cabling
4
4
4
24
12
24
Nb of teams for machine installation
2
12
7.2y
10.5y
What would be the ILC schedule if machine installation is
performed with 2 teams,
& what shall be the other resources ?
K. Foraz - CERN
TILC09 & GDE AAP review – Tsukuba April 2009
6y
ILC Schedule smoothed
11-7
7-5
5-3
3-1
1-2
2-4
4-6
6-10
(2.88km)
(5.54km)
(5.1km)
(2.6km)
(2.6km)
(4.6km)
(4.6km)
(2.88km)
1
2
3
4
5
6
7
8
9
10
Support installation and alignment (250m/wk)
Machine inst.: transport and interconnections (progress rate to be confirmed 100m/wk)
K. Foraz - CERN
TILC09 & GDE AAP review – Tsukuba April 2009
Resources comparison with CLIC
CLIC
(1)
CLIC
(2)
ILC
Nb of TBM
Nb of teams for elec. general services
2
4
4
8
Nb of teams for cooling and ventilation
Nb of teams for cabling
Nb of teams for machine installation
4
4
2
4
8
2
7.2y
K. Foraz - CERN
TILC09 & GDE AAP review – Tsukuba April 2009
10.5y
9.5y