5. General requirements regarding the design and manufacture of
... factory. The relative pressure of the SF6 gas shall not exceed 2 bars (2000hPa). The pole units shall be of the “sealed pressure system” type as defined by IEC 62271-100, with a service life of at least 30 years. No refilling of the gas shall be required over this period. Circuit breaker pole units ...
... factory. The relative pressure of the SF6 gas shall not exceed 2 bars (2000hPa). The pole units shall be of the “sealed pressure system” type as defined by IEC 62271-100, with a service life of at least 30 years. No refilling of the gas shall be required over this period. Circuit breaker pole units ...
FDMF6705V - Extra-Small, High-Performance, High- Frequency DrMOS Module FDMF6705V - Extra-S m
... into a thermally enhanced, ultra-compact 6x6mm PQFN package. With an integrated approach, the complete switching power stage is optimized with regards to driver and MOSFET dynamic performance, system inductance, and Power MOSFET RDS(ON). XS™ DrMOS uses Fairchild's high-performance PowerTrench® MOSFE ...
... into a thermally enhanced, ultra-compact 6x6mm PQFN package. With an integrated approach, the complete switching power stage is optimized with regards to driver and MOSFET dynamic performance, system inductance, and Power MOSFET RDS(ON). XS™ DrMOS uses Fairchild's high-performance PowerTrench® MOSFE ...
SP3220EU 数据资料DataSheet下载
... The slew rate of the SP3220E and SP3220EB outputs are internally limited to a maximum of 30V/ µs in order to meet the EIA standards (EIA RS232D 2.1.7, Paragraph 5). The transition of the loaded output from HIGH to LOW also meets the monotonicity requirements of the standard. The slew rate of the SP3 ...
... The slew rate of the SP3220E and SP3220EB outputs are internally limited to a maximum of 30V/ µs in order to meet the EIA standards (EIA RS232D 2.1.7, Paragraph 5). The transition of the loaded output from HIGH to LOW also meets the monotonicity requirements of the standard. The slew rate of the SP3 ...
AP7217
... to have excellent transient response for most applications with a small amount of output capacitance. The AP7217 is stable with any small ceramic output capacitors of 1.0μF or higher value, and the temperature coefficients of X7R or X5R type. Additional capacitance helps to reduce undershoot and ove ...
... to have excellent transient response for most applications with a small amount of output capacitance. The AP7217 is stable with any small ceramic output capacitors of 1.0μF or higher value, and the temperature coefficients of X7R or X5R type. Additional capacitance helps to reduce undershoot and ove ...
High Power White LED NSPW500BS
... All devices, equipment and machinery must be properly grounded. ・ When inspecting own final products on which LEDs were mounted, it is recommended to check also whether the mounted LEDs are damaged by static electricity or not. It is easy to find static-damaged LEDs by light emission test at lower c ...
... All devices, equipment and machinery must be properly grounded. ・ When inspecting own final products on which LEDs were mounted, it is recommended to check also whether the mounted LEDs are damaged by static electricity or not. It is easy to find static-damaged LEDs by light emission test at lower c ...
Skylla TG 24/80, 24/100, TG 24/100 3Phase, Titan
... battery. Prevent flames and sparks. Provide adequate ventilation during charging. Switching the charger on with the on/off switch results in the following: The “on” led will flash for about 2 seconds. In these first 2 seconds the charger reads all input signals and calculates the necessary output ...
... battery. Prevent flames and sparks. Provide adequate ventilation during charging. Switching the charger on with the on/off switch results in the following: The “on” led will flash for about 2 seconds. In these first 2 seconds the charger reads all input signals and calculates the necessary output ...
NAVSEA TE000-AB-GTP-010 Rev 1 With Change A Parts Derating
... The reliability achieved by military electronic systems and equipments is highly dependent on proper selection and application of the electrical and electronics parts used therein. Chapter I of this document provides requirements for three basic elements of a parts reliability program consisting of: ...
... The reliability achieved by military electronic systems and equipments is highly dependent on proper selection and application of the electrical and electronics parts used therein. Chapter I of this document provides requirements for three basic elements of a parts reliability program consisting of: ...
Folie 1 - RWTH Aachen University
... If separate DC-DC converters are used for control chips, the controls can be powered on first If one converter is employed per module, individual modules can be powered on/off In a scenario with one charge pump employed per chip, individual chips can be powered on/off Note: with SP, the whole ...
... If separate DC-DC converters are used for control chips, the controls can be powered on first If one converter is employed per module, individual modules can be powered on/off In a scenario with one charge pump employed per chip, individual chips can be powered on/off Note: with SP, the whole ...
BDTIC www.BDTIC.com/infineon AN2011-04 MA3L080E07_EVAL Evaluation Adapter Board for EconoPACK
... turns off. The standard approach for active clamping is to use a TVS diodes connected between the auxiliary collector and the gate of an IGBT module. When the Collector-Emitter voltage exceeds the diodes breakdown voltage the diodes current sums up with the current from the driver output. Due to the ...
... turns off. The standard approach for active clamping is to use a TVS diodes connected between the auxiliary collector and the gate of an IGBT module. When the Collector-Emitter voltage exceeds the diodes breakdown voltage the diodes current sums up with the current from the driver output. Due to the ...
BQ24721(C) - Texas Instruments
... The bq24721 is a high efficiency synchronous battery pack charger with high level of integration for portable applications. This device implements a high performance analog front-end that interfaces to the system power management micro-controller through a simplified SBS-like SMBus interface. The dy ...
... The bq24721 is a high efficiency synchronous battery pack charger with high level of integration for portable applications. This device implements a high performance analog front-end that interfaces to the system power management micro-controller through a simplified SBS-like SMBus interface. The dy ...
Basics of Control Components
... When excessive current is drawn for a predetermined amount of time, the overload relay’s contacts open, removing power from the motor. The following symbol is for contacts associated with a thermal overload relay. An overload relay used with a threephase motor has three such contacts, one for each p ...
... When excessive current is drawn for a predetermined amount of time, the overload relay’s contacts open, removing power from the motor. The following symbol is for contacts associated with a thermal overload relay. An overload relay used with a threephase motor has three such contacts, one for each p ...
SL1000 High-Speed Data Acquisition Unit IM 720120-01E 1st Edition
... screws. Fastening the module screws activates the protection function and the non-isolation function. It is extremely dangerous if you do not fasten the screws. In addition, if you are measuring high voltage above 42 V, be sure to use the passive probe (701940). • The BNC part of the passive probe ...
... screws. Fastening the module screws activates the protection function and the non-isolation function. It is extremely dangerous if you do not fasten the screws. In addition, if you are measuring high voltage above 42 V, be sure to use the passive probe (701940). • The BNC part of the passive probe ...
T-VER-E50B2 - Onset Computer Corporation
... The E50B2 meter has a number of different possible system wiring configurations (see Wiring Diagrams, page 5–6). To configure the meter, set the System Type via the User Interface. The System Type tells the meter which of its current and voltage inputs are valid, which are to be ignored, and if neut ...
... The E50B2 meter has a number of different possible system wiring configurations (see Wiring Diagrams, page 5–6). To configure the meter, set the System Type via the User Interface. The System Type tells the meter which of its current and voltage inputs are valid, which are to be ignored, and if neut ...
instruction manual 700151 en1501 series controls
... operates. This section of memory can be found by pressing the SELECT push buttons and paging through the functions until [ EF ] appears in the Data display window. Then use the SCHEDULE push buttons to find the needed [EF]. POWER LIGHT (19) - The red POWER lamp indicates when power is applied to the ...
... operates. This section of memory can be found by pressing the SELECT push buttons and paging through the functions until [ EF ] appears in the Data display window. Then use the SCHEDULE push buttons to find the needed [EF]. POWER LIGHT (19) - The red POWER lamp indicates when power is applied to the ...
Power Supplies
... • The output voltage can be adjusted within ±10% of the rated output voltage by using the V.ADJ control. Note that overvoltage protection may work when increasing the output voltage. • When large shocks or heavy vibrations on the PS6R are expected, the use of DIN rail or PS9Z-6R2F side-mount panel m ...
... • The output voltage can be adjusted within ±10% of the rated output voltage by using the V.ADJ control. Note that overvoltage protection may work when increasing the output voltage. • When large shocks or heavy vibrations on the PS6R are expected, the use of DIN rail or PS9Z-6R2F side-mount panel m ...
WP051 - Iso-Parallel UPS configuration
... enable the functions of the UPS needed for system integration to be controlled, but without impairing the basic functionality of the individual UPS units. If required, the control of a separate Diesel generator integrated in the system, as well as its synchronization, can be realized by the system c ...
... enable the functions of the UPS needed for system integration to be controlled, but without impairing the basic functionality of the individual UPS units. If required, the control of a separate Diesel generator integrated in the system, as well as its synchronization, can be realized by the system c ...
NCP1351ADAPGEVB NCP1351 57 W Adapter Evaluation Board User's Manual
... limitation special, consequential or incidental damages. “Typical” parameters which may be provided in SCILLC data sheets and/or specifications can and do vary in different applications and actual performance may vary over time. All operating parameters, including “Typicals” must be validated for ea ...
... limitation special, consequential or incidental damages. “Typical” parameters which may be provided in SCILLC data sheets and/or specifications can and do vary in different applications and actual performance may vary over time. All operating parameters, including “Typicals” must be validated for ea ...
Electrical substation
A substation is a part of an electrical generation, transmission, and distribution system. Substations transform voltage from high to low, or the reverse, or perform any of several other important functions. Between the generating station and consumer, electric power may flow through several substations at different voltage levels.Substations may be owned and operated by an electrical utility, or may be owned by a large industrial or commercial customer. Generally substations are unattended, relying on SCADA for remote supervision and control.A substation may include transformers to change voltage levels between high transmission voltages and lower distribution voltages, or at the interconnection of two different transmission voltages. The word substation comes from the days before the distribution system became a grid. As central generation stations became larger, smaller generating plants were converted to distribution stations, receiving their energy supply from a larger plant instead of using their own generators. The first substations were connected to only one power station, where the generators were housed, and were subsidiaries of that power station.