B.Venkatesan
Contact: +9198945 57317 / E-Mail: [email protected]
Seeking senior managerial level assignments in Project Management / Erection & Commissioning / Operations &
Maintenance with a leading organization of repute in Electrical /Power sector preferably in Gulf / India
Profile Summary






28 years of commendable success in Project Management, Plant Operations & Maintenance, Erection, Testing &
Commissioning, Site and Resource Management in Construction, Contracting , Petro chemicals, Gas & Oil fields.
Proficient in handling the detailed engineering, erection, testing & commissioning activities & maintenance of
machinery, implementing process enhancement and quality control techniques
Expertise in implementing plans & annual turnaround with focus on optimum utilization of manpower and materials
Adept in handling process improvements and quality related activities involving resource planning, in-process
inspection and co-ordination with internal departments
A thorough professional capable of imparting training to team members so as to ensure safety and quality norms
An enterprising leader with proven dexterity in directing personnel towards accomplishment of a common goal
(Refer to Annexure for Project Details)
Core Competencies
Process Enhancement
 Managing various process improvement activities through various quality management systems
 Enhancing production process operations, optimizing resource utilization and escalating operational efficiencies
Erection, Testing & Commissioning
 Anchoring planning, erection, testing & commissioning, ensuring effective resource utilization to maximize output
 Overseeing installation & commissioning and conducting inspections to ensure operational effectiveness of utilities
People Management
 Monitoring the performance of team members to ensure efficiency in the process operations and meeting of targets
 Creating and sustaining a dynamic environment that fosters development opportunities amongst team members
Operations & Maintenance
 Effectuating preventive based maintenance schedules to increase machine uptime and equipment reliability
 Identifying areas of obstruction and taking steps to rectify equipment through application of troubleshooting tools
Organizational Experience
Sep’10 – Dec’ 12 with PLQ Contracting LLC, Dubai as Senior Project Manager
Key Result Areas:
 Spearheading the estimating activities and providing timely / accurate cost information on which to base bids for
prospective projects
 Accountable for compiling and analyzing the current data on equipment, labor, supplies, and related
factors/conditions, review of specifications
 Carrying out the review scope definition and prepare estimates of costs and lead times
 Preparing the budget and schedule in alignment with the scope as well as tracking budget and schedule with the help
of project control personnel
 Ascertaining the availability of appropriate resources to execute the project work and manage the project personnel
Previous Experience
Jan’10-Sep’10 with Cairn Energy India Pvt. Ltd., Barmer (Rajasthan), India as Lead Engineer
Jun’09-Jan’10 with Enjazcom Trading & Contracting Co., Saudi Arabia as Project Manager
Jul’08-Jun’09 with Tecnimont ICB Qatar WLL, Doha, Qatar as QA/QC (Construction) Manager (E& I)
Dec’06-Jun’08 with Gulf Petro Chemical Services & Trading LLC, Muscat, Oman & Dubai as QA/QC & Electrical Engineer
(E&I)
Jul’03-Nov’06 with Ali Haider Al Yami & Sons, Saudi Arabia as Manager (Electrical)
Jul’01-May’03 with Madura Cable Net (P) Ltd., Madurai, India as Technical Manager (Project)
Jun’95-May’01 with Saihati Industrial Services, (Tamimi Group of Company), Jeddah, Dammam, Saudi Arabia as Electrical
Engineer (Project)
Nov’92-Apr’95 with Sajjan Textiles Mills (Group of Madura Coats Ltd.), Nilakottai, India as Electrical Engineer (PlantSpinning and Weaving Mills Unit)
Nov’88-Oct’92 with United Industrial Engineers, Madurai, India as Junior Engineer Elec. (Plant- Spring Plate Manufacturing
Plant (Automobile))
Apr’87-Sep’88 with International Airports Authority of India, Madras Airport Project, Chennai, India as Technical Assistant
(Project)
Jan’86-Mar’87 with Best & Crompton Engineering, Madurai, India as Design Engineer (Project)
Apr’83-Jan’86 with Soundaram Electricals, Madurai, India as Electrical Supervisor
Academic Details



MBA (Marketing) from Kamarajar University, Madurai, India in 2006
BE (Electrical & Electronics) from Kamarajar University, Madurai, India in 1988
DEE(Diploma in Electrical & Electronics Engineering) from Tamil Nadu Polytechnic, Madurai, India in 1982
Others:
 Diploma in AutoCAD Professional (DAP)
 Diploma in Computer Hardware (DCH)
 Quality Control Lead Internal Auditor in ISO 9001-2000 by IRCA ICS Technologies, United Kingdom
Knowledge Preview

The wealth of expertise entails:
o Project Management & Commissioning
o Construction Engineering
o Maintenance Operations
o Under Ground & Over Head Line Cabling Work
o Quality Assurance & Control
o Electrical & Instrumentation Work
Personal Details
Date of Birth:
Address :
Nationality:
Passport Details:
Driving License Details:
Visa Details:
Marital Status:
Number of Dependents:
Languages Known:
19th March 1964
SFA3, Rasi Towers, Nandhini Street, Bye Pass Road, Madurai – 625010, Tamil Nadu, India
Indian
E6728089 (Issued at Trichirapalli. Valid up to 16/09/2013)
Driving License Issued at India, Oman, Qatar, UAE-Dubai & Saudi Arabia
Resident
Married
Two
English, Tamil and Hindi
ANNEXURE
PLQ Contracting, LLC, Dubai
Projects:
Period:
Role:
Accountabilities:
These are as followed:
 NCC Abudhabi-Dewa
 CCC Gmbh
 DANWAY
 Al STOM/ AREVA
 Al Futaim in Festivel City
Sep’10-Dec'12
Senior Project Manager
Deftly managed the following responsibilities:
 Experienced in planning, progress monitoring, forecasting and reporting of multi-discipline
projects as well as commercial, contractual and administrative aspects of multi-discipline
projects and engineering activities
 Installation of 132 KV GIS S/E for SF6 switch gear type EG 123-145 KV erected at CCC GmbH
Dewa project
 132 KV, 1200 Sqmm cable Cu cable laying in 3 SS, ADCO-ASAB oil field developments project
 132 KV Power Cable laying and testing consist of trench laying and trench excavation & back
filling, through erection, road crossing by HDD & open cut method
 Pre-commissioning and testing works carried out
 132 KV Cable installation and Supports at Al Barsha Site
 Actively support a working culture based on respect for health, safety and environmental
issues and maintenance of a high level of asset integrity
 Manage the scoping; assure definition and delivery of assigned topside projects on time,
within budget and to the agreed functionality
 Accountable for the technical content of the assigned topside projects
 Challenge solutions and requirements to obtain the optimal technical and economic solution
 Be actively involved in the technical execution of assigned topside project work to ensure
compliance with service, maintenance and project requirements
 Design and manage allocated projects so that it can be readily executed within the safe
operating practices of the installation
 Work with relevant interfaces to ensure that changes to activities are identified in a timely
manner and that consequences are mitigated and reflected in an updated
 Manage QA/QC systems are used to assure project quality and supplier quality plans
 Build effective working relationships with other departments
 Support good, open communication within the projects engineering department, promoting
a culture of involvement and participation and adherence to values
 Pivotal role in erection & commissioning of electrical equipments, pumps and HVAC System
 Erection, commissioning and testing, of 33 KV Panel, 11 KV Panel & 6.6 KV Panel Boards in
the substations
Cairn Energy India Pty Ltd., Barmer, Rajasthan
Project:
Period:
Role:
Accountabilities:
Mangala Oil Project, Rajasthan
Jan’10-Sep’10
Lead Engineer
Deftly managed the following responsibilities:
 Erection of equipments such as 25 MVA Transformer with PMCC units and commissioning of
well pad plant Projects
 Pivotal role in erection & commissioning of electrical equipments, pumps and HVAC System
 Erection, commissioning and the testing of 33 KV Panel, 11 KV Panel & 6.6 KV Panel Boards
in substations
 Deft in handling project activities entailing system readiness for construction and
commissioning, mobilization of supervisors and technicians to allow continuity of works and
to comply with programmed deadlines
 Total 24 well Pads 33/11 KV, 11/6.6 KV Transformers
 Heat tracing transformers, heat tracing systems, UPS & AC systems erected & commissioned
 Attend site meeting with subcontractors and main contractors to meets the requirements
and ensure the commissioned project to design requirements











EDG sets 725 KVA, 500 KVA & 320 KVA erected and synchronized with PMCC Panel in Sub
stations for emergency power systems. Synchronization checks between DG and STG
incomer carried out
Steam Power Turbine Generator 9000 KW unit Water Pumps, Steam Boiler and Control Panel
Board erection and Commissioned
Technical responsible from the electrical specification definition to the order
Responsible for the engineering interface management and Engineering milestones respect
In-charge to manage the project interfaces between internal departments, off-shore site and
the suppliers
Electrical and Instrument experience
Primary experience to be Instrument
Within the Instrument discipline good knowledge of field instrument equipment
Fire & gas, emergency shutdown systems and process control systems
Knowledge of IEC-61508 & IEC 61511 with respect to the overall safety life-cycle and
functional safety management
Experience in handling of electrical and instrument related projects
Enjazcom Trading & Contracting Co., Saudi Arabia as
Project:
Period:
Jun’09-Jan’10
Role:
Project Manager
Accountabilities:
Deftly managed the following responsibilities:
 Reviewed drawing, specifications to ensure Project ability of Erection of equipments and
HVAC systems in Petrochemical and gas plant Projects
 Ensured completeness of drawings, specifications and material take –off sheets and prepare
scope of work, bill of quantities and project cost estimate.
 Played a pivotal role in Erection and commissioning of Electrical equipments, Pumps and
HVAC System.
 Effectively controlled and maintained the necessary standards in respect of all activities
related to erection, commissioning and testing, Piping and equipments
 Handled project activities entailing system readiness for construction and commissioning,
mobilization of supervisors and technicians to allow continuity of works and to comply with
programmed deadlines.
 Planned and allocated resources to carry out the successful commissioning of all projects and
carryout feasibility studies for projects to evaluate and determine requirement.
 Participated in the preparation of conceptual design for maintenance projects together with
economic and technical justifications.
 Attended site meeting with subcontractors and main contractors to meets the requirements
and ensure the commissioned project to design requirement
Tecnimont ICB Qatar, WLL, Qatar
Project:
Role:
Period:
Accountabilities:
IOCL – Naphtha Cracker Plant- Panipat India,
Qatar Chemicals- Q Chem. II – Tecnimont and Daewoo Project
QA / QC (Construction) Manager (E& I)
Jul’08-Jun’09
Deftly managed the following responsibilities:
 Review of specifications, drawing design details for commissioning
of Electrical &
Instrumentation Units
 Efficiently handled on site problem solving, attend site meeting with subcontractors and
main contractors, liaise with consultants, compile test report to the satisfaction of the client
and ensure commissioned project meets design requirements and is acceptable to all parties
 Efficiently audit the design drawing and specification in order to ensure that the
requirements for pre- commissioning are incorporated into the installation and prepare a
method statement for each project
 Effectively control and maintain the necessary standards in respect of testing instruments
 Instigate a professional approach to the commissioning of project from order stage through
to completion of work
 Efficiently audit the design drawing and specification in order to ensure that the
requirements for pre- commissioning are incorporated into the installation and prepare a
method statement for each project
 Dealing with all Client /vendors & recommend how to improve the Project/product Quality
as per required Standard
 Quality Documents, Procedures and method statements prepared & implemented











Planning & Implementation of day-to-day activities of the gathering station, booster stations,
water injection well, gas injection well, wellhead equipments and Utilities
Scope of project reviewing, design verification at site, received materials inspection before
executing the projects
Executing the modification in Gathering stations, and attending emergency works in plant
Carrying out all Inspection and Test requirements of the contract at all stages
As per the QCP and contract requirements
Notifying the non-conformances identified during site inspection and recommending
corrective measures to Electrical Supervisor
Compiling and maintaining pertinent records of inspection and tests till the end of contract
/job order or for a retention period contractually agreed
Preparation of Preventive maintenance schedule, Shutdown Planning and follow up of
materials indenting and inspection of the received material
Training the site Technician on Maintenance Craft Procedure (MCP) & Quality Control plans
Shut down planning which includes indenting materials, arranging contractors and coordination with other departments
Preparation of Work orders and Job orders for Sub-contractors
Gulf Petro Chemical Services & Trading LLC, Muscat- Oman & Dubai
Project:
Role:
Period:
Accountabilities:
These are as followed:
 Fahud- Yibal-Haban Field Gas plant using 33KV Power Supply
 Gas Gathering Plant (GGP) Power plant 350 MW Yibal, Oman PDO Project
 Oman Gas Company Gas compression Plant, OGC Fahud Project
 Dewa DFO Pipe line and Al Weer Power Project in Dubai
QA/QC & Electrical Engineer (E&I)
Dec’06-Jun’08
Deftly managed the following responsibilities:
 Demonstrated excellence in managing a gamut of operations encompassing data collection &
ensuring adequate protection of equipments at all times and developing further procedures
 Preparing method statement for all Over head line and Underground cabling systems
 Taking stringent quality measures and monitored operation, standard maintenance and
metrics such as MTBF (Mean Time Between Failures) and MTTR (Mean Time To Repair)
 Exhibited stupendous performance in implementing preventive maintenance schedule as per
the tasks for streamlining purpose
 Effectively used the existing manpower to reduce cost and avoiding recruiting new people
 Effectively implemented the testing, installation and commissioning of mechanical /
electrical /instrumentation HVAC equipments as per drawings
 Preparations of Quality control procedures and documents
 Implementation of SHELL standards and PDO specifications
 Preparation of Test Packs and as built documents
 33 KV OHL line 75 Km erections, Testing and commissioning assistance
 Scheduling and execution the drilling stay concreting pole dressing, pole erection and
stringing activities
 Transformers, Auto re closers And RTU Units in 4 RMS Units erection & Implementation
 FOC cable 150 KM laying, Inspection, testing and commissioning
 Design and erection of Cathodic Protection systems 150 Nos erected in Gas Pipe lines
 Solar Turbine compressor plant erection and termination from Power plant
 6.6 MVA Transformer Erection, Cable laying and Execution Job
 RMU Unit 4 Nos Installed and commissioning for the Power station
 FOC cable Laying, splicing and commissioning work
 Familiar with Shell PDO Specification / DEP’s / International Standards IEC, NEC, NEMA
applicable for the contract
 Liaison with Senior QA Engineer whenever required on matters related to Qualities
Ali Haider Al Yami & Sons, Saudi Arabia
Project:
Role:
Period:
These are as followed:
 Saudi Electricity Company (SEC), Al-Khobar, Dammam & Al-Hasa
 Saudi Aramco Dammam, Underground Cable System in Power Plant (Above 750 MW)
Manager (Electrical)
Jul’03-Nov’06
Accountabilities:
Deftly managed the following responsibilities:
 Executed several Electricity Power plant projects with voltages above 750 MW
 Underground cable laying, transformers, RMU Units erection and implemented
 Preparations of Quality control documents as per ANSI specification
 Preparations of test packs for testing and commissioning works
 Effectively planned, scheduled for preventive and predictive maintenance of Equipment
(Pumps, Diesel Engines, Generators, etc.) and HVAC System
 Preparations of the 132 KV overhead line projects specifications, base design and
engineering details
 Preparation of schedule & erected up to 400 sq mm cu, cable laying, termination, minipillars
and ring main unit erection
Madura Cable Net (P) Ltd., Madurai, India
Project:
Role:
Period:
Accountabilities:
Internet Service Provider (ISP) Project170 Km over Head Line Project
Technical Manager (Project)
Jul’01-May’03
Deftly managed the following responsibilities:
 Preparation of VPN network 4 nodes connected by FOC cable connectivity
 Private telecommunications and Internet service provided to the customers
 Execute connectivity and commissioning
 Monitor network and server activity and service provider connectivity wizard
 Uplink and down link DVB connectivity monitor and servicing
Saihati Industrial Services (Tamimi Group of Company), Jeddah, Dammam – Saudi Arabia
Project:
These are as followed:
 Jeddah – Yanbu 132 KV OHL project With 350 MW Power Plant
 Al- Wedyan National Food Company – EPC- Contract
Role:
Electrical Engineer (Project)
Period:
Jun’95-May’01
Accountabilities:
Deftly managed the following responsibilities:
 Primary responsibilities include design and development of food company projects from
initial to final production
 Responsible for initial client consultation ideation stage, through to design implementation,
site optimization and final execute programming
 Quality control documents and test packs preparation
 Inspection of electrical work as per approved Aramco standards and ANSI spec
 132 KV OHL project tower erection work implementation in Jeddah- Yanbu Project
 At Food company project, all PLC control systems, transformers, gen sets, equipment related
food process erected, establish connectivity, tested and commissioned
 Tin can manufactured plant welding machine, slitter m/c, lid m/c, and filler m/.c
 Pneumatic control systems, overhead conveyor, photoelectric sensors, and optical switch
installation and commissioned
 Managed all aspects of design and production of projects & communication with clients
Sajjan Textiles Mills (Group of Madura Coats Ltd.), Nilakottai
Plant: Spinning and Weaving Mills Unit
Period:
Nov’92-Apr’95
Accountabilities:
 Responsible for operation and maintenance of all spinning & weaving Units in Electrical
equipments
 Involved in erection & power supply connection of New RUTI – C weaving units.
 Implemented AHU & Humidification unit servicing and maintenance.
 Managed servicing and re-fixing of Pneumatic units, magnetic sensors, limit switches.
 Conducted daily, weekly and monthly periodical maintenance schedules.
 All sizing units, drier units, dying unit’s equipments erected and serviced
United Industrial Engineers, Madurai
Plant: Spring Plate manufacturing Plant - Automobile
Period:
Nov’88-Oct’92
Accountabilities:
 Managed servicing and maintenance of all hydraulic systems such as slitter m/c, cutting m/c,
10 Ton power press and hydraulic press.
 Involved in installation of electrical equipments and terminations with main panel board.
 Arranged all mechanical and electrical equipments maintenance periodically.
 Responsible for programming and operations of electronically controlled PC System in
Hardening Furnace and tempering furnace
International Airports Authority of India, Madras Airport Project, Chennai, India
Project:
Period:
Role:
Accountabilities:
New International Airport (IAAI), Chennai. India
Apr’87-Sep’88
Technical Assistant (Project)
Deftly managed the following responsibilities:
 Preparation of Tender documents and drawings
 Design & erection of CCTV camera systems, surveillance equipments & intruder Alarm
systems
 Design and preparation of Fire fighting systems, gas detectors, heat detectors
 Automatic fire water pumps and related safety systems
 Design of substations, load calculations implemented
Best & Crompton Engineering, Madurai, India
Project:
Role:
Period:
Accountabilities:
TVS Chakra Tires, Shankar Cement Factory
Design Engineer (Project)
Jan’86-Mar’87
Deftly managed the following responsibilities:
 Design of power plant drawings
 Material design and erection of equipments planned
 Design and implementation of substation & transformer erection
 HT & LT electrification layout preparation and planned
 Load calculations of industry and commercial buildings designed
Soundaram Electricals, Madurai, India
Role:
Period:
Accountabilities:
Electrical Engineer
1983-1986
Deftly managed the following responsibilities:
 Servicing and maintenance of HV motors and gen sets upto 1000 KVA
 Erection of LV Transformer planned
 Lighting Pole electrification layout preparation and erection
 All kinds of commercial & Residential buildings Load details designed